Electricity is one of the biggest expenses associated with underground mining and ventilation often accounts for 50% of the total electricity use. Ventilation on demand is not widely used in Brazil, but the Ipueira, Cuiaba, and Corrego do Sitio I mines reported savings of 26%, 30%, and 21%, respectively, following its application. Frequency inverters are used to control the rotation of the main fans during shift changes. The Cuiaba mine has a control room and fans are monitored online using wireless scattered sensors. Data from field studies were compared to other foreign mines. The results showed that the application of this technique, even in an experimental way, can reduce electricity consumption significantly. Despite the energy savings that can be achieved by providing air only when/where it is needed, the costs of automation, software, and infrastructure mean that it is not practical to apply this technique at a more advanced level.
The important role of ventilation in underground mines is to ensure safety and adequate environmental conditions in all accessible areas of a mine. This research aims to develop low-cost solutions for monitoring ventilation parameters in underground mines using the Internet of Things (IoT). A comparison between standard measuring equipment and a new low-cost wearable monitoring device prototype was performed, and the variables measured in an underground mine were pressure, temperature, and relative humidity. The results in all surveys indicate that the wearable monitoring device prototype can properly be used for continuous monitoring of the underground environment. The standard measurement devices for underground mines should continuously be used by mining companies as requested by local legislation. The low-cost wearable monitoring device developed should be viewed as a redundant measurement device for operators’ safety. The constant innovations in technology can support mining operators in anticipating problems, improving productivity, ensuring safety, and meeting standards at low investments.
1 December 2020 in REM - International Engineering Journal
In an underground mine, the ventilation is responsible for 25% to 50% of its electrical energy consumption. In countries such as South Africa, United States and Canada researchers have started to achieve a significant reduction in energy consumption without neglecting aspects of the quantity and quality of air required for the best performance of the system, in compliance with safety standards and worker comfort. In Brazil, on demand this ventilation application began in 2013 at the Ipueira mine (Bahia, controlled by Ferbasa company), and was soon after applied by the Cuiabá, Córrego do Sitio I and Lamego mines; all three mines administered by Anglo Gold Ashanti. Each mine adopted frequency inverters for the main ventilation, whereby the fan rotation is adjusted according to demand and speed drivers. This measure resulted in the saving of thousands of reais, since the flow is proportional to the velocity, the pressure is proportional to the square of the velocity, and the power is proportional to the cubed velocity. Therefore, a reduction of 20% in the flow will save about 50% of the energy required. The Cuiabá mine presents the most modern and automated system in the country. The fans are controlled and monitored through a control room. In addition, sensors scattered in the mine, control the required flow rate. The Lamego mine has a similar but simpler system. This article proposes to discuss the application and improvement of the process of ventilation on demand in Brazilian mines where this system is applied.
27 March 2022 in Research, Society and Development
Shaft sinking is a classic activity in underground mines. In shafts with small cross-section or in mines with low mechanization indices it is common to use hand pneumatic drills and blasting by explosive gelatin in cartridges, employing natural draft or flexible ducts with axial fans for gases and fumes exhaustion, muck removal by hand shoveling into hoistable dumping buckets. System of this type has been studied here, consisting of a rectangular cross-section shaft (3.7 m x 2.0 m), with final depth of 94 m, excavated in order to obtain samples for a pilot-scale mineral processing testwork, before the open pit mine’s industrial startup. The shaft had a concrete collar and its walls were supported by wooden sets spaced 1.5 m and 25 mm thick wooden planks as liners. This shaft has been excavated in schist rocks belonging to the metamorphosed hydrothermal deposit of copper and gold located in Chapada (municipality of Mara Rosa, Brazil). Daily production worksheets covering one month campaign were statistically analyzed, encompassing the entire cycle of mining operations, namely drilling, charging and blasting, fumes exhaustion, mucking, wall and face trimming and scaling, and assemblage of support system. Operation downtimes were also quantified. Statistical analysis of productivity indices allowed the detection of critical points of the operation and the establishment reference for similar mining operations.
31 July 2022 in Advances in Materials Science and Engineering
An optimal dimensioning of the room and pillars of the square or rectangular section is finding adequate transversal section support for the pillar; in that sense, all forces acting on the pillar must be evaluated. The pillar has its ends subjected to normal (σ) and shear stresses (τ). In addition, the pillar can also be subjected to dynamic stresses from the seismic waves generated by rock blasting. Thus, when calculating the dimensions of a mine pillar, the stresses imposed by seismic waves must be considered. The combination of lithostatic and dynamic stresses generated by blasting can affect the pillar, generating regions, or areas that will exhibit the formation of cracks, microcracks, chipping, and other detrimental processes for its stability. In that regard, it is appropriate to assess the dynamic effects of the energy delivered in each wave pulse so that these dynamic quantities can be included in the dimensioning of the pillars. This paper presents the physical and mathematical formulation describing the dimensioning issues of room and pillars and its solution using numerical modeling. The numerical modeling is performed using nonlinear mathematical programming and simulation with FLAC 3D (Fast Lagrangian Analysis of Continua in 3D). In this study, it was proven that the stress generated by the seismic wave represents a dynamic stress of nearly 5.5MPa. 'Dimensioned pillars considering wave stresses allows it to recover an average 1.6% less when it is compared with pillars only under overlying rock mass'.