Seung-hoon Park

Mr. Seung-hoon Park

orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 2021 in Energy Conversion and Management
Verified
Journal Article
Closed access
SPSeung-hoon Park
Seung-hoon Park
YJYong-Sung Jang
Yong-Sung Jang
EKEui-Jong Kim
Eui-Jong Kim


20 September 2020 in Energies
Verified
Journal Article
Open access
PDF file
Sangwoo HaSangwoo Ha
Sangwoo Ha
SPSeung-hoon Park
Seung-hoon Park
JEJae-Yong Eom
Jae-Yong Eom
MOMin-Suk Oh
Min-Suk Oh
GCGa-Young Cho
Ga-Young Cho
EKEui-Jong Kim
Eui-Jong Kim
Installing renewable energy systems for zero-energy buildings has become increasingly common; building integrated photovoltaic (BIPV) systems, which integrate PV modules into the building envelope, are being widely selected as renewable systems. In particular, owing to the rapid growth of information and communication technology, the requirement for appropriate operation and control of energy systems has become an important issue. To meet these requirements, a computational model is essential; however, some unmeasurable parameters can result in inaccurate results. This work proposes a calibration method for unknown parameters of a well-known BIPV model based on in situ test data measured over eight days; this parameter calibration was conducted via an optimization algorithm. The unknown parameters were set such that the results obtained from the BIPV simulation model are similar to the in situ measurement data. Results of the calibrated model indicated a root mean square error (RMSE) of 3.39 °C and 0.26 kW in the BIPV cell temperature and total power production, respectively, whereas the noncalibrated model, which used typical default values for unknown parameters, showed an RMSE of 6.92 °C and 0.44 kW for the same outputs. This calibration performance was quantified using measuring data from the first four days; the error increased slightly when data from the remaining four days were compared for the model tests.

11 August 2019 in Sustainability
Verified
Journal Article
Open access
PDF file
SPSeung-hoon Park
Seung-hoon Park
EKEui-Jong Kim
Eui-Jong Kim
As the sizing of borehole heat exchangers (BHEs) is crucial for ground-source heat pump systems, which are becoming increasingly complex and diverse, novel sizing tools are required that can size both boreholes and connected systems. Thus, an optimization-based sizing method that runs in TRNSYS with other component models is proposed. With a focus on the feasibility of the method for typical BHEs, the sizing of irregularly placed boreholes using the well-known duct-storage (DST) model that inherently cannot describe irregular borefields is examined. Recently developed modification methods are used for the DST model. The proposed sizing method is compared with the existing ground loop heat exchanger (GLHE) sizing program. The results indicate that the proposed method has a genuine difference of approximately 3% compared with the GLHE, and the difference increases with the thermal-interference effects. A regression-based method selected to modify the DST model for describing irregular borefields exhibits acceptable sizing results (approximately 5% for test cases) despite the genuine difference. This study is the first to use the DST model for sizing BHEs under irregular borefield configurations, and the tests indicated acceptable results with an approximate difference of one borehole among a total of 30 boreholes in the test cases.

19 October 2017 in Sustainability
Verified
Journal Article
Open access
PDF file
SPSeung-hoon Park
Seung-hoon Park
JKJung-Yeol Kim
Jung-Yeol Kim
YJYong-Sung Jang
Yong-Sung Jang
EKEui-Jong Kim
Eui-Jong Kim
Ground-source heat pump (GSHP) systems coupled with borehole heat exchangers (BHEs) are widely used as a renewable energy source. However, the high initial costs to install the BHEs still acts as an obstacle in the expansion of these renewable energy source systems. Specifically, in South Korea, a typical residential type corresponds to an apartment building with a high building-to-land ratio for land efficiency, and thus the space to install the BHEs is usually insufficient. Furthermore, the high initial cost issue of BHEs makes it difficult to ensure the feasibility of GSHP projects in this type of a situation. This study proposes a novel BHE sizing method to support the process of sizing energy sources in the design development phase of a construction project. Life cycle cost (LCC) analysis was combined with a tool to optimize BHE sizing by considering various economic aspects. Entering water temperatures (EWT) to heat pumps in conjunction with the LCC were used to define objective functions. Consequently, Pareto optimal solutions were obtained on the EWT–LCC plot. A group of Pareto optimal solutions forms a Pareto-curve, and each point on the curve indicates a possible sizing scenario or alternative. Finally, it is possible for decision makers to compare the solutions that include both technical and economic information. The Pareto optimal solutions are expected to support proper decision making in the early design phase.

4 February 2021 in Energies
Verified
Journal Article
Open access
PDF file
SLSeung-Min Lee
Seung-Min Lee
SPSeung-hoon Park
Seung-hoon Park
YJYong-Sung Jang
Yong-Sung Jang
EKEui-Jong Kim
Eui-Jong Kim
This study proposes a simple ground heat exchanger design capacity that is applicable in the schematic-design stage for several configurations used for borehole heat exchangers (BHEs). Three configurations—single, compact, and irregular types—were selected, and the heat transfer rate per unit BHE was calculated considering heat interference. In a case study with a typical configuration and general range of ground thermal conductivity, the BHE heat transfer rate of the compact configuration decreased owing to heat interference as the number of BHEs increased. However, with respect to the irregular configuration, the heat transfer rate increased as the same number increased. This was attributed to the relatively large increment rate of the distance between the boreholes in the irregular configurations, making the heat recovery factor more dominant than the heat interference. The results show that the average heat transfer rate values per BHE applicable to each configuration type in the schematic-design stage were 12.1 kW for the single configuration, 5.8 kW for the compact type, and 10.3 kW for the irregular configuration. However, owing to the large range of results for each case study, the error needs to be reduced by maximally utilizing the information available at the schematic-design stage.