Donglin Li

Mr. Donglin Li

orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 May 2019 in Processes
Verified
Journal Article
Open access
PDF file
HMHongchang Miao
Hongchang Miao
DLDonglin Li
Donglin Li
Qiting ZuoQiting Zuo
Qiting Zuo
LYLei Yu
Lei Yu
XFXiaoxia Fei
Xiaoxia Fei
LHLingang Hao
Lingang Hao
Discrepancies between water demand and supply are intensifying and creating a need for sustainable water resource process management associated with rapid economic development, population growth, and urban expansion. In this study, a scenario-based interval fuzzy-credibility constrained programming (SIFCP) method is developed for planning a water resource management system (WRMS) that can handle uncertain information by using interval values, fuzzy sets, and scenario analysis. The SIFCP-WRMS model is then applied to plan the middle route of the South-to-North Water Diversion Project (SNWDP) in Henan Province, China. Solutions of different water distribution proportion scenarios and varied credibility levels are considered. Results reveal that different water-distribution proportion scenarios and uncertainties used in the SIFCP-WRMS model can lead to changed water allocations, sewage discharges, chemical oxygen demand (COD) emissions, and system benefits. Results also indicate that the variation of scenarios (i.e., from S2 to S3) can result in a change of 9% over the planning horizon for water allocation in the industrial sector. Findings can help decision-makers resolve conflicts among economic objective, water resource demand, and sewage discharge, as well as COD emissions.

9 October 2023 in Water
Verified
Journal Article
Open access
PDF file
XLxinjie li
xinjie li
QWQiang Wang
Qiang Wang
WYWang Yuanjian
Wang Yuanjian
HZHongtao Zhang
Hongtao Zhang
JLJieyu Li
Jieyu Li
DLDonglin Li
Donglin Li
Reservoir operation optimization is a technical measure for flood control and is beneficial owing to its reasonable and reliable control and application of existing water conservancy and hydropower hubs, while ensuring dam safety and flood control, as well as the normal operation of power supply and water supply. Considering the beneficial functions of reservoirs, namely flood control and ecological protection, this paper firstly established a two-objective optimal operation model for the reservoir group in the middle reaches of the Yellow River. We aim to maximize the average output of the cascade reservoir group and minimize the average change in ecological flow during the operation period under efficient sediment transport conditions, with the coordination degree of water and sediment as the constraints of reservoir discharge flows. The paper aims to construct an evaluation index system for reservoir operation schemes, apply a combined approach of objective and subjective evaluations, and introduce the gray target and cumulative prospect theories. By uniformly quantifying the established scheme evaluation index system, screening the reservoir operation schemes with the fuzzy evaluation method, and selecting the recommended scheme for each typical year, this paper provides a new scientific formulation of the operation schemes of reservoirs in the middle reaches of the Yellow River. The selected schemes are compared with actual data, demonstrating the effectiveness of joint reservoir operation and for multidimensional benefits in terms of power generation, ecology, and flood control.

26 September 2025 in Water
Verified
Journal Article
Open access
PDF file
DLDonglin Li
Donglin Li
RLRui Li
Rui Li
GLGang Liu
Gang Liu
CZChang Zhang
Chang Zhang
Multi-target optimization management of reservoirs plays a crucial role in balancing multiple scheduling objectives, thereby contributing to watershed sustainability. In this study, a model was developed for the multi-target optimization scheduling of water–sediment, ecological, and socioeconomic objectives of reservoirs with multi-dimensional scheduling needs, including flood control, sediment discharge, ecological protection, and socio-economic development. After obtaining the Pareto solution set by solving the optimization model, a decision model based on cumulative prospect theory (CPT) was constructed to select optimal scheduling schemes, resulting in the development of a multi-target decision framework for reservoirs. The proposed framework not only mitigates multi-target conflicts among water–sediment, ecological, and socioeconomic objectives but also quantifies the different preferences of decision-makers. The framework was then applied to six cascade reservoirs (Longyangxia, Liujiaxia, Haibowan, Wanjiazhai, Sanmenxia, and Xiaolangdi) in the Yellow River basin of China. A whole-river multi-target decision model was developed for water–sediment, ecological, and socioeconomic objectives, and the cooperation–competition dynamics among multiple objectives and decision schemes were analyzed for wet, normal, and dry years. The results demonstrated the following: (1) sediment discharge goals and ecological goals were somewhat competitive, and sediment discharge goals and power generation goals were highly competitive, while ecological goals and power generation goals were cooperative, and cooperation–competition relationships among the three objectives was particularly pronounced in dry years; (2) the decision plans for abundant, normal, and low water years were S293, S241, and S386, respectively, and all are consistent with actual dispatch conditions; (3) compared to local models, the whole-river multi-target scheduling model achieved increases of 71.01 × 106 t in maximum sediment discharge, 0.72% in maximum satisfaction rate of suitable ecological flow, and 0.20 × 109 kW·h in maximum power generation; and (4) compared to conventional decision methods, the CPT-based approach yielded rational results with substantially enhanced sensitivity, indicating its suitability for selecting and decision-making of various schemes. This study provides insights into the establishment of multi-target dispatching models for reservoirs and decision-making processes for scheduling schemes.

1 October 2026 in International Journal of Sediment Research
Verified
Journal Article
Open access
JLJieyu Li
Jieyu Li
LLLei Li
Lei Li
DLDonglin Li
Donglin Li
GLGang Liu
Gang Liu
GSGuoqing Sang
Guoqing Sang
YWYuanjian Wang
Yuanjian Wang

22 April 2026 in Preprints.org
Verified
Preprint
Open access
PDF file
PWPengyang Wang
Pengyang Wang
LZLing Zhang
Ling Zhang
DLDonglin Li
Donglin Li
FTFengzhen Tang
Fengzhen Tang
XWXin Wang
Xin Wang
WYWang Yuanjian
Wang Yuanjian
The traditional Muskingum model has difficulty representing complex hydraulic behaviors under high-flow conditions because it relies on simplified assumptions and fixed parameters. To address the pronounced nonlinearity and non-stationarity of flood routing in the arid Tarim River Basin, a hybrid forecasting framework was developed by coupling the Muskingum method with multiple machine-learning algorithms (Ridge, LASSO, RF, and LSTM) to predict and correct Muskingum residuals. Global Muskingum parameters were identified using the L-BFGS-B algorithm to represent basin-scale routing characteristics. For rolling forecast, a multidimensional feature space was constructed by integrating routing gradients and hydraulic interaction terms. The results indicated that all hybrid models outperformed the traditional Muskingum method across lead times. The Ridge-based hybrid model achieved the best performance at short lead times, with the Nash–Sutcliffe efficiency (NSE) at a 4-h lead time increasing from 0.56 for the physical baseline to 0.977. For longer lead times (12–24 h), the LASSO-based hybrid model demonstrated higher robustness, which was attributed to L1-regularization-based feature selection. Overall, the proposed framework alleviates systematic underestimation during high-flow periods and provides a predictive scheme for arid-region rivers that preserves physical interpretability while improving forecasting accuracy.

30 April 2026 in Water
Verified
Journal Article
Open access
PDF file
PWPengyang Wang
Pengyang Wang
LZLing Zhang
Ling Zhang
DLDonglin Li
Donglin Li
FTFengzhen Tang
Fengzhen Tang
XWXin Wang
Xin Wang
WYWang Yuanjian
Wang Yuanjian
The traditional Muskingum model has difficulty representing complex hydraulic behaviors under high-flow conditions because it relies on simplified assumptions and fixed parameters. To address the pronounced nonlinearity and non-stationarity of flood routing in the arid Tarim River Basin, a hybrid forecasting framework was developed by coupling the Muskingum method with multiple machine learning algorithms (Ridge, LASSO, RF, and LSTM) to predict and correct Muskingum residuals. Global Muskingum parameters were identified using the L-BFGS-B algorithm to represent basin-scale routing characteristics. For rolling forecast, a multidimensional feature space was constructed by integrating routing gradients and hydraulic interaction terms. The results indicated that all hybrid models outperformed the traditional Muskingum method across lead times. The Ridge-based hybrid model achieved the best performance at short lead times, with the Nash–Sutcliffe efficiency (NSE) at a 4 h lead time increasing from 0.56 for the physical baseline to 0.977. For longer lead times (12–24 h), the LASSO-based hybrid model demonstrated higher robustness, which was attributed to L1-regularization-based feature selection. The key scientific contribution of this work lies in proposing a lead-time-dependent adaptive modeling strategy, revealing the structural characteristics of the residuals of the Muskingum model, and demonstrating that, in the study basin, simple linear models outperform complex models in multi-step correction. Overall, the proposed framework alleviates systematic underestimation during high-flow periods and provides a predictive scheme for arid-region rivers that preserves physical interpretability while improving forecasting accuracy.