In this article the structural features of friction pairs of brakes are analyzed. Heat transfer processes with new boundary conditions are described analytically with the addition of flow conditions and the appearance of a boundary thermal layer to convective heat transfer. The joint action of heat conduction and convection fields is presented. The release of heat during friction is due to the destruction of adhesive bonds in the actual contact zones, and the stress–strain state of micro-roughnesses. It should be said that due to the presence of accompanying transfer processes, complex heat transfer is much more complex compared to purely conductive, convective, and radiative heat transfer, which significantly complicates its analytical and experimental study. In this regard, the processes of complex heat transfer are currently studied little. From the point of view of non-equilibrium thermodynamics, the main task of describing the transfer process is to establish a relationship between the magnitude of the specific flux and the surface-volume temperatures that it causes in the metallic friction elements of the brakes. Additionally, as a result, an assessment of conductive and convective heat transfer in friction pairs of brake devices was made.
The growth of the company’s investment potential is closely associated with the evaluation of the attendant risks of the process, various influencing factors, and the expected results. Therefore, the analysis of a number of qualitative and quantitative criteria of the projects and risks, as well as the potential profit-making opportunities in the investment decision making is required. This paper analyzes a decision-making strategy based on qualitative estimates obtained by investigating the risks posed, the management methods used, and the application of the proposed methods for assessing the contractor’s risk in construction companies.
Accurate prediction and management of the service life of buildings and structural components are crucial for ensuring durability and economic efficiency. This paper investigates both discrete- and continuous-time Markov chains as probabilistic models for representing deterioration processes of building structures. Transition probabilities, fundamental matrices, and absorption times are computed to quantify expected lifespans and degradation pathways. Numerical simulations illustrate how state probabilities evolve, inevitably converging toward structural failure in the absence of maintenance interventions. Additionally, this study explicitly addresses uncertainties inherent in lifecycle predictions through the application of fuzzy set theory. A fuzzy Markov chain model is formulated to represent imprecise deterioration states and transition probabilities, which validate the predictable yet uncertain progression of structural deterioration through graphical analyses and fuzzy simulations. The proposed methodology, including fuzzy modeling, provides building managers and engineers with a robust analytical framework to optimize maintenance scheduling, refurbishment planning, and resource allocation for sustainable lifecycle management under uncertainty.
A construction risk assessment is the calculated process of identifying project specific threats on a jobsite, then analysing and evaluating each risk factor to determine the likelihood, impact, and repercussions of each of those variables. That assessment creates awareness surrounding the risks/hazards identified, assess current risk prevention measures that are in-place to determine if they are sufficient or if further action needs to be taken, ensuring that any legal requirements or contract requirements are being met regarding risk and also deciding if additional controls need to be implemented or if changes need to be made to construction risk management strategy.
A continuous-time Markov chain framework is developed for service life prediction of building assets, and three formulations are compared: a homogeneous generator, a time-varying generator, and a fractional model. The framework delivers survival, density of absorption time, hazard, and mean time to absorption. For the homogeneous case, state trajectories are computed using matrix exponentials. The time-varying case is solved both by local exponential propagation on a time grid and by direct integration of the Kolmogorov equation. The fractional case is implemented in two independent ways, via a truncated series expansion and via an in-house routine for the Mittag-Leffler function, which also allows the direct evaluation of survival and hazard from the standard fractional relations while avoiding singular behaviour at the origin. This study shows that non-homogeneous rates accelerate deterioration relative to the homogeneous benchmark, whereas fractional dynamics reproduce early-time acceleration followed by a slow decline of the hazard, which is consistent with heavy-tailed survival and longer effective service life. The two fractional solvers provide mutually consistent outputs, which supports the numerical robustness of the approach. The framework is readily applicable to sparse inspection data and short observation windows and provides a transparent basis for comparing modelling assumptions that affect life cycle forecasts used in asset management and maintenance planning.
5 August 2024 in Acta Scientiarum Polonorum. Architectura
In Poland, the title of architect is a regulated profession, and many parameters must be met in order to obtain a construction license in the architectural specialty. On the other side of the Baltic Sea, in Sweden, where being an architect is also a regulated profession, the responsibility of this profession presents itself differently. The comparison of Poland and Sweden in terms of architectural professional liability aims to analyse how the architectural design process can influence the quality of architecture and the relationship between the architect and investor. By analysing these relations, one can observe the tendencies in architectural styles and the cost of building. The comparison of these two countries is based on the analysis of granting the architectural title and the required education. Another important factor in the comparison is the matter of liability. In Poland, an architect has civil responsibility, while in Sweden, an architect does not. The fact that the same architect works throughout all phases of the project in Poland allows for better implementation of the designer’s assumptions. In contrast, in Sweden, where phases of the project circulate between different architects, the creator of the concept has limited control over the end result. These differences have a big impact on the quality of architecture in general.