Douglas Mazzinghy

Dr. Douglas Mazzinghy

orcid

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2015 in Minerals Engineering
Verified
Journal Article
Closed access
Douglas MazzinghyDouglas Mazzinghy
Douglas Mazzinghy
CSClaudio L. Schneider
Claudio L. Schneider
VAVladmir K. Alves
Vladmir K. Alves
RGRoberto Galéry
Roberto Galéry

10 April 2021 in Minerals
Verified
Journal Article
Open access
PDF file
PBPriscila Brandão
Priscila Brandão
Douglas MazzinghyDouglas Mazzinghy
Douglas Mazzinghy
RGRoberto Galéry
Roberto Galéry
LMLuís C. R. Machado
Luís C. R. Machado
Vertical stirred mills have been widely applied in the minerals industry, due to its greater efficiency in comparison with conventional tumbling mills. In this context, the agitator liner wear plays an important role in maintenance planning and operational costs. In this paper, we use the discrete element method (DEM) wear simulation to evaluate the screw liner wear. Three different mill rotational velocities are evaluated in the simulation, according to different scale-up procedures. The wear profile, wear measurement, power consumption, and particle contact information are used for obtaining a better understanding of the wear behavior and its effects on grinding mechanisms. Data from a vertical stirred mill screw liner wear measurement obtained in a full-scale mill are used to correlate with simulation results. The results indicate a relative agreement with industrial measurement in most of the liner lifecycle, when using a proper mill velocity scale-up.

1 March 2019 in REM - International Engineering Journal
Verified
Journal Article
Open access
PDF file
ARAndré Lubene Ramos
André Lubene Ramos
Douglas MazzinghyDouglas Mazzinghy
Douglas Mazzinghy
VBViviane da Silva Borges Barbosa
Viviane da Silva Borges Barbosa
MOMichel Melo Oliveira
Michel Melo Oliveira
GSGilberto Rodrigues da Silva
Gilberto Rodrigues da Silva
Mining projects are often budgeted in millions of dollars, making it of interest to the investor to measure a project’s uncertainties and risks, which include the changes in the commodity price. The simulation of asset prices is valid because it enables displaying, with a degree of certainty, the future behavior of a financial asset. One of the most commonly used mathematical forecast models is the Geometric Brownian Motion (GBM) model. This article aims at simulating the forecast price of an iron ore commodity with the GBM method based on the historical price series and comparing it to other forecast approaches used in the financial market. The results of this study indicate that the model has limitations, which should be considered. However, it is an overall good tool to support the economic evaluation of a project, if performed along with other approaches.

1 April 2017 in Minerals Engineering
Verified
Journal Article
Closed access
Douglas MazzinghyDouglas Mazzinghy
Douglas Mazzinghy
JLJens Lichter
Jens Lichter
CSClaudio Luiz Schneider
Claudio Luiz Schneider
RGRoberto Galéry
Roberto Galéry
JRJosé Francisco Cabello Russo
José Francisco Cabello Russo

16 March 2022 in International Journal of Mining, Reclamation and Environment
Verified
Journal Article
Closed access
Douglas MazzinghyDouglas Mazzinghy
Douglas Mazzinghy
RFRicardo A.M. Figueiredo
Ricardo A.M. Figueiredo
APAnita SMI Anita Parbhakar-Fox
Anita SMI Anita Parbhakar-Fox
Mohsen YahyaeiMohsen Yahyaei
Mohsen Yahyaei
James VaughanJames Vaughan
James Vaughan
MPMalcolm S. Powell
Malcolm S. Powell
Mining is facing a transformation in terms of environmental and social performance with improved mine waste management practices required. The valorisation of iron ore tailings, a fine material rich in silica, should be sought as it can be used in geopolymers. In this study a methodology to produce a one-part geopolymer using iron ore tailings as fillers is presented. All experiments used 50 wt.% of tailings with varying proportions of activators tested. The best result of compressive strength achieved is 48.1MPa after 28 days curing at room temperature. This study demonstrates the potential application for using geopolymers as future construction materials.

11 November 2022 in Mining
Verified
Journal Article
Open access
PDF file
Rita de Cassia Pedrosa SantosRita de Cassia Pedrosa Santos
Rita de Cassia Pedrosa Santos
JSJosé Margarida da Silva
José Margarida da Silva
WJWalter Albergaria Junior
Walter Albergaria Junior
CPClaudio Lúcio Pinto
Claudio Lúcio Pinto
MOMichel Melo Oliveira
Michel Melo Oliveira
Douglas MazzinghyDouglas Mazzinghy
Douglas Mazzinghy
The important role of ventilation in underground mines is to ensure safety and adequate environmental conditions in all accessible areas of a mine. This research aims to develop low-cost solutions for monitoring ventilation parameters in underground mines using the Internet of Things (IoT). A comparison between standard measuring equipment and a new low-cost wearable monitoring device prototype was performed, and the variables measured in an underground mine were pressure, temperature, and relative humidity. The results in all surveys indicate that the wearable monitoring device prototype can properly be used for continuous monitoring of the underground environment. The standard measurement devices for underground mines should continuously be used by mining companies as requested by local legislation. The low-cost wearable monitoring device developed should be viewed as a redundant measurement device for operators’ safety. The constant innovations in technology can support mining operators in anticipating problems, improving productivity, ensuring safety, and meeting standards at low investments.