Hongjun Joo

Dr. Hongjun Joo


Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
9 July 2019 in Sustainability
Verified
Journal Article
Open access
PDF file
HJHongjun Joo
Hongjun Joo
CCChanghyun Choi
Changhyun Choi
JKJungwook Kim
Jungwook Kim
DKDeokhwan Kim
Deokhwan Kim
SKSoojun Kim
Soojun Kim
Hung Soo KimHung Soo Kim
Hung Soo Kim
Floods are natural disasters that should be considered a top priority in disaster management, and various methods have been developed to evaluate the risks. However, each method has different results and may confuse decision-makers in disaster management. In this study, a flood risk assessment method is proposed to integrate various methods to overcome these problems. Using factor analysis and principal component analysis (PCA), the leading indicators that affect flood damage were selected and weighted using three methods: the analytic hierarchy process (AHP), constant sum scale (CSS), and entropy. However, each method has flaws due to inconsistent weights. Therefore, a Bayesian network was used to present the integrated weights that reflect the characteristics of each method. Moreover, a relationship is proposed between the elements and the indicators based on the weights called the Integrated Index for Flood Risk Assessment (InFRA). InFRA and other assessment methods were compared by receiver operating characteristics (ROC)-area under curve (AUC) analysis. As a result, InFRA showed better applicability since InFRA was 0.67 and other methods were less than 0.5.

30 July 2019 in Water
Verified
Journal Article
Open access
PDF file
KKKyunghun Kim
Kyunghun Kim
HJHongjun Joo
Hongjun Joo
DHDaegun Han
Daegun Han
SKSoojun Kim
Soojun Kim
TLTaewoo Lee
Taewoo Lee
Hung Soo KimHung Soo Kim
Hung Soo Kim
Rainfall data is frequently used as input and analysis data in the field of hydrology. To obtain adequate rainfall data, there should be a rain gauge network that can cover the relevant region. Therefore, it is necessary to analyze and evaluate the adequacy of rain gauge networks. Currently, a complex network analysis is frequently used in network analysis and in the hydrology field, Pearson correlation is used as strength of link in constructing networks. However, Pearson correlation is used for analyzing the linear relationship of data. Therefore, it is now suitable for nonlinear hydrological data (such as rainfall and runoff). Thus, a possible solution to this problem is to apply mutual information that can consider nonlinearity of data. The present study used a method of statistical analysis known as the Brock–Dechert–Scheinkman (BDS) statistics to test the nonlinearity of rainfall data from 55 Automated Synoptic Observing System (ASOS) rain gauge stations in South Korea. Analysis results indicated that all rain gauge stations showed nonlinearity in the data. Complex networks of these rain gauge stations were constructed by applying Pearson correlation and mutual information. Then, they were compared by computing their centrality values. Comparing the centrality rankings according to different thresholds for correlation showed that the network based on mutual information yielded consistent results in the rankings, whereas the network, which based on Pearson correlation exhibited much variability in the results. Thus, it was found that using mutual information is appropriate when constructing a complex network utilizing rainfall data with nonlinear characteristics.

11 October 2019 in Entropy
Verified
Journal Article
Open access
PDF file
HJHongjun Joo
Hongjun Joo
JLJiho Lee
Jiho Lee
HJHwandon Jun
Hwandon Jun
KKKyungtak Kim
Kyungtak Kim
SHSeungjin Hong
Seungjin Hong
Hung Soo KimHung Soo Kim
Hung Soo Kim
Stream gauge stations are facilities for measuring stream water levels and flow rates, and their main purpose is to produce the data required to analyze hydrological phenomena. However, there are no specific criteria for selecting the locations and installation densities of stream gauge stations, which results in numerous problems, including regional imbalances and overlapping. To address these issues, a stream gauge network was constructed in this study considering both the transinformation of entropy (objective function 1) and the importance of each stream gauge station (objective function 2). To account for both factors, the optimal combinations that satisfied the two objective functions were determined using the Euclidean distance. Based on the rainfall runoff analysis results, unit hydrographs reflecting stream connectivity were derived and applied to entropy theory. The importance of each stream gauge station was calculated considering its purposes, such as flood control, water use, and environment. When this method was applied to the Namgang Dam Basin, it was found out that eight out of 12 stream gauge stations were required. The combination of the selected stations reflected both the transinformation of entropy and the importance of each station.

23 April 2019 in Water
Verified
Journal Article
Open access
PDF file
MLMyungjin Lee
Myungjin Lee
NKNarae Kang
Narae Kang
HJHongjun Joo
Hongjun Joo
Hung Soo KimHung Soo Kim
Hung Soo Kim
SKSoojun Kim
Soojun Kim
JLJongso Lee
Jongso Lee
The purpose of this study is to reduce the uncertainty in the generation of rainfall data and runoff simulations. We propose a blending technique using a rainfall ensemble and runoff simulation. To create rainfall ensembles, the probabilistic perturbation method was added to the deterministic raw radar rainfall data. Then, we used three rainfall-runoff models that use rainfall ensembles as input data to perform a runoff analysis: The tank model, storage function model, and streamflow synthesis and reservoir regulation model. The generated rainfall ensembles have increased uncertainty when the radar is underestimated, due to rainfall intensity and topographical effects. To confirm the uncertainty, 100 ensembles were created. The mean error between radar rainfall and ground rainfall was approximately 1.808–3.354 dBR. We derived a runoff hydrograph with greatly reduced uncertainty by applying the blending technique to the runoff simulation results and found that uncertainty is improved by more than 10%. The applicability of the method was confirmed by solving the problem of uncertainty in the use of rainfall radar data and runoff models.

21 May 2021 in Energies
Verified
Journal Article
Open access
PDF file
SJSungeun Jung
Sungeun Jung
YBYoung Hye Bae
Young Hye Bae
JKJongsung Kim
Jongsung Kim
HJHongjun Joo
Hongjun Joo
Hung Soo KimHung Soo Kim
Hung Soo Kim
JJJaewon Jung
Jaewon Jung
Small hydropower (SHP) plants are advantageous as they have a short construction period and can be easily maintained. They also have a higher energy density than other alternative energy sources as environmentally-friendly energy sources. In general, hydropower potential is estimated based on the discharge in the river basin, and the discharge can be obtained from the stage station in the gaged basin. However, if there is no station (i.e., ungaged basin) or no sufficient discharge data, the discharge should be estimated based on rainfall data. The flow duration characteristic model is the most widely used method for the estimation of mean annual discharge because of its simplicity and it consists of rainfall, basin area, and runoff coefficient. Due to the characteristics of hydroelectric power depending on the discharge, there is a limit to guaranteeing the accuracy of estimating the generated power with only one method of the flow duration characteristic model. Therefore, this study assumes the gaged basins of the three hydropower plants of Deoksong, Hanseok, and Socheon in Korea exist as ungaged basins and the river discharges were simulated using the Kajiyama formula, modified-TPM(Two-Parameter Monthly) model, and Tank model for a comparison with the flow duration characteristics model. Furthermore, to minimize the uncertainty of the simulated discharge, four blending techniques of simple average method, MMSE(Multi-Model Super Ensemble), SMA(Simple Model Average), and MSE(Mean Square Error) were applied. As for the results, the obtained discharges from the four models were compared with the observed discharge and we noted that the discharges by the Kajiyama formula and modified-TPM model were better fitted with the observations than the discharge by the flow duration characteristics model. However, the result by the Tank model was not well fitted with the observation. Additionally, when we investigated the four blending techniques, we concluded that the MSE technique was the most appropriate for the discharge simulation of the ungaged basin. This study proposed a methodology to estimate power generation potential more accurately by applying discharge simulation models that have not been previously applied to the estimation of SHP potential and blending techniques were also used to minimize the uncertainty of the simulated discharge. The methodology proposed in this study is expected to be applicable for the estimation of SHP potential in ungaged basins.

6 November 2020 in Stochastic Environmental Research and Risk Assessment
Verified
Journal Article
Closed access
PDF file
JKJaewon Kwak
Jaewon Kwak
HJHongjun Joo
Hongjun Joo
JJJaewon Jung
Jaewon Jung
JLJongso Lee
Jongso Lee
SKSoojun Kim
Soojun Kim
Hung Soo KimHung Soo Kim
Hung Soo Kim