Chuan Chen

Prof. Chuan Chen


Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 2018 in Journal of Infrastructure Systems
Verified
Journal Article
Closed access
FBFengyu Bao
Fengyu Bao
Albert ChanAlbert Chan
Albert Chan
CChuan Chen
Chuan Chen
Amos DarkoAmos Darko
Amos Darko
The process of developing a public–private partnership (PPP) is complex and dynamic throughout the project’s life cycle of project identification, preparation, procurement, implementation, transfer, and posttransfer phases. Although interests in reviewing general trends and diverse topics of the PPP literature have increased over the years, there is a lack of a systematic review of the PPP literature from the perspective of project life cycle. The purpose of this study is to analyze the research status and possible future studies from the viewpoint of project life cycle. The review is conducted by searching related papers from seven leading construction management journals, then classifying them into distinct phases to facilitate further discussion on significant research topics. The findings show that different PPP phases encounter different problems, attracting uneven attention from researchers. Specifically, the transfer phase, which is the end of PPP contract life cycle and the starting point of posttransfer operation, requires systematic research in the future. The outcomes of this study reveal the relationship between important project problems and corresponding PPP phases, which may serve as valuable reference for PPP participants to develop effective project management strategies, and for PPP researchers to better understand PPP research with specific focus on varied PPP phases.

1 March 2018 in Journal of Infrastructure Systems
Verified
Journal Article
Closed access
YYYao Yu
Yao Yu
Albert ChanAlbert Chan
Albert Chan
CChuan Chen
Chuan Chen
Amos DarkoAmos Darko
Amos Darko
The importance of transnational public–private partnership (TPPP) has accelerated over the last decade, and the critical risk factors (CRFs) of TPPP have gained increasing attention from both researchers and practitioners. However, a systematic review of the extant literature on TPPP CRFs is unavailable. This study addresses this gap by conducting a systematic review of 37 selected papers on TPPP published in peer-reviewed journals from 1991 to 2015. The papers are reviewed to study the trend in the annual publication on TPPP CRFs, contributions of various countries and researchers to TPPP CRF-related studies, the most frequently identified TPPP CRFs, and research methods adopted in TPPP CRF–related studies. The results of this study indicate an increasing trend in research publications on TPPP CRFs, and the most frequently identified TPPP CRFs are found to be legal risk, cooperation risk, tariff risk, financing risk, and political risk. The research methodologies adopted are case study, qualitative discussion, survey, and hybrid methods. This study provides a useful reference for researchers and practitioners to appreciate the research trend and development of TPPP CRFs and to enhance their understanding of the CRFs for TPPP projects for risk management activities. The developed checklist of TPPP CRFs also makes this paper useful for researchers to conduct further empirical studies.

2 May 2018 in Sustainable Development
Verified
Journal Article
Closed access
PDF file
YYYao Yu
Yao Yu
Robert Osei-KyeiRobert Osei-Kyei
Robert Osei-Kyei
Albert ChanAlbert Chan
Albert Chan
CChuan Chen
Chuan Chen
IMIgor Martek
Igor Martek

1 December 2018 in Journal of Infrastructure Systems
Verified
Journal Article
Closed access
YYYao Yu
Yao Yu
Amos DarkoAmos Darko
Amos Darko
Albert ChanAlbert Chan
Albert Chan
CChuan Chen
Chuan Chen
FBFengyu Bao
Fengyu Bao
Due to the growing trend of world economic globalization and “The Belt and Road” initiative launched by the Chinese government, transnational public–private partnership (TPPP) has become a crucial way for construction and investment companies to invest in other countries. However, investing in another country for PPP projects is not free of risks, due mainly to unfamiliarity with different environments and conditions. This paper aims at identifying and evaluating risk factors in TPPP projects. Drawing on the X hydropower project, the identified 22 critical risk factors affecting the TPPP project were assessed by industry experts who had direct involvement in the project. The intuitionistic fuzzy analytic hierarchy process (IFAHP) technique was used in the assessment of the risk factors. The results indicated that technology, natural environment, construction, administrative, and political risk were the top five risk factors. The findings of this study improve the understanding of the risk factors in TPPP projects and could be useful for risk management professionals and researchers. Future research is needed to develop risk assessment and management models for TPPP projects based on current risk factors in TPPP projects.

28 May 2022 in Journal of Asian Architecture and Building Engineering
Verified
Journal Article
Open access
QZQingPing Zhong
QingPing Zhong
HTHui Tang
Hui Tang
CChuan Chen
Chuan Chen
IMIgor Martek
Igor Martek
Construction projects may be procured by various means: design-build (DB), design-bid-build (DBB), construction management at risk (CM-at risk), and integrated project delivery (IPD), among many others. Each approach must be considered in selecting the most appropriate procurement strategy for any specific project. Thus, in making that choice, a selection approach along with selection criteria need to be considered. This study seeks to reassert clarity by consolidating the available literature on factors impacting project delivery selection and presenting a definitive, comprehensive list of those factors. The approach relies on systematic analysis. An initial retrieved 224 papers across 53 journals was reduced to 45 papers relevant to construction projects. These each offered between four to 39 factors. An examination and rationalization of themes distilled to a definitive 22 criteria and 35 sub-criteria. Chief among these, in descending order of reported frequency, were: owner related issues, contractor issues, time, cost, quality, contract disputes, risk, market conditions, regulation, complexity, innovation, scope, site, community support, project size, project type, resource availability, natural disasters, political impact, sustainability, culture, and safety. The factors will vary project-to-project, and a discussion of the impacts of these factors on the project delivery method selection is offered.

4 March 2019 in Sustainability
Verified
Journal Article
Open access
PDF file
Robert Osei-KyeiRobert Osei-Kyei
Robert Osei-Kyei
Albert ChanAlbert Chan
Albert Chan
YYYao Yu
Yao Yu
CChuan Chen
Chuan Chen
Yongjian KeYongjian Ke
Yongjian Ke
BTBashir Tijani
Bashir Tijani
Sustainability is a global issue and its enhancement through modern forms of procurements, such as public-private partnership (PPP), has become topical considering the huge impact of PPP activities on society, the economy, and the environment. However, one way of promoting sustainability thorough PPPs is the adoption of social responsibility (SR) initiatives/factors. This paper aims to empirically investigate the SR factors in PPPs through a comparative study between China and Ghana. An empirical questionnaire survey was conducted in both China and Ghana. Further, the mean score ranking, Kendall’s coefficient of concordance, and Mann-Whitney U test were used for data analysis. Results show that SR factors related to the economic efficiency of PPP projects and climate change adaptation are critical in China, whereas in Ghana, SR factors directly related to job creation and environmental protection are critical. The outputs of this study inform investors of the critical SR initiatives to consider when engaging in PPPs in Asia and Africa. In addition, they provide a solid knowledge base for the continuous international debate on how sustainability could be enhanced through PPP policy.