Diogo Martins

Mr. Diogo Martins

orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
23 January 2020 in Environmental Science and Pollution Research
Verified
Journal Article
Open access
PDF file
Maria De Lurdes DinisMaria De Lurdes Dinis
Maria De Lurdes Dinis
AFAntónio Manuel Antunes Fiuza
António Manuel Antunes Fiuza
AFAurora Futuro
Aurora Futuro
ALAlexandre Leite
Alexandre Leite
DMDiogo Martins
Diogo Martins
Maria Cristina VilaMaria Cristina Vila
Maria Cristina Vila
The characterization of historical mine tailings provides important information for land-management decisions, in particular when considering potential reprocessing activities or the development of an environmental protection program. In addition, outcomes from such characterization may define the scope for a more detailed investigation. The present work describes the characterization of the waste material from the Cabeço do Pião tailings impoundment performed within the project ReMinE: Improve Resource Efficiency and Minimize Environmental Footprint. The purpose of the work was to investigate alternative mine waste management options such as the extraction of valuable resources from an environmental liability. The study involved the collection of 41 samples at different locations at two different depths, physical and chemical characterization of the wastes, natural leaching tests, and potential for acid generation. The results showed that, apart from the potential instability of the dyke (with an average slope of 35°), the drained solutions flowing by percolation contain very small particles with high arsenic contents that are being incorporated into the river sediments. In addition, these very fine-grained materials are available for the transport by the wind creating secondary sources of environmental contamination. This data is fundamental for economic and environmental assessment of the two main alternatives, reprocessing or removal.

1 March 2019 in Minerals Engineering
Verified
Journal Article
Closed access
JFJanine Rodrigues Figueiredo
Janine Rodrigues Figueiredo
Maria Cristina VilaMaria Cristina Vila
Maria Cristina Vila
JGJoaquim Góis
Joaquim Góis
BBBárbara Pavani Biju
Bárbara Pavani Biju
AFAurora Futuro
Aurora Futuro
AFAntónio Manuel Antunes Fiuza
António Manuel Antunes Fiuza

1 January 2018 in Journal of Sustainable Mining
Verified
Journal Article
Open access
JFJanine Rodrigues Figueiredo
Janine Rodrigues Figueiredo
Maria Cristina VilaMaria Cristina Vila
Maria Cristina Vila
KMKristina Matos
Kristina Matos
DMDiogo Martins
Diogo Martins
AFAurora Futuro
Aurora Futuro
AFAntónio Manuel Antunes Fiuza
António Manuel Antunes Fiuza

17 October 2019 in Minerals
Verified
Journal Article
Open access
PDF file
JFJanine Rodrigues Figueiredo
Janine Rodrigues Figueiredo
Maria Cristina VilaMaria Cristina Vila
Maria Cristina Vila
AFAntónio Manuel Antunes Fiuza
António Manuel Antunes Fiuza
JGJoaquim Góis
Joaquim Góis
AFAurora Futuro
Aurora Futuro
DMDiogo Martins
Diogo Martins
Demand growth for metallic minerals has been faced with the need for new techniques and improving technologies for all mining life-cycle operations. Nowadays, the exploitation of old tailings and mine-waste facilities could be a solution to this demand, with economic and environmental advantages. The Panasqueira Mine has been operating for more than a century, extracting tungsten and tin ore. Its first processing plant, “Rio”, was located near the Zêrere river, where mineral-processing residues were deposited on the top hillside on the margin of this river in the Cabeço do Pião tailings dam. The lack of maintenance and monitoring of this enormous structure in the last twenty years represents a high risk to the environment and the population of the surrounding region. A field-sample campaign allowed the collection of data, and resulted from laboratory tests to use regression optimization. Re-mining the tailings by hydrometallurgical methods was considered to satisfy the two conditions of metal demand and environmental risk. The metal content in Cabeço do Pião was shown be enough for environmental restoration. The re-mining solution was studied, taking into account the technical, economic, social, and environmental aspects.

5 February 2021 in Journal of Industrial Engineering and Management
Verified
Journal Article
Open access
PDF file
DMDiogo Martins
Diogo Martins
Luis FonsecaLuis Fonseca
Luis Fonseca
PAPaulo Avila
Paulo Avila
JBJoão Bastos
João Bastos
Purpose: The study purpose was to analyse the excellence and operational efficiency of Portuguese industrial companies through the measurement of lean practices implementation. Additionally, it intended to propose a new model to assess the lean production system.Design/methodology/approach: The research presents an in-depth lean literature review that served as a basis for the creation of a questionnaire. The survey was addressed to Portuguese industrial companies to obtain data about their lean implementation success. Collected data were analysed, resorting descriptive and exploratory statistics. A principal component analysis was applied to reduce the amount of data and define a new model that characterizes the lean practices adoption level. Some Chi-square tests were used to assess the independence of some variables.Findings: The results indicate that a significant percentage of organizations use lean practices within their activity. Concerning the lean implementation maturity, a plus side revealed by the study concerns the adoption of the teamwork, internal information shared principles, increase of process capability to produce conforming products, and reduction in set up times. On the other hand, responsibilities decentralization, more employees acting as team leaders, implementation of employees’ suggestions, and interconnection with suppliers, are some of the principles that need to be given greater attention by the Portuguese industrial organizations. The key contribution consists of a new model for lean determinants based on three dimensions: work method, productive process elements, and work efficiency.Originality/value: The present research provides a new Lean determinants model that allows understanding the importance of the operational efficiency provided by a mature lean production system, being the key to the competitiveness in the global business market.

1 August 2019 in Preprints.org
Verified
Preprint
Open access
JFJanine Rodrigues Figueiredo
Janine Rodrigues Figueiredo
Maria Cristina VilaMaria Cristina Vila
Maria Cristina Vila
AFAntónio Fiúza
António Fiúza
JGJoaquim Góis
Joaquim Góis
AFAurora Futuro
Aurora Futuro
DMDiogo Martins
Diogo Martins
The growth of demand for metallic minerals has faced with the need for new techniques and improving technologies for all mine life cycle operations. Nowadays, the exploitation of old tailings and mine wastes facilities could represent a solution to this demand, with economic and environmental advantages. W-Sn Panasqueira Mine has been operating for more than 100 years. Its first processing plant “Rio” was located near Zêrere river being the mineral processing residues deposited on the top hillside on the margin of this river in Cabeço do Pião tailings dam. The lack of maintenance and monitoring of this enormous structure in the last twenty years represents high risks to the environment and population of the surrounding region. The re-mining of the tailings by hydrometallurgical methods was considered, in order to satisfy these two enounced conditions - metals demand and environmental risk, aiming for the sale of the metal to pay the environmental intervention. Field samples campaign allowed collecting data and results from laboratory tests driving to use regression optimization. The re-mining solution was studied, taking into account the technical, economic, social, and environmental aspects.