Building information modeling (BIM) has entered into another phase of maturity, especially in countries that have been actively adopting and using BIM including in Taiwan, Republic of China. An effective management in BIM has increasingly become one of the demanding features in Taiwanese architecture, engineering, construction, and operation industries, particularly in dealing with the legal issues associated with BIM implementation. Therefore, the research aims to develop a preliminary contractual framework for BIM-based contract administration. Two objectives underpin the research, namely, (1) to identify the potential legal aspects that need to be considered in BIM-enabled projects, and (2) to determine the related contract provisions required in BIM contracts. The questionnaire survey method was adopted through a selective sampling approach in Taiwan. Thirty-six valid and completed questionnaires were analyzed. The results identify 21 related contract provisions that could potentially be used in BIM contracts. Following a thorough analytical discussion, these contract provisions were then incorporated into the developed contractual framework. While paving the way for a robust contractual mechanism for BIM-enabled projects in the future, the research contributes to the body of knowledge for BIM-based contract administration.
Although there are many discussions of the legal implications of BIM, none of the studies provides a comprehensive review of the legal issues associated with BIM; nor do they evaluate the solutions currently available to address the issues. This paper aims to provide a critical review of the legal issues arising from using BIM and of their associated solutions. A systematic review was conducted of fifty-five (55) journal articles and conference papers published from 2007 to 2017 to identify the legal issues. The identified legal issues were then analysed in relation to the solutions provided by the construction industry. The results of the study revealed that (1) an alternative project delivery approach that does not modify the original orientation of the design-bid-build procurement structure is required to deliver BIM effectively. (2) The potential change in the standard of care for project participants due to additional roles required in delivering BIM needs further investigation. (3) The roles for auditing a BIM delivery system must be included in the contracts to ensure the quality and compliance of BIM deliverables. The study not only reviews the legal issues associated with BIM, but more importantly, it also offers significant insights for future research.
1 March 2014 in Journal of Construction Engineering and Management
Despite the significant benefits associated with building information modeling (BIM), the industry has not properly addressed a host of legal issues, risks, and barriers. Intellectual Property Rights (IPR) is of primary concern; therefore, this paper attempts to discuss IPR in the context of BIM application. It reviews the two issues of who a BIM’s copyright owner should be and how to avoid infringement of IPR raised by the previous literature and proposes solutions. Interviews were conducted with experts in Taiwan to discuss opinions on these two issues. Moreover, experts were also asked to comment on two new issues raised by this study: (1) possible ways in which professional knowledge relating to business can be protected; and (2) ways in which work on elements of BIM can be protected. Combining the results of literature reviews and interviews, this study concludes the issues of BIM application in IPR perspectives and suggests solutions. The importance of these issues and their proposed solutions is validated by a questionnaire distributed among various other experts, and the results are given. This paper not only summarizes the BIM’s IPR issues but also proposes practical solutions accordingly.
26 February 2019 in KSCE Journal of Civil Engineering
The effective adoption and use of Building Information Modeling (BIM) require appropriate contract design to fairly allocate the contracting parties’ rights and responsibilities. Several standards for BIM protocols and contracts have been developed for the industry. However, the awareness and the use of these are rather limited, leading to unclear provisions in BIM contracts. Therefore, the research aims to identify the influential legal aspects that serve as the latent contract provisions in BIM contracts. A questionnaire survey was conducted to survey experts and active BIM users in construction projects. The data were analyzed using Social Network Analysis (SNA) by assuming interdependent relationships among various the legal aspects in BIM contacts. The key legal aspects associated with BIM contracts pertain to the roles and responsibilities of the project participants. The results also reveal that data security is the center of all latent legal aspects in the contracts. The study provides significant new insights into clarifying the required contract provisions in BIM contracts.
1 January 2006 in Journal of Construction Engineering and Management
The application of network techniques of project scheduling to repetitive projects has been criticized for the inability of network techniques to help maintain work continuity. Moreover, current network techniques require a large number of activities to represent a repetitive project and presume that there is only one logical sequence. This makes schedules time consuming to develop as well as maintain. Further, the logic chosen by the planner might be far from the shortest possible duration. This paper, utilizing the soft logic sequencing principles developed by Fan et al., develops a system which provides an easy input module in addition to scheduling and work-continuity-maintenance modules. The system eases the network generation and update processes, which in turn provides the shortest possible duration logics and the start and finish dates required to maintain work continuity.