This paper proposes the utilization of water storage ability to improve wind park operational economic gains and to attenuate the active power output variations due to the intermittence of the wind-energy resource. An hourly-discretized optimization algorithm is proposed to identify the optimum daily operational strategy to be followed by the wind turbines and the hydro generation pumping equipments, provided that a wind-power forecasting is available. The stochastic characteristics of the wind power are exploited in the approach developed in order to identify an envelope of recommended operational conditions. Three operational conditions were analyzed and the obtained results are presented and discussed.
This paper proposes an optimized dispatch control strategy for active and reactive powers delivered by a doubly fed induction generator in a wind park. In this control approach, wind turbines are supposed to operate over a deloaded maximum power extraction curve and will respond to a supervisory wind farm control after a request from a system operator for adjusting the outputs of the wind park. The definition of the active and reactive powers operating points, for each wind turbine, is defined from an optimization algorithm that uses the primal-dual predictor corrector interior point method. The control strategy used at the wind generator level exploits a combination of pitch control and control of the static converters to adjust the rotor speed for the required operation points. A small wind park is used to illustrate the effectiveness of the developed approach.
1 December 2004 in International Journal of Electrical Power & Energy Systems
This paper aims to calculate the optimal operation of offshore wind farms (OWF) working with wind turbines based on doubly fed induction generator (DFIG) technologies, and with a high-voltage dc transmission connection. The objective of the optimization problem is to maximize the active power output of the arrangement, while considering certain factors, i.e., the restrictions imposed by the available wind power, the capability curve of the DFIG, the dc-link model, and the operative conditions. The accomplishment of this aim implies setting, adjusting, and operating the system under study in order to produce a reliable and cost-efficient electric energy supply. A realistic simulation test case is performed to evaluate the proposed method, and the optimal operation analysis takes into account different wind speeds and high-voltage dc-link lengths. The results show the effectiveness of the proposed method, demonstrating the advantages of using the reactive control performed by the DFIG to manage the operational requirements of the dc link.