Yimin Zhu

Yimin Zhu

Auto-generated profile, based on publicly available information

Yimin Zhu

Assistant Professor, Dept. of Construction Management, College of Engineering and Computing, Florida International Univ., Miami, FL 33174

Research Focus & Metrics

Academic Career Length

22Years (2005-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2012 in Journal of Management in Engineering
Verified
Journal Article
Closed access
GDGulbin Ozcan Deniz
Gulbin Ozcan Deniz
YZYimin Zhu
Yimin Zhu
VCVictor Ceron
Victor Ceron
Environmentally conscious construction has become a subject of research during the last decades. Even though construction literature involves plenty of studies that emphasize the importance of environmental impact during the construction phase, most of the previous studies failed to combine environmental analysis with other project performance criteria in construction. To achieve environmentally conscious construction and successfully manage a complex construction environment, multiple project objectives and their relationships need to be considered. In this study, the authors propose a framework on the basis of the concept of control accounts to determine optimal construction operations when project time, cost, and environment impact (TCEI) are considered as project objectives during project planning. The framework also supports decision-making by using sensitivity analysis. Life cycle assessment is applied to the evaluation of environmental impact in terms of global warming potential (GWP). The ...

1 July 2009 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
YZYimin Zhu
Yimin Zhu
IAIrtishad Ahmad
Irtishad Ahmad
LWLi Wang
Li Wang
Highway construction often causes an additional road user cost (RUC) to motorists due to traffic flow interruption and congestion in work zones. Consequently, facility owners, such as the Florida Department of Transportation (FDOT), are often interested in using alternative contracting methods such as A+B contracting to expedite construction. Although many of these contracting methods rely on the RUC to determine incentives or disincentives, no standard method for RUC calculation is available to FDOT district engineers. In addition, existing methods are neither practical nor user-friendly for determining incentives or disincentives. This study intends to develop a RUC calculation procedure for the FDOT that focuses on using data that are easily accessible to FDOT district engineers, such as drawings and maintenance of traffic plans. The procedure is developed based on traffic analysis methods published in the Highway Capacity Manual, previous studies on user benefit analysis and work zones, and empirical ...

1 January 2010 in International Journal of Construction Management
Verified
Journal Article
Closed access
AJAiyin Jiang
Aiyin Jiang
YZYimin Zhu
Yimin Zhu
Time-cost trade-offs are a critical construction planning issue, which have received significant amount of research. Many existing solutions are based on evolutionary algorithms, which are search-based and ignore the structure of time-cost trade-off problems. Mathematical programming methods were applied previously but their computational limitations have been widely recognized. This study proposed a multi-stage approach based on linear programming and integer programming to improve the efficiency of time-cost trade-off analysis using mathematical programming. Three models are used in this approach- a normal duration model, a reduction time model, and an adjustment model. The normal duration model finds the normal project duration. The reduction time model seeks optimum solutions to minimize the total cost subject to a project deadline by assuming all crash-able activities are linear-continuous (LC). The adjustment model finds feasible solution for non-linear-continuous (NLC) activities whose reduction time given by the reduction model is not reasonable. It is a pure binary programming model. Using this approach, the reduction time model narrows down the number of NLC activities that need reduction time adjustment. This step improves the adjustment model computational efficiency. A case study issued to demonstrate the application and the potential of this approach.

7 October 2013
Verified
Conference Paper
Closed access
PIPeeraya Inyim
Peeraya Inyim
YZYimin Zhu
Yimin Zhu
The building and construction industry has been steadily adopting the concept of sustainable design. Consequently, the design phase of a building project has become a critical stage in determining how sustainability goals of a project will be accomplished. Life cycle assessment (LCA) is a quantitative method to determine environmental impacts of materials, products, processes or buildings. However, it is often a challenge to quantify use phase building energy consumption in life cycle assessment due to the dynamic nature of this phase. Energy consumption is an important factor in the life cycle of a building project. Much research acknowledges that buildings are responsible for a significant amount of energy consumption in the USA and in countries around the world. There is currently an increasing demand from both public and private sectors to deliver buildings that are energy efficient. A feasible set of tools in dealing with the energy efficiency analysis during design are energy simulation programs, which allow the evaluation of energy performance of different building designs and the selection of the most appropriate alternatives. This research is focused on developing a framework for integrated analysis of building designs using life cycle assessment and energy simulation by extending the existing SimulEICon. Such a framework allows tracking design parameters (such as energy consumption and costs) during the entire design phase of a project. Construction and building life cycle-related data are stored in an alternatives database which includes the probability distributions of individual parameters and the possible combinations among such parameters. Monte Carlo simulation is used to address data uncertainty and availability. The energy simulation software, Energy Plus is used in order to calculate use phase energy consumption. Genetic algorithm optimization is applied to address the issue of selecting optimal solutions from a large number of possible design alternatives during the decision-making process at the design phase. A case study is presented to demonstrate the feasibility and potential of the framework.

11 July 2005 in Automation in Construction
Verified
Journal Article
Closed access
YZYimin Zhu
Yimin Zhu
GAGodfried Augenbroe
Godfried Augenbroe

17 May 2012
Verified
Conference Paper
Closed access
WOWallied Orabi
Wallied Orabi
YZYimin Zhu
Yimin Zhu
GDGulbin Ozcan Deniz
Gulbin Ozcan Deniz
The construction industry has a significant environmental footprint, especially in terms of greenhouse gas emissions and energy consumption. Substantial amounts of greenhouse gasses and non-greenhouse gasses that have an indirect radiative effect are emitted from construction activities and processes and during production, installation, maintenance, and end-of-life disposal of construction materials. These emissions can be controlled and minimized by optimizing the utilization of construction resources. This includes the optimal utilization of the available construction crews and materials in such a way that reduces greenhouse gas emissions while minimizing construction cost and duration. Therefore, this paper presents the development of a building construction planning model that is capable of minimizing greenhouse gas emissions, construction cost, and construction duration, simultaneously. The model is implemented in three main steps: (1) analyzing the impact of construction activities and processes on global warming potential (GWP); (2) evaluating the impact of these activities and processes on construction cost and duration; and (3) optimizing the utilization of construction resources in order to facilitate the selection and implementation of the construction methods that reduces the GWP while keeping construction cost and duration to a minimum. An application example is analyzed to illustrate the use of the developed model and examine the relationships between all three planning objectives. The analysis of the application example demonstrated the capabilities of the developed model in controlling the global warming impacts from construction activities and processes. Furthermore, the examination of the relationships between GWP and construction duration and cost can help designers and construction professionals in making environmentally-conscious yet cost-effective decisions during building design and construction phases.