21 December 2011 in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
Verified
Journal Article
Open access
AJAiyin Jiang
Aiyin Jiang
RIRaja R. A. Issa
Raja R. A. Issa
MMMaged Malek
Maged Malek
Cash flow is crucial for ensuring the viability of a project. It consists of a complete history of all cash disbursement, cash shortage, loans, cost of money, and all earnings received. Although significant research work has been conducted on cash flow forecast, planning, and management, the objective is constantly the maximization of profit/final cash balance, or minimization of total project cost. Moreover, cash flow forecasting needs to be effective and fast. The paper develops multiple-objective cash flow planning model – Pareto optimality efficiency network model, which considers typical banking instruments, the constraints of the financial market, the budget constraints, and retention of money. A case study illustrates the multi-objective project cash flow management approach by applying the proposed model to a real world problem. A what-if-analysis depicts the tradeoff between profitability and loan interests, which are major issues in project cash flow planning and management. The model presents an effective decision making tool to be used by industry practitioners with reasonable accuracy. Santrauka Projekto gyvybingumui pinigų srautai turi kritinę reikšmę. Pinigų srautus sudaro piniginės viso projekto išlaidos, pinigų trūkumas, paskolos, pinigų kaina ir visos gautos pajamos. Nors atlikta daug pinigų srautų prognozių, planavimo ir valdymo tyrimų, jų objektas paprastai yra pelno (galutinio pinigų likučio) maksimizavimas arba bendros projekto kainos minimizavimas. Be to, pinigų srautų prognozavimas turi būti veiksmingas ir greitas. Darbe kuriamas daugiatikslis pinigų srautų planavimo modelis – Pareto optimumo efektyvumo tinklo modelis, kuris apima įprastas bankų veiklos priemones, finansų rinkos suvaržymus, biudžeto suvaržymus ir pinigų išsaugojimą. Tiriant atvejį pristatomas daugiatikslis projekto pinigų srautų valdymo metodas, t. y. taikant siūulomą modelį sprendžiamas praktinis uždavinys. Galimų variantų analizė (angl. What-if-analysis) rodo, kaip suderinti pelningumą ir paskolos palūkanas, t. y. pagrindines problemas planuojant ir valdant projekto pinigų srautus. Modelis yra gana tiksli ir efektyvi sprendimų priėmimo priemonė, skirta sektoriaus praktikams.

14 February 2017 in International Journal of Construction Education and Research
Verified
Journal Article
Closed access
AJAiyin Jiang
Aiyin Jiang
YZYimin Zhu
Yimin Zhu
AEAdel Elsafty
Adel Elsafty
MTMark Tumeo
Mark Tumeo
Many studies have investigated the impact of global warming on energy consumption. In this study, the morphing method and EnergyPlus (E+) software were used to investigate the impact of climate change on commercial building energy use under the A2 medium-CO2. emission scenario. The study simulated electricity and gas consumption of nine types of commercial buildings in eight cities, representing three climate zones in Florida. The nine types of commercial buildings included apartments, hotels, offices, and schools. The energy simulation results showed the future trends of growth and reduction in electricity and gas consumption for cooling and heating in TMY2 (TMY3), 2020, 2050, and 2080 in the eight selected cities. In general, gas and electricity demands for heating are projected to decrease, and electricity demand for cooling increases, at different rates in various areas of Florida. The study provides guidance for policy‐makers and utility companies as they craft their response to climate change in various regions of Florida.

1 January 2010 in International Journal of Construction Management
Verified
Journal Article
Closed access
AJAiyin Jiang
Aiyin Jiang
YZYimin Zhu
Yimin Zhu
Time-cost trade-offs are a critical construction planning issue, which have received significant amount of research. Many existing solutions are based on evolutionary algorithms, which are search-based and ignore the structure of time-cost trade-off problems. Mathematical programming methods were applied previously but their computational limitations have been widely recognized. This study proposed a multi-stage approach based on linear programming and integer programming to improve the efficiency of time-cost trade-off analysis using mathematical programming. Three models are used in this approach- a normal duration model, a reduction time model, and an adjustment model. The normal duration model finds the normal project duration. The reduction time model seeks optimum solutions to minimize the total cost subject to a project deadline by assuming all crash-able activities are linear-continuous (LC). The adjustment model finds feasible solution for non-linear-continuous (NLC) activities whose reduction time given by the reduction model is not reasonable. It is a pure binary programming model. Using this approach, the reduction time model narrows down the number of NLC activities that need reduction time adjustment. This step improves the adjustment model computational efficiency. A case study issued to demonstrate the application and the potential of this approach.

2 August 2022 in Journal of Information Technology in Construction
Verified
Journal Article
Open access
PDF file
AJAiyin Jiang
Aiyin Jiang
YMYunjeong Mo
Yunjeong Mo
VKVamsi Kalasapudi
Vamsi Kalasapudi
Fire emergency evacuation study has been conducted for decades. In recent two decades, the fire emergency evacuation studies have been incorporating new technologies due to the high demands on efficient and safe evacuation for occupants who have various needs. The proposed fire emergency evacuation system from academic research and solutions from industry practices adopt different technologies to serve various evacuees. Therefore, this study conducts literature review to understand the status quo of current fire emergency evacuation research and practice. It shows that fire emergency evacuation studies mainly focus on the facility operation stage instead of design and construction stages. The facilities include residential buildings, education buildings, subways, shopping centers, etc. Three critical factors affect efficient and safe fire emergency evacuation in a built environment – facility physical features, fire characteristics, and human behavior. This study categories these new technologies, which are incorporated into the fire emergency evacuation research and practices within the recent two decades, into four groups: (1) Facility geometrical analysis, which includes the technologies such as BIM, GIS, VR and the combination of BIM/GIS/VR (2) Fire and smoke simulation, e.g. FDS and Pyrosim. The simulation output such as fire and smoke dynamics is incorporated into intelligent fire evacuation system (3) Crowd evacuation simulation software, e.g. Pathfinder, Massmotion; the output of simulation is used to develop personalized evacuation system (4) Indoor positioning system and mobile device/IoT technology to track and evacuate occupants intelligently. This study presents these new technologies used in the fire emergency evacuation systems and indicates that the development of an intelligent and personalized emergency evacuation system, which may track the evacuees in real time, is the future research trend.

1 January 2012 in International Journal of Construction Management
Verified
Journal Article
Closed access
AJAiyin Jiang
Aiyin Jiang
Under-capitalization, difficulties in getting credit, substantial cost of getting financed, etc. cause contractors to complete projects with negative ending balances. Predictability and control of the cash flow through negotiating financial provisions of construction contracts mean differences between success and failure of a project or a contracting company. Despite many practical insights provided by professionals, structured procedures and tools are seldom used, and few contractors take advantage of the existing techniques which can enable them to identify the effects of their decisions on negotiating contract terms. In addition, commercial finance software is expensive and complicated. This paper presents the multi-period dynamic model on the project level which maximizes final cash balance through negotiating financial terms of contracts without time-consuming data collection and with reasonable accuracy. This allows industrial practitioners to define the cash flow planning horizon, as well as predict and maximize the final cash balance. Microsoft’s Excel spreadsheet software with its add-in optimization programs is used in solving these models. Through scenarios and sensitivity analysis on contract financial provisions, contractors can predict the impact on project cash inflows and outflows. The approximate solution of this deterministic model gives decision makers an excellent insight for making the optimal decisions.

1 January 2011 in Journal of Management in Engineering
Verified
Journal Article
Closed access
AJAiyin Jiang
Aiyin Jiang
MMMaged Malek
Maged Malek
SBSara Boudali
Sara Boudali
Construction engineering companies usually provide a variety of services. To be competitive, companies have to organize their operations strategically based on market demands within the limitations of their own resources. Optimization of these resources is of vital importance for these companies. Historically, decisions on resource allocations to various construction market segments were made exclusively based on intuitive judgment. In previous literature, the proposed models on capital allocation place emphasis on formulating cash-flow forecasting and planning strategy on project level. However, existing technologies and established mathematical methods provide a sound base for quantitative analysis on company-level business strategy and capital allocation. This note proposes a linear programming model that can be conveniently applied by construction practitioners. The model incorporates the project cost structure and considers the business constraints such as bonding capacity and borrowing capital capacity. Its objective is to achieve maximum profit through improving project management efficiency and setting appropriate sales goals in various market segments based on market demands. It is a decision-making tool that provides “what-if” analysis. The solutions and alternatives of the model give the decision makers an excellent insight for making the best choice.