2 May 2022 in Frontiers of Engineering Management
Verified
Journal Article
Open access
PDF file
XYXuling Ye
Xuling Ye
Ningshuang ZengNingshuang Zeng
Ningshuang Zeng
MKMarkus König
Markus König
The development of digital transformation in the construction industry has led to the increasing adoption of smart contracts. As programmable applications to automatically write, verify, and enforce transaction conditions, smart contracts can be used in different areas mainly to improve automation level, information security, and built digital environment enhancement. However, the smart contract is commonly mentioned as a blockchain appendage, while its unique connotation and value in the construction industry have not been recognized. Therefore, this study carries out a systematic review based on 81 research articles published from 2014 to 2021 on smart contract applications in construction to explore and highlight their potentials under domain-specific requirements. Results are analyzed according to research type categorization and domain codification. Eight research domains are identified, where the three most highly explored domains are contract and payment, supply chain and logistics, and information management. The integration of smart contracts with other innovative concepts and advanced technologies is analyzed. The applicability, benefits, and challenges of smart contract applications regarding different research domains are discussed.

2 March 2019 in Sustainability
Verified
Journal Article
Open access
PDF file
PGPan Gong
Pan Gong
Ningshuang ZengNingshuang Zeng
Ningshuang Zeng
KYKunhui Ye
Kunhui Ye
MKMarkus König
Markus König
The engineering-procurement-construction (EPC) method has the potential to help construction projects achieve sustainable performance, e.g., the contractor’s early involvement, cost savings, and a reduced schedule. However, high uncertainties and complexities are contained in EPC projects. 4D BIM (Building Information Modeling) with abilities to simplify the time and space relationships of construction activities and support multi-party information sharing is beneficial to EPC project management. The behavior pattern of the project personnel toward accepting 4D BIM information systems or tools needs to be explored. Therefore, a research model of the acceptance of 4D BIM in EPC projects with eight latent constructs is proposed through a literature review of technology acceptance theories. Data is collected from a questionnaire survey and interviews. Research hypotheses are examined using PLS-SEM (partial least squares-structural equation modeling). Empirical evidence is collected from China, and implications to the developing countries facing the challenge of developing a technology-intensive construction industry are provided: (1) Adopting 4D BIM in the EPC project is beneficial; (2) the task-technology fit plays a leading role in technology acceptance; (3) the management incentive is inefficient at the operational stage. Suggestions for future research on 4D BIM acceptance in complex construction projects with abundant data and alternative models are provided.

1 November 2024 in Journal of Computing in Civil Engineering
Verified
Journal Article
Closed access
XYXuling Ye
Xuling Ye
Ningshuang ZengNingshuang Zeng
Ningshuang Zeng
XTXingyu Tao
Xingyu Tao
DHDaguang Han
Daguang Han
MKMarkus König
Markus König

6 March 2023 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
Ningshuang ZengNingshuang Zeng
Ningshuang Zeng
XYXuling Ye
Xuling Ye
Yan LiuYan Liu
Yan Liu
MKMarkus König
Markus König
Purpose: The unstable labor productivity and periodic planning method cause barriers to improving construction logistics management. This paper aims to explore a demand-driven mechanism for efficient construction logistics planning to record the material consumption, report the real-time demand and trigger material replenishment from off-site to on-site, which is aided by Building Information Modeling (BIM) and the Kanban technique.Design/methodology/approach: This paper follows the design science research (DSR) principles to propose a system of designing and applying Kanban batch with 4D BIM for construction logistics planning and monitoring. Prototype development with comparative simulation experiments of a river remediation project is conducted to analyze the conventional and Kanban-triggered supply. Two-staged industrial interviews are conducted to guide and evaluate the system design.Findings: The proposed BIM-enabled Kanban system enables construction managers and suppliers to better set integrated on- and off-site targets, report real-time demands and conduct collaborative planning and monitoring. The simulation results present significant site storage and schedule savings applying the BIM-enabled Kanban system. Feedback and constructive suggestions from practitioners are collected via interviews and analyzed for further development.Originality/value: This paper brings to the limelight the benefits of implementing BIM-enabled demand-driven replenishment to remove waste from the material flow. This paper combines lean production theory with advanced information technology to solve construction logistics management problems.

7 March 2024 in Project Leadership and Society
Verified
Journal Article
Open access
YLYan Liu
Yan Liu
Ningshuang ZengNingshuang Zeng
Ningshuang Zeng
EPEleni Papadonikolaki
Eleni Papadonikolaki
KMKirk Maritshane
Kirk Maritshane
PCPaul W. Chan
Paul W. Chan

1 January 2023 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PDF file
Ningshuang ZengNingshuang Zeng
Ningshuang Zeng
Yan LiuYan Liu
Yan Liu
MKMarkus König
Markus König
A common problem in construction is that disruptions emerging in the off-site supply chain adversely influence on-site activities. Off-site disruptions may cause substantial construction delays if they are not identified in time. Based on the production theory and four-dimensional (4D) building information modeling (BIM) applications in construction, this paper proposes a novel framework that assists in developing look-ahead supply schedules to identify potential construction delays caused by off-site disruptions. The framework adopts an extended customer order decoupling point (CODP) typology to define off-site process patterns, reflecting the production features and supply characteristics. The early warning signs of potential construction delays are captured by checking the integrated on- and off-site process and further visualized in a BIM-enabled environment. A case study is carried out to verify the feasibility of the framework and identify practical implications. Guided by the framework, construction project teams and suppliers can identify the early warning signs of potential delays, aided by specific location and duration instructions from the 4D BIM. This framework will help prevent off-site disruptions and offer adaptability for construction and logistics scheduling and planning.