Terapong Boonraksa

Prof. Dr. Terapong Boonraksa

School of Electrical Engineering, Rajamangala University of Technology Rattanakosin.
orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
3 January 2023 in Electronics
Verified
Journal Article
Open access
PDF file
SWSane Lei Lei Wynn
Sane Lei Lei Wynn
Terapong BoonraksaTerapong Boonraksa
Terapong Boonraksa
PBPromphak Boonraksa
Promphak Boonraksa
Watcharakorn PinthuratWatcharakorn Pinthurat
Watcharakorn Pinthurat
Boonruang MarungsriBoonruang Marungsri
Boonruang Marungsri
Smart energy management and control systems can improve the efficient use of electricity and maintain the balance between supply and demand. This paper proposes the modeling of a decentralized energy management system (EMS) to reduce system operation costs under renewable generation and load uncertainties. There are three stages of the proposed strategy. First, this paper applies an autoregressive moving average (ARMA) model for forecasting PV and wind generations as well as power demand. Second, an optimal generation scheduling process is designed to minimize system operating costs. The well-known algorithm of particle swarm optimization (PSO) is applied to provide optimal generation scheduling among PV and WT generation systems, fuel-based generation units, and the required power from the main grid. Third, a demand response (DR) program is introduced to shift flexible load in the microgrid system to achieve an active management system. Simulation results demonstrate the performance of the proposed method using forecast data for hourly PV and WT generations and a load profile. The simulation results show that the optimal generation scheduling can minimize the operating cost under the worst-case uncertainty. The load-shifting demand response reduced peak load by 4.3% and filled the valley load by 5% in the microgrid system. The proposed optimal scheduling system provides the minimum total operation cost with a load-shifting demand response framework.

27 June 2023 in IEEE Access
Verified
Journal Article
Open access
Terapong BoonraksaTerapong Boonraksa
Terapong Boonraksa
Watcharakorn PinthuratWatcharakorn Pinthurat
Watcharakorn Pinthurat
PWPinit Wongdet
Pinit Wongdet
PBPromphak Boonraksa
Promphak Boonraksa
Boonruang MarungsriBoonruang Marungsri
Boonruang Marungsri
Branislav HredzakBranislav Hredzak
Branislav Hredzak
DC microgrid systems have been increasingly employed in recent years since there is a need to reduce the use of fossil fuels for electricity generation. Distributed generations (DGs), which are mostly DC sources in nature, play an important role in effective microgrid energy management systems. A key component in a microgrid system that can enhance stability and reliability is the employment of energy storage systems (ESSs). Nonetheless, ESSs currently lack cost-effectiveness. Each technology of the ESSs has been used for a particular purpose. Therefore, hybridization of different technologies can improve microgrid stability and reliability, as well as extend the ESS’s lifetime. This paper proposes to optimize the capacity and cost of a hybrid ESS between a battery and a supercapacitor in a standalone DC microgrid by calculating the cut-off frequency of a low-pass filter (LPF). The high fluctuation component of renewable power generation and load demand is supplied by the supercapacitor, while the low fluctuation component of renewable power generation and load demand is provided by the battery. A meta-heuristic strategy known as the Whale optimization algorithm (WOA) is applied to minimize the designed objective function, considering the total net present value (NPV) and replacement cost of the hybrid ESS, using the MATLAB environment. Real PV power, wind turbine power, and load demand are utilized for the analysis. The obtained results show that the reduction of power fluctuation for the battery in the DC microgrid can reduce the cost of the hybrid ESS. The microgrid system with only a battery has an NPVtotal of $6,153,059, whereas the hybrid ESS has an NPVtotal of $5,413,846. Thus, the hybrid ESS can reduce the total cost of the entire project by 12.01% compared to the system having only a battery. Consequently, the total system life-cycle cost of the hybrid ESS is lower than that of the battery-only system.

22 February 2023 in Energies
Verified
Journal Article
Open access
PDF file
NKNonthawat Khortsriwong
Nonthawat Khortsriwong
PBPromphak Boonraksa
Promphak Boonraksa
Terapong BoonraksaTerapong Boonraksa
Terapong Boonraksa
TFThipwan Fangsuwannarak
Thipwan Fangsuwannarak
ABAsada Boonsrirat
Asada Boonsrirat
Boonruang MarungsriBoonruang Marungsri
Boonruang Marungsri
Recently, deep learning techniques have become popular and are widely employed in several research areas, such as optimization, pattern recognition, object identification, and forecasting, due to the advanced development of computer programming technologies. A significant number of renewable energy sources (RESs) as environmentally friendly sources, especially solar photovoltaic (PV) sources, have been integrated into modern power systems. However, the PV source is highly fluctuating and difficult to predict accurately for short-term PV output power generation, leading to ineffective system planning and affecting energy security. Compared to conventional predictive approaches, such as linear regression, predictive-based deep learning methods are promising in predicting short-term PV power generation with high accuracy. This paper investigates the performance of several well-known deep learning techniques to forecast short-term PV power generation in the real-site floating PV power plant of 1.5 MWp capacity at Suranaree University of Technology Hospital, Thailand. The considered deep learning techniques include single models (RNN, CNN, LSTM, GRU, BiLSTM, and BiGRU) and hybrid models (CNN-LSTM, CNN-BiLSTM, CNN-GRU, and CNN-BiGRU). Five-minute resolution data from the real floating PV power plant is used to train and test the deep learning models. Accuracy indices of MAE, MAPE, and RMSE are applied to quantify errors between actual and forecasted values obtained from the different deep learning techniques. The obtained results show that, with the same training dataset, the performance of the deep learning models differs when testing under different weather conditions and time horizons. The CNN-BiGRU model offers the best performance for one-day PV forecasting, while the BiLSTM model is the most preferable for one-week PV forecasting.

23 January 2023 in Batteries
Verified
Journal Article
Open access
PDF file
PWPinit Wongdet
Pinit Wongdet
Terapong BoonraksaTerapong Boonraksa
Terapong Boonraksa
Promphak DawanPromphak Dawan
Promphak Dawan
Watcharakorn PinthuratWatcharakorn Pinthurat
Watcharakorn Pinthurat
Boonruang MarungsriBoonruang Marungsri
Boonruang Marungsri
Branislav HredzakBranislav Hredzak
Branislav Hredzak
In standalone microgrids, the Battery Energy Storage System (BESS) is a popular energy storage technology. Because of renewable energy generation sources such as PV and Wind Turbine (WT), the output power of a microgrid varies greatly, which can reduce the BESS lifetime. Because the BESS has a limited lifespan and is the most expensive component in a microgrid, frequent replacement significantly increases a project’s operating costs. This paper proposes a capacity optimization method as well as a cost analysis that takes the BESS lifetime into account. The weighted Wh throughput method is used in this paper to estimate the BESS lifetime. Furthermore, the well-known Particle Swarm Optimization (PSO) algorithm is employed to maximize battery capacity while minimizing the total net present value. According to simulation results, the optimal adjusting factor of 1.761 yields the lowest total net present value of US$200,653. The optimal capacity of the BESS can significantly reduce the net present value of total operation costs throughout the project by extending its lifetime. When applied to larger power systems, the proposed strategy can further reduce total costs.

10 January 2020 in Energies
Verified
Journal Article
Open access
PDF file
PBPromphak Boonraksa
Promphak Boonraksa
KSKobsak Sriprapha
Kobsak Sriprapha
SKSongkiate Kittisontirak
Songkiate Kittisontirak
Terapong BoonraksaTerapong Boonraksa
Terapong Boonraksa
Nitikorn JunhuathonNitikorn Junhuathon
Nitikorn Junhuathon
SNSurasak Niemcharoen
Surasak Niemcharoen
The power output forecasting of the photovoltaic (PV) system is essential before deciding to install a photovoltaic system in Nakhon Ratchasima, Thailand, due to the uneven power production and unstable data. This research simulates the power output forecasting of PV systems by using adaptive neuro-fuzzy inference systems (ANFIS), comparing accuracy with particle swarm optimization combined with artificial neural network methods (PSO-ANN). The simulation results show that the forecasting with the ANFIS method is more accurate than the PSO-ANN method. The performance of the ANFIS and PSO-ANN models were verified with mean square error (MSE), root mean square error (RMSE), mean absolute error (MAP) and mean absolute percent error (MAPE). The accuracy of the ANFIS model is 99.8532%, and the PSO-ANN method is 98.9157%. The power output forecast results of the model were evaluated and show that the proposed ANFIS forecasting method is more beneficial compared to the existing method for the computation of power output and investment decision making. Therefore, the analysis of the production of power output from PV systems is essential to be used for the most benefit and analysis of the investment cost.

5 March 2024 in IEEE Access
Verified
Journal Article
Open access
Terapong BoonraksaTerapong Boonraksa
Terapong Boonraksa
PBPromphak Boonraksa
Promphak Boonraksa
Watcharakorn PinthuratWatcharakorn Pinthurat
Watcharakorn Pinthurat
Boonruang MarungsriBoonruang Marungsri
Boonruang Marungsri
Across the globe, the adoption of electric vehicles (EVs), particularly in mass transit systems such as electric buses (E-bus), is on the rise in modern cities. This surge is attributed to their environmentally friendly nature, zero carbon emissions, and absence of engine noise. However, the charging of E-bus batteries could impact the peak demand on the main grid and its overall serviceability, especially when numerous batteries are charged simultaneously. This scenario may also lead to increased energy costs. To address the previously mentioned issue, battery swapping is employed at the charging station in lieu of conventional battery charging. In this paper, the battery swapping approach is utilized to establish the optimal battery charging schedule for E-buses, taking into account both energy costs and the peak-to-average ratio (PAR). The E-bus battery swapping stations incorporate photovoltaic (PV) power generation as their energy source. Three metaheuristic algorithms—namely, the binary bat algorithm (BBA), whale optimization algorithm (WOA), and grey wolf optimizer (GWO)—are employed to identify the optimal conditions. The simulation results demonstrate that integrating the optimal battery charging schedule with a PV power generation system in an E-bus battery swapping station can effectively lower energy costs and the PAR when compared to traditional battery charging methods at charging stations. The optimal charging schedule derived through the GWO technique outperforms those obtained from the WOA and BBA techniques. This resulted in a notable reduction in peak demand from 758.41 to 580.73 kW, corresponding to a 23.43% decrease in peak demand. The integration of the GWO with battery charging scheduling and PV installation resulted in a significant 27.63% reduction in energy costs. As per the simulation results, an optimized battery swapping schedule has the potential to lower energy costs and enhance serviceability for the E-bus battery swapping station.