Tensegrity structures are composed of cables and struts in a prestressed self-equilibrium. Although tensegrity first appeared in the 1950s, it is seldom used in civil engineering. This paper focuses on the design aspects of a deployable tensegrity-hollow-rope footbridge. Deployment is usually not a critical design case for traditional deployable structures. However, for tensegrity systems deployment may be critical due to the actuation required. In this paper, deployment is investigated in a general design framework. The influence of clustered (continuous) cables and spring elements in statics and dynamics is studied. Finally, actuation schemes are explored to identify cases where deployment becomes a critical design case. For this configuration, deployment is a critical design case when the structure has spring elements and continuous cables.
Tensegrity structures are spatial systems composed of tension and compression components in a self-equilibrated prestress stable state. Although the concept is over 60 years old, few tensegrity-based structures have been used for engineering purposes. Tensegrity-ring modules are deployable modules composed of a single strut circuit that, when combined, create a hollow rope. The “hollow-rope” concept was shown to be a viable system for a tensegrity footbridge. This paper focuses on the deployment of pentagonal ring modules for a deployable footbridge application. The deployment sequence of a module is controlled by adjusting cable lengths (cable actuation). The geometric study of the deployment for a single module identified the path space allowing deployment without strut contact. Additionally, a deployment path that reduces the number of actuated cables was found. The number of actuated cables is further reduced by employing continuous cables. A first-generation prototype was used to verify both ...