View All Publications
17 November 2018 in Processes
Verified
Journal Article
Open access
PDF file
PSParikshit Sarda
Parikshit Sarda
EHEli Hedrick
Eli Hedrick
KRKatherine Reynolds
Katherine Reynolds
DBDebangsu Bhattacharyya
Debangsu Bhattacharyya
Stephen ZitneyStephen Zitney
Stephen Zitney
BOBenjamin Omell
Benjamin Omell
Traditional energy production plants are increasingly forced to cycle their load and operate under low-load conditions in response to growth in intermittent renewable generation. A plant-wide dynamic model of a supercritical pulverized coal (SCPC) power plant has been developed in the Aspen Plus Dynamics® (APD) software environment and the impact of advanced control strategies on the transient responses of the key variables to load-following operation and disturbances can be studied. Models of various key unit operations, such as the steam turbine, are developed in Aspen Custom Modeler® (ACM) and integrated in the APD environment. A coordinated control system (CCS) is developed above the regulatory control layer. Three control configurations are evaluated for the control of the main steam; the reheat steam temperature is also controlled. For studying servo control performance of the CCS, the load is decreased from 100% to 40% at a ramp rate of 3% load per min. The impact of a disturbance due to a change in the coal feed composition is also studied. The CCS is found to yield satisfactory performance for both servo control and disturbance rejection.

26 September 2017 in Journal of Engineering for Gas Turbines and Power
Verified
Journal Article
Closed access
PDF file
ELEric Liese
Eric Liese
Stephen ZitneyStephen Zitney
Stephen Zitney
A generic training simulator of a natural gas combined cycle (NGCC) was modified to match operations at a real plant. The objective was to use the simulator to analyze cycling operations of the plant. Initial operation of the simulator revealed the potential for saturation conditions in the final high pressure superheater (HPSH) as the attemperator tried to control temperature at the superheater outlet during gas turbine loading and unloading. Subsequent plant operational data confirmed simulation results. Multiple simulations were performed during loading and unloading of the gas turbine to determine operational strategies that prevented saturation and increased the approach to saturation temperature. The solutions included changes to the attemperator temperature control setpoints and strategic control of the steam turbine (ST) inlet pressure control valve.