A new solid target system for the TRIUMF TR13 cyclotron that can accommodate target discs with a 1-2-mm thickness and a 28-mm diameter has been developed. The target system design is based on a modified clamping mechanism of a KF-40 vacuum connector, and comprises an easy and quick ejection mechanism for the target plate. The new quick-release target system decreases the retrieval time of the irradiated target to less than 1 minute and is expected to reduce the radiation burden to operating staff by a factor of ~10.
Cyclotrons are an important tool for accelerator sciences including the production of medical isotopes for imaging and therapy. For their successful and cost-efficient operation, the planned and unplanned down time of the cyclotron needs to be kept at a minimum without compromising reliability. One of the often required maintenance activities is the replacement of the filament in the ion source. Here, we are reporting on a new ion source filament tested on a medical cyclotron and its prolonging effect on the ion source operation.