Yanling Jia

Yanling Jia


Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 January 2021 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
YJYanling Jia
Yanling Jia
AOAohui Ouyang
Aohui Ouyang
SWSiyu Wang
Siyu Wang
XLXing Liang
Xing Liang
BWBin Wang
Bin Wang
FYFei Ye
Fei Ye
In this study, we developed a tunnel excavation model test system to investigate the deformation and mechanical response of the surrounding rocks and tunnel structure during the reconstruction and expansion of an existing shallow single‐hole tunnel into a twin‐arch tunnel. A model test was conducted to study the variation in the ground surface settlement characteristics, surrounding rock pressure, and internal stresses of the supporting structure and midwall during the construction process. The influence of the excavation distance on displacements and structural stress between the faces of the left and right tunnels was analysed using numerical software. A comparison between the model test results and the monitoring and measurement construction results revealed a fairly consistent ground surface settlement, indicating that the system is stable and reliable and can be widely applied to laboratory model test research on tunnel excavation. Results show that the excavation of the first tunnel had a significant effect on the stability of the surrounding rock within the distance of a single‐tunnel span behind the tunnel face. When the excavation distance between the two tunnels exceeded twice the length of the single‐tunnel span, its effect on the stresses and deformation of the reconstructed twin‐arch tunnel was negligible.

24 December 2019 in Advances in Materials Science and Engineering
Verified
Journal Article
Open access
PDF file
YJYanling Jia
Yanling Jia
YXYongxu Xia
Yongxu Xia
XCXindong Chen
Xindong Chen
YZYongdi Zhou
Yongdi Zhou
XHXingbo Han
Xingbo Han
SZShaowen Zhou
Shaowen Zhou
At present, there are an ever-increasing number of tunnel expansion projects in China. Studying the mechanical properties of the expanded tunnels is of great significance for guiding their safe construction. Through model testing and numerical simulation, the mechanical properties of a double-arch tunnel constructed through the expansion of the middle pilot heading from an existing single-tube tunnel were studied. The variation characteristics of the surface subsidence, surrounding rock stress, and stress and strain of the middle partition wall and lining during the tunnel reconstruction and expansion were investigated. The mechanism for transferring stress and strain between the left and right tunnel tubes was studied by a numerical simulation method. The results showed that the surface subsidence caused by the excavation of the left (i.e., the subsequent) tunnel tube was larger, and the maximum surface subsidence occurred at the right (i.e., the first) tunnel tube. The surrounding rock on the middle wall was the sensitive part of the tunnel excavation, the stress of the surrounding rock at the left spandrel of the right tunnel tube fluctuated and exhibited the most complex variation, and the stress of the surrounding rock at the right spandrel of the left tunnel tube exhibited the largest variation. The excavation of the left tunnel tube had a great influence on the forces of the middle partition wall and the lining structure of the right tunnel tube, the middle partition wall was subjected to eccentric compression towards the left tunnel tube, and the stress at the left spandrel under the initial support of the right tunnel tube exhibited complex variations. The excavation of the left and right tunnel tubes had a great influence on the stability of the surrounding rock, as well as on the force-induced deformation of the middle partition wall and the support structure, within the width of the single tunnel tube span behind the tunnel working face. Due to the different construction sequences, the stress and strain at the symmetric measurement points of the middle partition wall, as well as the left and right tunnel support structures, were very different.

1 March 2020 in IOP Conference Series: Materials Science and Engineering
Verified
Conference Paper
Open access
YJYanling Jia
Yanling Jia
OLOuyang Lu
Ouyang Lu
SZShaowen Zhou
Shaowen Zhou
GWGang Wang
Gang Wang
Junchang Tunnel passes through fault fracture zone where joints and fracture developed, the water-rich zone is wide and the geological condition is extremely complex, which is likely to induce the water gushing and mud gushing. Based on the project, the proper thickness of curtain grouting ring for the life-cycle of tunnel in water-rich fault fracture zone is analyzed, and the main conclusions are as follows: (1) Comprehensive advance geological forecast including ultra-high density resistance method, land sonar method, transient electromagnetic method and drilling method are adopted to achieve good prediction results in the fault fracture zone of DK7+812 to DK7+862; (2) The full-face curtain grouting method can effectively reduce the formation deformation caused by tunnel excavation in the tunnel construction in water-rich fault fracture zone, and the effect of water plugging is great; (3) According to the formula of thick wall tube, the experience of grouting and water plugging in existing tunnels, and the comparison of finite element method, the thickness of curtain grouting ring should be greater than 5m to meet the safety requirements. Considering the safety requirements and the reduction of curtain grouting ring in the operation period, the thickness of curtain grouting ring needs to be increased to 7m.