Benjamin  Omell

Dr. Benjamin Omell


Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 November 2018 in Processes
Verified
Journal Article
Open access
PDF file
PSParikshit Sarda
Parikshit Sarda
EHEli Hedrick
Eli Hedrick
KRKatherine Reynolds
Katherine Reynolds
DBDebangsu Bhattacharyya
Debangsu Bhattacharyya
Stephen ZitneyStephen Zitney
Stephen Zitney
BOBenjamin Omell
Benjamin Omell
Traditional energy production plants are increasingly forced to cycle their load and operate under low-load conditions in response to growth in intermittent renewable generation. A plant-wide dynamic model of a supercritical pulverized coal (SCPC) power plant has been developed in the Aspen Plus Dynamics® (APD) software environment and the impact of advanced control strategies on the transient responses of the key variables to load-following operation and disturbances can be studied. Models of various key unit operations, such as the steam turbine, are developed in Aspen Custom Modeler® (ACM) and integrated in the APD environment. A coordinated control system (CCS) is developed above the regulatory control layer. Three control configurations are evaluated for the control of the main steam; the reheat steam temperature is also controlled. For studying servo control performance of the CCS, the load is decreased from 100% to 40% at a ramp rate of 3% load per min. The impact of a disturbance due to a change in the coal feed composition is also studied. The CCS is found to yield satisfactory performance for both servo control and disturbance rejection.

26 July 2021
Verified
Conference Paper
Open access
PDF file
PLPeng Liu
Peng Liu
BOBenjamin Omell
Benjamin Omell
CLCan Li
Can Li
IGIgnacio Grossmann
Ignacio Grossmann
Achieving net zero carbon emissions likely requires future power systems to integrate new, flexible energy technologies to accommodate higher levels of capacity from variable renewable energy sources. To determine the optimal deployment of new electricity capacity and to study the likelihood of deployments of new energy technologies, an expansion planning model has been developed as part of the IDAES-Enterprise suite of grid models. The Generation Expansion Planning (GEP) model is a multi-period model in which investment decisions occur yearly, and a Unit Commitment (UC) problem is examined on an hourly timescale. To reduce computational complexity of the GEP model, the UC problem is solved for average “representative days” which leaves out extreme, but relatively common, scenarios in which low renewable generation occurs, leaving the system with inadequacy in capacity. The IDAES-Enterprise GEP model has been modified to include these extreme scenarios while keeping the model reasonably tractable. Specifically, a lazy constraint technique was implemented to check for capacity adequacy on an hourly basis over a large data set of aligned load-wind-solar profiles. As a vast majority of the capacity constraints will not be violated, the technique lowers computational expense by searching for violated capacity constraints over an “iterative manner,” adding those infeasible constraints back into the model. Results on a test case of the Southwest Power Pool shows that the lazy constraint technique significantly reduces retirements and increases installments of natural gas combined cycles and flexible natural gas units. It also reduces some retirements of coal units. These modifications provide a more reasonable estimation of required dispatchable power generation capacity to ensure feasibility during peak net load.

6 April 2025 in arXiv
Verified
Preprint
Open access
PDF file
PLPeng Liu
Peng Liu
LCLian Cheng
Lian Cheng
BOBenjamin Omell
Benjamin Omell
ABAnthony P. Burgard
Anthony P. Burgard
Generation planning approaches face challenges in managing the incompatible mathematical structures between stochastic production simulations for reliability assessment and optimization models for generation planning, which hinders the integration of reliability constraints. This study proposes an approach to embedding reliability verification constraints into generation expansion planning by leveraging a weighted oblique decision tree (WODT) technique. For each planning year, a generation mix dataset, labeled with reliability assessment simulations, is generated. An WODT model is trained using this dataset. Reliability-feasible regions are extracted via depth-first search technique and formulated as disjunctive constraints. These constraints are then transformed into mixed-integer linear form using a convex hull modeling technique and embedded into a unit commitment-integrated generation expansion planning model. The proposed approach is validated through a long-term generation planning case study for the Electric Reliability Council of Texas (ERCOT) region, demonstrating its effectiveness in achieving reliable and optimal planning solutions.