Janine Rodrigues Figueiredo

Dr. Janine Rodrigues Figueiredo

orcid

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
23 January 2020 in Environmental Science and Pollution Research
Verified
Journal Article
Open access
PDF file
Maria De Lurdes DinisMaria De Lurdes Dinis
Maria De Lurdes Dinis
AFAntónio Manuel Antunes Fiuza
António Manuel Antunes Fiuza
AFAurora Futuro
Aurora Futuro
ALAlexandre Leite
Alexandre Leite
DMDiogo Martins
Diogo Martins
Maria Cristina VilaMaria Cristina Vila
Maria Cristina Vila
The characterization of historical mine tailings provides important information for land-management decisions, in particular when considering potential reprocessing activities or the development of an environmental protection program. In addition, outcomes from such characterization may define the scope for a more detailed investigation. The present work describes the characterization of the waste material from the Cabeço do Pião tailings impoundment performed within the project ReMinE: Improve Resource Efficiency and Minimize Environmental Footprint. The purpose of the work was to investigate alternative mine waste management options such as the extraction of valuable resources from an environmental liability. The study involved the collection of 41 samples at different locations at two different depths, physical and chemical characterization of the wastes, natural leaching tests, and potential for acid generation. The results showed that, apart from the potential instability of the dyke (with an average slope of 35°), the drained solutions flowing by percolation contain very small particles with high arsenic contents that are being incorporated into the river sediments. In addition, these very fine-grained materials are available for the transport by the wind creating secondary sources of environmental contamination. This data is fundamental for economic and environmental assessment of the two main alternatives, reprocessing or removal.

1 March 2019 in Minerals Engineering
Verified
Journal Article
Closed access
JFJanine Rodrigues Figueiredo
Janine Rodrigues Figueiredo
Maria Cristina VilaMaria Cristina Vila
Maria Cristina Vila
JGJoaquim Góis
Joaquim Góis
BBBárbara Pavani Biju
Bárbara Pavani Biju
AFAurora Futuro
Aurora Futuro
AFAntónio Manuel Antunes Fiuza
António Manuel Antunes Fiuza

1 January 2018 in Journal of Sustainable Mining
Verified
Journal Article
Open access
JFJanine Rodrigues Figueiredo
Janine Rodrigues Figueiredo
Maria Cristina VilaMaria Cristina Vila
Maria Cristina Vila
KMKristina Matos
Kristina Matos
DMDiogo Martins
Diogo Martins
AFAurora Futuro
Aurora Futuro
AFAntónio Manuel Antunes Fiuza
António Manuel Antunes Fiuza

18 August 2022 in Minerals
Verified
Journal Article
Open access
PDF file
VTVidal Félix Navarro Torres
Vidal Félix Navarro Torres
JFJanine Rodrigues Figueiredo
Janine Rodrigues Figueiredo
RHRaul De La Hoz
Raul De La Hoz
MBMárcio Botaro
Márcio Botaro
LCLeonardo Soares Chaves
Leonardo Soares Chaves
Innovation has an important role in improving the productivity, safety and sustainability of mining operations. Historically, ore transport was done by diesel trucks, but with the commitment to reduce CO2 emissions and increase mine safety, mining companies have invested in innovative, more sustainable ore transport technologies. The innovative truckless system, with the intensive use of belt conveyors to transport the ore from the mine to the processing plant, represents a huge project and capital investment. However, operation costs are lower when considering the decrease of fuel use and also maintenance expenses. This paper presents an economic analysis of a mine-to-crusher model to estimate and minimize the operating expenses of an open-pit iron mine located in northern Brazil. The activities at this truckless mine consist of drilling and blasting, loading and primary crushing. In this study, the calibration of the mine-to-crusher model was based on rock fragmentation from the blasting phase. The costs of each mine operation phase were estimated for an optimum 80% passing size (P80). The calibration was conducted with the values of technical and economic parameters in 2019. By considering the structural lithologies of canga and jaspillites, we concluded that the P80 value that minimizes costs might be in the range from 0.31 to 0.34 m.

17 October 2019 in Minerals
Verified
Journal Article
Open access
PDF file
JFJanine Rodrigues Figueiredo
Janine Rodrigues Figueiredo
Maria Cristina VilaMaria Cristina Vila
Maria Cristina Vila
AFAntónio Manuel Antunes Fiuza
António Manuel Antunes Fiuza
JGJoaquim Góis
Joaquim Góis
AFAurora Futuro
Aurora Futuro
DMDiogo Martins
Diogo Martins
Demand growth for metallic minerals has been faced with the need for new techniques and improving technologies for all mining life-cycle operations. Nowadays, the exploitation of old tailings and mine-waste facilities could be a solution to this demand, with economic and environmental advantages. The Panasqueira Mine has been operating for more than a century, extracting tungsten and tin ore. Its first processing plant, “Rio”, was located near the Zêrere river, where mineral-processing residues were deposited on the top hillside on the margin of this river in the Cabeço do Pião tailings dam. The lack of maintenance and monitoring of this enormous structure in the last twenty years represents a high risk to the environment and the population of the surrounding region. A field-sample campaign allowed the collection of data, and resulted from laboratory tests to use regression optimization. Re-mining the tailings by hydrometallurgical methods was considered to satisfy the two conditions of metal demand and environmental risk. The metal content in Cabeço do Pião was shown be enough for environmental restoration. The re-mining solution was studied, taking into account the technical, economic, social, and environmental aspects.

13 June 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
JFJanine Rodrigues Figueiredo
Janine Rodrigues Figueiredo
VTVidal Félix Navarro Torres
Vidal Félix Navarro Torres
RCRodolfo Cruz
Rodolfo Cruz
DMDouglas Soares Moreira
Douglas Soares Moreira
Rock blasting with explosives is the first stage of rock fragmentation and plays a key role in the results of the mining chain. Fragmentation optimization is achieved by considering the energy efficiency of the explosive, the optimal distribution of explosive energy in the rocky mass, and the programmed and controlled release of explosive energy during blasting. The quality of fragmentation is usually performed using tools that estimate the sizes of fragments via the analysis of two- or three-dimensional images. This article presents a study of the rock fragmentation optimization of very compact itabirites, based on four blasting tests, performed in a different way from the conventional blasting design. The fragmentation analysis was performed using the PortaMetricsTM tool, and compared with the Kuznetsov and Rosin–Rammler particle size distribution model, to compare the reliability of this tool. Finally, the mine productivity after blasting was estimated from the particle size distribution obtained in the tests. The model presented idealistic results considering the technical parameters used in the equations. However, the PortaMetricsTM tool suggests good performance for the preliminary evaluation of blast design.