ZHENGWEI SHEN

Mr. ZHENGWEI SHEN

orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 March 2019 in Energies
Verified
Journal Article
Open access
PDF file
ZSZHENGWEI SHEN
ZHENGWEI SHEN
YTYong Tang
Yong Tang
JYJun Yi
Jun Yi
CCChangsheng Chen
Changsheng Chen
BZBing Zhao
Bing Zhao
GZGuangru Zhang
Guangru Zhang
An online line switching methodology to relieve voltage violations is proposed. This novel online methodology is based on a three-stage strategy, including screening, ranking, and detailed analysis and assessment stages for high speed (online application) and accuracy. The proposed online methodology performs the tasks of rapidly identifying effective candidate lines, ranking the effective candidates, performing detailed analysis of the top ranked candidates, and supplying a set of solutions for the power system. The post-switching power systems, after executing the proposed line switching action, meet the operational and engineering constraints. The results provided by the exact Alternating Current (AC) power flow are used as a benchmark to compare the speed and accuracy of the proposed three-stage methodology. One feature of the methodology is that it can provide a set of high-quality switching solutions from which operators may choose a preferred solution. The effectiveness of the proposed online line switching methodology in providing single-line switching and multiple-line switching solutions to relieve voltage violations is evaluated on the IEEE 39-bus and 2746-bus power system. The CPU time of the proposed methodology compared with that under AC power flow constitutes a speed-up of 9905.32% on a 2746-bus power system, showing good potential for online application in a large-scale power system.

20 September 2026 in Energies
Verified
Journal Article
Open access
PDF file
SHShuonan Hou
Shuonan Hou
LXLu Xinyun
Lu Xinyun
ZSZHENGWEI SHEN
ZHENGWEI SHEN
XZXiaopei Zhang
Xiaopei Zhang
Jiancun LiuJiancun Liu
Jiancun Liu
Extreme events threaten distribution network security. When remote-controlled switches (RCSs) lose remote operability during extreme events while remaining manually operable, faulted areas may no longer be isolated through remote switching alone. This paper proposes a multi-stage resilience enhancement method that coordinates RCSs and switch operation crews under RCS fault conditions. A four-stage framework is established, comprising pre-event prevention, degradation, fault isolation, and service restoration. Normal RCSs can be remotely opened to shrink the faulted zone during isolation, while faulty RCSs remain frozen and can change their switching states only through on-site crew intervention during restoration. A unified operation constraint is formulated for the isolation stage, and a crew-assisted switching constraint links crew presence at faulty-RCS locations to their switching operability during restoration. The problem is cast as a scenario-based mixed-integer linear program minimizing expected weighted load shedding across all post-event stages. Case studies on the modified IEEE 33-bus system demonstrate the effectiveness of the proposed method under different RCS availability conditions. Under the same line-fault configuration, loss of RCS remote operability increases cumulative weighted load shedding by 28.09% and delays complete load restoration by one time interval. The reported four-scenario computation required approximately 7128 s.

19 January 2024
Verified
Conference Paper
Open access
ZSZHENGWEI SHEN
ZHENGWEI SHEN
GZGuangru Zhang
Guangru Zhang
SHShuonan Hou
Shuonan Hou
GXGongwei Xi
Gongwei Xi
MFMingjian Fan
Mingjian Fan
BZBing Zhao
Bing Zhao
Aiming at the static voltage stability problem of the system after transmission line switching, a fast method for obtaining saddle node bifurcation points with variable step sizes is proposed in this paper. The sensitivity method is adopted to ensure that the step size can be self-adjusted with the change of slope at the operating point; the dichotomy method is incorporated into the step size adjustment algorithm to deal with the situation that the predicted operating point i+1 is separated from the upper half of the P-V curve; and the local curve fitting technology is used to improve the accuracy of the solution. The simulation results based on the IEEE 39 bus systems show the effectiveness of the proposed method. Comparisons with the results of the continuous power flow method show that the proposed method has the advantages of computational efficiency and accuracy, and has the potential to be applied to large power grids online.