Jung-Yeol Kim

Dr. Jung-Yeol Kim

orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 October 2017 in Sustainability
Verified
Journal Article
Open access
PDF file
SPSeung-hoon Park
Seung-hoon Park
JKJung-Yeol Kim
Jung-Yeol Kim
YJYong-Sung Jang
Yong-Sung Jang
EKEui-Jong Kim
Eui-Jong Kim
Ground-source heat pump (GSHP) systems coupled with borehole heat exchangers (BHEs) are widely used as a renewable energy source. However, the high initial costs to install the BHEs still acts as an obstacle in the expansion of these renewable energy source systems. Specifically, in South Korea, a typical residential type corresponds to an apartment building with a high building-to-land ratio for land efficiency, and thus the space to install the BHEs is usually insufficient. Furthermore, the high initial cost issue of BHEs makes it difficult to ensure the feasibility of GSHP projects in this type of a situation. This study proposes a novel BHE sizing method to support the process of sizing energy sources in the design development phase of a construction project. Life cycle cost (LCC) analysis was combined with a tool to optimize BHE sizing by considering various economic aspects. Entering water temperatures (EWT) to heat pumps in conjunction with the LCC were used to define objective functions. Consequently, Pareto optimal solutions were obtained on the EWT–LCC plot. A group of Pareto optimal solutions forms a Pareto-curve, and each point on the curve indicates a possible sizing scenario or alternative. Finally, it is possible for decision makers to compare the solutions that include both technical and economic information. The Pareto optimal solutions are expected to support proper decision making in the early design phase.

25 August 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
BSBae Sung-Jae
Bae Sung-Jae
JKJung-Yeol Kim
Jung-Yeol Kim
Point cloud data are used to create an as-built building information model (as-built BIM) that reflects the actual status of any building, whether being constructed or already completed. However, indoor clutter objects in the point cloud data, such as people, tools, and materials, should be effectively eliminated to create the as-built BIM. In this study, the authors proposed a novel method to automatically remove indoor clutter objects based on the Manhattan World assumption and object characteristics. Our method adopts a two-dimensional (2D) projection of a 3D point cloud approach and utilizes different properties of indoor clutter objects and structural elements in the point cloud. Voxel-grid downsampling, density-based spatial clustering (DBSCAN), the statistical outlier removal (SOR) filter, and the unsupervised radius-based nearest neighbor search algorithm were applied to our method. Based on the evaluation of our proposed method using six actual scan datasets, we found that our method achieved a higher mean accuracy (0.94), precision (0.97), recall (0.90), and F1 core (0.93) than the commercial point cloud processing software. Our method shows better results than commercial point cloud processing software in classifying and removing indoor clutter objects in complex indoor environments acquired from construction sites. As a result, assumptions about the different properties of indoor clutter objects and structural elements are being used to identify indoor clutter objects. Additionally, it is confirmed that the parameters used in the proposed method could be determined by the voxel size once it is decided during the downsampling process.

2 November 2019 in Journal of Asian Architecture and Building Engineering
Verified
Journal Article
Open access
DYDong-Jun Yeom
Dong-Jun Yeom
YPYesul Park
Yesul Park
YKYoung Suk Kim
Young Suk Kim
JKJung-Yeol Kim
Jung-Yeol Kim
PHC pile head cutting is an essential operation in foundation works, as it is needed to level the pile foundations. However, as it involves workers manually cutting the PHC pile with a grinder, the PHC pile head cutting process has several challenges with regard to safety, convenience, productivity, and quality. To address such problems, in this study, we define the core element technologies and automated work processes of an all-in-one attachment-based PHC pile head cutting robot that allow a series of operations to be performed in sequence – recognizing a cut-off line on PHC piles; cutting them; and separating, lifting, transporting, and unloading the severed top parts of the piles – without the need to involve workers onsite. Additionally, a prototype of the robot is developed and subjected to performance evaluation and productivity analysis. The results of the performance evaluation and productivity analysis of the conventional and automated methods performed using Web-CYCLONE simulations indicate that the automated method can improve the productivity by 3.13% compared with the conventional method. It is anticipated that when deployed onsite, the proposed robot can not only increase the productivity but also improve the convenience and quality of work at the PHC pile head cutting job site.

20 July 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
SBSung-Jae Bae
Sung-Jae Bae
JPJunbeom Park
Junbeom Park
JHJoonhee Ham
Joonhee Ham
MSMinji Song
Minji Song
JKJung-Yeol Kim
Jung-Yeol Kim
Point clouds acquired by mobile laser scanners (MLS) are widely used for generating as-built building information models (BIM), particularly in indoor construction environments and existing buildings. While MLS offers fast and efficient scanning through SLAM technology, its accuracy and precision remains lower than that of terrestrial laser scanners (TLS). This study investigates the potential to improve MLS-based as-built BIM accuracy by analyzing and utilizing error distribution patterns inherent in MLS point clouds. Based on the assumption that each MLS device exhibits consistent and unique error distribution patterns, an experiment was conducted using three MLS devices and TLS-derived reference data. The analysis employed iterative closest point (ICP) registration and cloud-to-mesh (C2M) distance measurements on mock-ups with closed shapes. The results revealed that error patterns were stable across scans and could be leveraged as correction factors. In other words, the results indicate that when using MLS for as-built BIM generation, robust fitting methods have limitations in obtaining realistic object dimensions, as they do not account for the unique error patterns present in MLS point clouds. The proposed method provides a simple and repeatable approach for enhancing MLS accuracy, contributing to improved dimensional reliability in MLS-driven BIM applications.