solomon Teffera

Dr. solomon Teffera

Dire Dawa university
orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 July 2019 in Water
Verified
Journal Article
Open access
PDF file
STsolomon Teffera
solomon Teffera
CFClifford Fedler
Clifford Fedler
DADr Mekonnen Ayana
Dr Mekonnen Ayana
With climate change prevailing around the world, understanding the changes in long-term annual and seasonal rainfall at local scales is very important in planning for required adaptation measures. This is especially true for areas such as the Awash River basin where there is very high dependence on rain- fed agriculture characterized by frequent droughts and subsequent famines. The aim of the study is to analyze long-term trends of annual and seasonal rainfall in the Awash River Basin, Ethiopia. Monthly rainfall data extracted from Climatic Research Unit (CRU 4.01) dataset for 54 grid points representing the entire basin were aggregated to find the respective areal annual and seasonal rainfall time series for the entire basin and its seven sub-basins. The Mann-Kendall (MK) test and Sen Slope estimator were applied to the time series for detecting the trends and for estimating the rate of change, respectively. The Statistical software package R version 3.5.2 was used for data extraction, data analyses, and plotting. Geographic information system (GIS) package was also used for grid making, site selection, and mapping. The results showed that no significant trend (at α = 0.05) was identified in annual rainfall in all sub-basins and over the entire basin in the period (1902 to 2016). However, the results for seasonal rainfall are mixed across the study areas. The summer rainfall (June through September) showed significant decreasing trend (at α ≤ 0.1) over five of the seven sub-basins at a rate varying from 4 to 7.4 mm per decade but it showed no trend over the two sub-basins. The autumn rainfall (October through January) showed no significant trends over four of the seven sub-basins but showed increasing trends over three sub-basins at a rate varying from 2 to 5 mm per decade. The winter rainfall (February through May) showed no significant trends over four sub-basins but showed significant increasing trends (at α ≤ 0.1) over three sub-basins at a rate varying from 0.6 to 2.7 mm per decade. At the basin level, the summer rainfall showed a significant decreasing trend (at α = 0.05) while the autumn and winter rainfall showed no significant trends. In addition, shift in some amount of summer rainfall to winter and autumn season was noticed. It is evident that climate change has shown pronounced effects on the trends and patterns of seasonal rainfall. Thus, the study contribute to better understanding of climate change in the basin and the information from the study can be used in planning for adaptation measures against a changing climate.

1 January 2025 in Advances in Civil Engineering
Verified
Journal Article
Open access
ADAbdisalam Yusuf Duale
Abdisalam Yusuf Duale
WHWerku Koshe Hareru
Werku Koshe Hareru
TGTewodros T Ghebrab
Tewodros T Ghebrab
STsolomon Teffera
solomon Teffera
TGTewodros Gedefaye
Tewodros Gedefaye
Construction delays (CDs) pose persistent challenges in building projects, leading to budget and schedule overruns. This study aimed to investigate the root causes of CD in Somaliland, and ranks the factors based on significance. A cross‐sectional study design was employed to collect quantitative data through questionnaires and qualitative insights through interviews with key industry stakeholders. In total, 95 delay factors were considered and 41 were selected through preliminary screening. Among the 41 tested factors the critical top 10 factors were identified. It is found that poor construction site management is the first significant cause of delay in projects (relative importance index, RII = 0.863). The escalation of material prices secured the second position (RII = 0.834). The lack of capable consultants takes the third rank (RII = 0.833). Poor resource management by contractors and low labor productivity, inadequate early planning, take the fourth, fifth, and sixth ranks, respectively. Interview findings agree with these results, highlighting poor construction management practices, delay in payments, poor cash‐flow managements, inadequate project planning, and material price escalation, lack of capable consultants, weather conditions, and inaccurate project estimations. In conclusion, poor site management, escalation of materials price, lack of capable consultants, low productivity of labor, lack of supervision, inadequate early planning of the project, delay in payment, and poor cash‐flow management are critical factors requiring attention to improve timely completion. Therefore, the stakeholders in Somaliland and similar contexts can proactively work on assigning the right person in the right position, develop a comprehensive project plan that includes a detailed resource allocation strategy, clearly define the scope of work for consultants, including their responsibilities, deliverables, and project milestones, and conduct regular inspections of the site to identify any potential issues or deviations from the project plan. Additionally, the project clients should ensure timely payment, and the contractors should enhance their cash‐flow management.

5 August 2025 in Preprints.org
Verified
Preprint
Open access
PDF file
STsolomon Teffera
solomon Teffera
AYArega Birhanu Yimer
Arega Birhanu Yimer
Cost and time overruns are the critical challenges for construction projects. The consequences can extend beyond just monetary losses, causing project delays and even project cancellation, with repercussions for various stakeholders potentially impacting the broader economy. The study aims to analyse quantitatively the cost and time overruns in public building projects in Dire Dawa city over the past 17 years. Long year’s quantitative cost and duration data for 99 public building projects were collected from different documents including contractual agreement, schedules, and financial records available from clients, contractors, and consultants. The data were analysed using descriptive statistics, Mann Kendall trend analysis, and Sen Slope estimation method. The findings revealed that over the period 2008 -2024, about 45.5 % of projects experienced both cost and time overruns, 12.2% experienced only cost overruns, and 32.2% experienced only time overruns. About 90% of the major public projects have experienced either cost or time overruns in the study area over the period. The remaining 10 % of projects were completed ahead of schedule and at lower cost than the plan. As to the extent of overruns, on average, projects exceeded their budgets by 20.7%. Around 50% of the projects experienced cost overruns of 16.5% or less. Similarly, projects delayed from planned schedule by an average of 229.1%. Around half of the projects experienced time overruns of 267% or less. The trend analysis revealed the percentage change in time over runs have showed no statistically significantly trend in the period (2008–2024). However, that percentage change in cost over runs have showed statistically significantly increasing trend in the period at a rate of 200% per year. It is clear that the prevalence and magnitude of time and cost overruns are generally significant and the temporal patterns of change in overruns are generally negative. It can be concluded that public project management efficiency with regard to cost and time management has not only been generally poor but also remained at unimproved for duration and either declining or unimproved for cost over the different periods despite efforts being put in to place in the industry. Therefore, it is required to identify site specific interventions in the planning, design, and implementation phases and implement the interventions to ensure more efficient public project management.

28 August 2025 in Preprints.org
Verified
Preprint
Open access
PDF file
STsolomon Teffera
solomon Teffera
Proper irrigation scheduling can help to ensure judicial use of water resources, reduce cost of irrigation, and minimize the risks of water management related problems such as waterlogging and salinization. This papers aims to identify the most suitable irrigation scheduling practices for Fincha sugarcane Plantation using modelling and simulation model, CROPWAT, and statistical methods. All data required for modelling and simulation in CROPWAT related to climate, soil, crop, and system parameter were collected and the model was run for irrigation scheduling scenarios formulated using four major irrigation scheduling methods: Fixed, Partially, Mixed Schedule, and On-demand schedule. The model was run for 22 selected scheduling scenarios over replicated over three seasons to simulate performance of irrigation scheduling. The Correlation analysis were carried out to identify the nature of relationship among the performance indicators, analysis of variances (ANOVA) were carried out to check if the irrigation scheduling scenarios have significant effect on irrigation scheduling performance, and multiple least significant difference (MLSD) were carried out to compare the mean values of performance indicators. All the analysis were carried out using R statistical software. It is found that the efficiency of irrigation schedules and efficiency of rainfall are highly correlated while the deficiency and yield reduction are significantly correlated. The ANOVA shows the irrigation scheduling scenarios have significant effect on performance indicators. The MLSD shows on demand scheduling and mixed irrigation scheduling showed highest, equal, and consistent performance for all performance indicators. Considering manageability under existing design, the mixed irrigation scheduling can generally be considered optimal for both soils in Fincha sugar estate. Therefore, it is recommended that the sugar estate shall implement mixed irrigation scheduling practices for optimal yield and water use efficiency.

16 January 2024 in Research Square
Verified
Preprint
Open access
PDF file
YGYohannes E. Gebreegziabher
Yohannes E. Gebreegziabher
WHWerku Koshe Hareru
Werku Koshe Hareru
STsolomon Teffera
solomon Teffera
This study investigated the impact of burlap fibers on the workability and mechanical properties of concrete. Five different levels of burlap fiber content were tested, and it was found that all fiber contents in the range of 0.1 to 0.85% (wt.) can produce fresh workable concrete. The fiber content had no significant effect on the compressive strength but had a significant effect on the tensile strength and water absorption capacity of the C25 concrete. Among the different concentrations tested, 0.6% (wt.) burlap fibers exhibited the best performance. The results of the permeability test and microstructural analysis of the images further confirmed that a fiber content of 0.6% (wt.) can ensure stronger and more durable concretes. Therefore, it is recommended to use 0.6% burlap fiber to enhance the tensile strength significantly (by approximately + 3.8% relative to the control) while maintaining similar compressive strength and water absorption capacity as conventional C25 concrete.

1 January 2026 in International Journal of Agronomy
Verified
Journal Article
Open access
STsolomon Teffera
solomon Teffera
Proper irrigation scheduling can help to ensure judicial use of water resources, improve crop yield, reduce the cost of irrigation, and minimize the risks of water management–related problems such as waterlogging and salinization. This paper aims to identify the most suitable irrigation scheduling practices for the Fincha sugarcane plantation using the modeling and simulation model, CROPWAT, and statistical methods. All data required for modeling and simulation in the model were collected, and the model was run for 22 selected irrigation scheduling scenarios. The irrigation scheduling scenarios were formulated by combining different options of scheduling from four major irrigation scheduling methods: fixed or rigid schedule, partially flexible schedule, mixed schedule, and on‐demand schedule. The model was run for the 22 selected scheduling scenarios and three replications across seasons to estimate the performance of irrigation scheduling. Four indicators—the efficiency of irrigation schedule (EIS), the deficiency of irrigation schedule (DIS), the efficiency of rain (ER), and the percentage yield reduction (YR) simulated in the model—were used to assess the performance of irrigation scheduling. The correlation analysis was carried out to identify the nature of the relationship among the performance indicators. In addition, the analysis of variances (ANOVA) was carried out to check if the irrigation scheduling scenarios have a significant effect on irrigation scheduling performance. Furthermore, a multiple least significant difference (MLSD) test was carried out to compare the mean values of performance indicators. All the analyses were carried out using R statistical software. It is found that the EIS and the ES are highly correlated, while the DIS and YR are significantly correlated. The ANOVA shows that the irrigation scheduling scenarios have a significant effect on performance indicators. The MLSD shows on‐demand scheduling, and mixed irrigation scheduling showed the highest, equal, and consistent performance for all performance indicators. Considering manageability under the existing design, the mixed irrigation scheduling scenarios consisting of predetermined depth of applications varying with growth stage and irrigation interval based on soil moisture deficit can generally be considered optimal for both soils in the Fincha sugar estate. An average irrigation schedule efficiency of 90.9% in Luvisol and 100% in Vertisol, as well as an irrigation rain efficiency of 61.7% in Luvisol and 65% in Vertisol, can be attained with the mixed irrigation scheduling scenarios. In addition, the deficiency irrigation schedule and YR can be kept at 0.0% for both soils. Therefore, it is recommended that the sugar estate shall implement the identified mixed irrigation scheduling practices for optimal yield and water‐use efficiency. This approach can be used for the identification of optimal irrigation schedules at reasonable accuracy. Further study focusing on the validation of the results might be needed to address the inherent limitations of modeling and simulations in estimating performance indicators.