P. O’Donovan

Dr. P. O’Donovan

orcid

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 November 2015 in Journal of Big Data
Verified
Journal Article
Open access
PDF file
POP. O’Donovan
P. O’Donovan
KLK. Leahy
K. Leahy
DODanny O'Connell Danny O'Connell
Danny O'Connell Danny O'Connell
DOD. T. J. O’sullivan
D. T. J. O’sullivan
The term smart manufacturing refers to a future-state of manufacturing, where the real-time transmission and analysis of data from across the factory creates manufacturing intelligence, which can be used to have a positive impact across all aspects of operations. In recent years, many initiatives and groups have been formed to advance smart manufacturing, with the most prominent being the Smart Manufacturing Leadership Coalition (SMLC), Industry 4.0, and the Industrial Internet Consortium. These initiatives comprise industry, academic and government partners, and contribute to the development of strategic policies, guidelines, and roadmaps relating to smart manufacturing adoption. In turn, many of these recommendations may be implemented using data-centric technologies, such as Big Data, Machine Learning, Simulation, Internet of Things and Cyber Physical Systems, to realise smart operations in the factory. Given the importance of machine uptime and availability in smart manufacturing, this research centres on the application of data-driven analytics to industrial equipment maintenance. The main contributions of this research are a set of data and system requirements for implementing equipment maintenance applications in industrial environments, and an information system model that provides a scalable and fault tolerant big data pipeline for integrating, processing and analysing industrial equipment data. These contributions are considered in the context of highly regulated large-scale manufacturing environments, where legacy (e.g. automation controllers) and emerging instrumentation (e.g. internet-aware smart sensors) must be supported to facilitate initial smart manufacturing efforts.

11 September 2015 in Journal of Big Data
Verified
Journal Article
Open access
PDF file
POP. O’Donovan
P. O’Donovan
KLKevin Leahy
Kevin Leahy
DODanny O'Connell Danny O'Connell
Danny O'Connell Danny O'Connell
DODominic T. J. O’sUllivan
Dominic T. J. O’sUllivan
The manufacturing industry is currently in the midst of a data-driven revolution, which promises to transform traditional manufacturing facilities in to highly optimised smart manufacturing facilities. These smart facilities are focused on creating manufacturing intelligence from real-time data to support accurate and timely decision-making that can have a positive impact across the entire organisation. To realise these efficiencies emerging technologies such as Internet of Things (IoT) and Cyber Physical Systems (CPS) will be embedded in physical processes to measure and monitor real-time data from across the factory, which will ultimately give rise to unprecedented levels of data production. Therefore, manufacturing facilities must be able to manage the demands of exponential increase in data production, as well as possessing the analytical techniques needed to extract meaning from these large datasets. More specifically, organisations must be able to work with big data technologies to meet the demands of smart manufacturing. However, as big data is a relatively new phenomenon and potential applications to manufacturing activities are wide-reaching and diverse, there has been an obvious lack of secondary research undertaken in the area. Without secondary research, it is difficult for researchers to identify gaps in the field, as well as aligning their work with other researchers to develop strong research themes. In this study, we use the formal research methodology of systematic mapping to provide a breadth-first review of big data technologies in manufacturing.

1 January 2018 in Manufacturing Letters
Verified
Journal Article
Closed access
POP. O’Donovan
P. O’Donovan
CGColm Gallagher
Colm Gallagher
DODanny O'Connell Danny O'Connell
Danny O'Connell Danny O'Connell
DODominic T.J. O'SUllivan
Dominic T.J. O'SUllivan

1 September 2019 in Computers in Industry
Verified
Journal Article
Closed access
POP. O’Donovan
P. O’Donovan
CGColm Gallagher
Colm Gallagher
KLKevin Leahy
Kevin Leahy
DODominic T.J. O’sUllivan
Dominic T.J. O’sUllivan

9 January 2019 in Energies
Verified
Journal Article
Open access
PDF file
KLKevin Leahy
Kevin Leahy
CGColm Gallagher
Colm Gallagher
POP. O’Donovan
P. O’Donovan
Dominic O'SullivanDominic O'Sullivan
Dominic O'Sullivan
In order to remain competitive, wind turbines must be reliable machines with efficient and effective maintenance strategies. However, thus far, wind turbine reliability information has been closely guarded by the original equipment manufacturers (OEMs), and turbine reliability studies often rely on data that are not always in a usable or consistent format. In addition, issues with turbine maintenance logs and alarm system data can make it hard to identify historical periods of faulty operation. This means that building new and effective data-driven condition monitoring techniques and methods can be challenging, especially those that rely on supervisory control and data acquisition (SCADA) system data. Such data are rarely standardised, resulting in challenges for researchers in contextualising these data. This work aims to summarise some of the issues seen in previous studies, highlighting the common problems seen by researchers working in the areas of condition monitoring and reliability analysis. Standards and policy initiatives that aim to alleviate some of these problems are given, and a summary of their recommendations is presented. The main finding from this work is that industry would benefit hugely from unified standards for turbine taxonomies, alarm codes, SCADA operational data and maintenance and fault reporting.

3 July 2018 in Energies
Verified
Journal Article
Open access
PDF file
KLKevin Leahy
Kevin Leahy
CGColm Gallagher
Colm Gallagher
POP. O’Donovan
P. O’Donovan
DODanny O'Connell Danny O'Connell
Danny O'Connell Danny O'Connell
Dominic O'SullivanDominic O'Sullivan
Dominic O'Sullivan
Using 10-minute wind turbine supervisory control and data acquisition (SCADA) system data to predict faults can be an attractive way of working toward a predictive maintenance strategy without needing to invest in extra hardware. Classification methods have been shown to be effective in this regard, but there have been some common issues in their application within the literature. To use these data-driven methods effectively, historical SCADA data must be accurately labelled with the periods when turbines were down due to faults, as well as with the reason for the fault. This can be manually achieved using maintenance logs, but can be highly tedious and time-consuming due to the often unstructured format in which this information is stored. Alarm systems can also help, but the sheer volume of alarms and false positives generated complicate efforts. Furthermore, a way to implement and evaluate the field deployed system beyond simple classification metrics is needed. In this work, we present a prescribed and reproducible framework for: (i) automatically identifying periods of faulty operation using rules applied to the turbine alarm system; (ii) using this information to perform classification which avoids some of the common pitfalls observed in literature; and (iii) generating alerts based on a sliding window metric to evaluate the performance of the system in a real-world scenario. The framework was applied to a dataset from an operating wind farm and the results show that the system can automatically and accurately label historical stoppages from the alarms data. For fault prediction, classification scores are quite low, with precision of 0.16 and recall of 0.49, but it is envisaged that this can be greatly improved with more training data. Nonetheless, the sliding window metric compensates for the low raw classification scores and shows that 71% of faults can be predicted with an average of 30 h notice, with false alarms being active for 122 h of the year. By adjusting some of the parameters of the fault prediction alerts, the duration of false alarms can be drastically reduced to 2 h, but this also reduces the number of predicted faults to 8%.