Nowadays, energy networks including electricity, natural gas and heat are integrated in a unit namely “Energy Hub The energy hub has led a great opportunity for energy system operators to achieve a system with higher efficiency as well as better performance. In this paper, optimal energy management of an energy hub is proposed to simultaneously minimize the operation costs and emissions (inside and outside the hub) in the presence of wind turbine and demand response. Also, in the proposed energy hub, combination of fuel cell and electrolyzer and hydrogen storage tank is used as a hydrogen storage system to store extra hydrogen or electricity. The problem is solved as a two-objective MILP optimization problem in GAMS. The simulation results obtained by the proposed model show the appropriate effect of the model on an optimal management of energy hub in a daily operation.
Real-time monitoring of the power system by phasor measurement units (PMUs) leads to the development of such devices in a wide area measurement system (WAMS). However, the power system observability cannot be obtained by employing only PMUs. The communication infrastructure (CI) is a significant part of the WAMS that has to be optimally designed and implemented to collect data from PMUs and deliver them to control centers. In this paper, a novel hybrid wireless sensor network is proposed for the connection of PMUs throughout the system to enable convenient and low-cost communication media. The problem of observability in the communication system is checked along with the optimal placement of PMUs in the power system to reach full observability. A hybrid wireless sensor network including plug-in powered sensor nodes (PPSNs) and energy harvesting sensor nodes (EHSNs) is utilized for increasing the reliability of the communication system. In the proposed co-optimal PMU-sensor placement problem, the main objective is to minimize the total cost of PMU placement and the related communication system, considering full observability of the power system and CI. To achieve better results, the zero-injection bus (ZIB) effect and system observability redundancy index (SORI) are considered as a constraint in the objective function. A binary-coded genetic algorithm is used for solving the proposed mixed-objective optimization problem subject to different technical operating constraints. The proposed method is examined on IEEE 13-bus and IEEE 37-bus test feeder systems. The results show the applicability and effectiveness of the proposed method compared with the conventional methods in this subject area.
The substation expansion planning (SEP) is a complicated problem with a wide variety of its constraints. This paper presents a novel and efficient method to solve optimal SEP problem to determine optimal number, location, capacity, timing, and associated service area of each substation under all technical constraints over the planning period at minimum costs. In this respect, the genetic algorithm (GA) based k-means algorithm is developed to overcome some disadvantage of k-means algorithm to find optimal locations of new substations without any predetermined candidate locations. In this case, the GA is adapted based on k-means to place the substations in the centroid of their loads while location of existing ones is fixed. Moreover, allowable loading of substation is considered by a determined penalty cost in object function of GA to prevent placing substations where they may be overloaded. Then, the greedy heuristic algorithm is used to solve dynamic programming for optimal load assignment based on priority of load connection. The technical constraints such as permissible voltage drop and maximum loading substations, thermal limit of MV feeder, radial network is considered at this stage. The proposed method is used to solve optimal pseudo-dynamic SEP problem for Tabriz, which is the capital city of East Azerbijan province of Iran to verify efficiency and capability.
15 May 2019 in Turkish Journal of Electrical Engineering and Computer Sciences