In this study, several estimation methods of fatigue properties based on different monotonic mechanical parameters were first discussed. The advantages and disadvantages of the Hardness Method proposed by Roessle and Fatemi were investigated and improved through the analysis of a total of 92 fatigue test data. A new Segment Fitting Method from Brinell hardness was then proposed for the fatigue properties estimation, and a total of 96 pieces of fatigue test data under axial, torsional, and multiaxial in‐phase loading were collected to verify the applicability of the new proposal. Finally, the prediction accuracy of the new proposal and three exciting estimation methods was compared with the predictions based on the experimental fatigue properties. Based on the results obtained, the newly proposed estimation method has a significant improvement on the relation between fatigue ductility coefficient and Brinell hardness, which consequently improves the fatigue life prediction accuracy with the scatter band of 2, particularly for the materials with low Brinell hardness. The present study can provide a simplified analysis of the preliminary fatigue design of engineering structures.
Tower foundations are generally of a cast-in-place structure with the disadvantages of low industrialization level and long construction period. The development of prefabricated foundation for transmission line projects is efficient to improve the industrialization level of the construction of tower foundation. In this study, the schemes of post-pouring belt U-shaped steel connection, post-pouring belt lap connection, grouting sleeve connection, and post-tensioned bond prestressed reinforcement connection, which have been widely used on building structures, are newly proposed to apply on plate foundation. The schemes were compared on processing, transporting, on-site constructing and performance. The pseudo-static tests on cast-in-place plate strip, post-pouring belt U-shaped steel connection and post-pouring belt lap connection plate strip were carried out. The results revealed that all the test plate bands were damaged in the bending mode, same as that of ordinary concrete. When U-shaped steel is adopted, more than 90% of the cast-in-place bearing capacity can be reached. The initial stiffness of prefabricated plate strip and cast-in-place strip is basically the same. The load-bearing capacity of the component is relevant to the anchorage length of the U-shaped steel. Although increasing the concrete strength of post-cast belt can improve the ultimate bearing capacity and shorten the construction period, the deformation capacity is reduced. Compared to other connection methods, post-pouring belt U-shaped steel connections have the advantage of simple construction, higher bearing capacity and stability. In summary, the post-pouring belt U-shaped steel connection scheme is recommended.
The strain rate effect can influence the seismic responses of reinforced concrete (RC) structures because the constitutive relationship of concrete and rebar is rate‐dependent. This paper carries out progressive collapse analysis to research the influence of strain rate effects on collapse‐resistant capacity, collapse mode, and collapse path of the RC frame structure. A progressive collapse simulation program for the reinforced concrete (RC) structure with a static and dynamic constitutive relationship is coded individually using the user subroutine VUMAT and then implemented in the advanced finite element program ABAQUS. The good agreement between experimental and simulation results proves that the coded subroutine is reliable. With the coded subroutine, by conducting progressive collapse analyses of a four‐story RC frame structure under earthquake, the effect of strain rate on the response is investigated. The numerical results demonstrate that the collapse‐resistant capacity of the structure is underestimated when the strain rate effect is neglected. It is shown that strain rate effects influence the collapse mode and collapse path of the structure. Therefore, strain rate effects should be considered in the progressive collapse analysis of the RC frame structure.
In the whole service life of building clusters, they will encounter multiple hazards, including the disaster chain of earthquakes and building debris. The falling debris may block the post-earthquake roads and even severely affect the evacuation, emergency, and recovery operations. It is of great significance to develop a surrogate model for predicting seismic responses of building clusters as well as a prediction model of post-earthquake debris. This paper presents a general methodology for developing a surrogate model for rapid seismic responses calculation of building clusters and probabilistic prediction model of debris width. Firstly, the building cluster is divided into several types of representative buildings according to the building function. Secondly, the finite element (FE) method and discrete element (DE) method are, respectively, used to generate the data pool of structural floor responses and debris width. Finally, with the structural response data of maximum floor displacement, a surrogate model for rapidly calculating seismic responses of structures is developed based on the XGBoost algorithm, achieving R2 > 0.99 for floor displacements and R2 = 0.989 for maximum inter-story drift ratio (MIDR) predictions. In addition, an unbiased probabilistic prediction model for debris width of blockage is established with Bayesian updating rule, reducing the standard deviation of model error by 60% (from σ = 10.2 to σ = 4.1). The presented models are applied to evaluate the seismic damage of the campus building complex in China University of Mining and Technology, and then to estimate the range of post-earthquake falling debris. The results indicate that the surrogate model reduces computational time by over 90% compared to traditional nonlinear time-history analysis. The application in this paper is helpful for the development of disaster prevention and mitigation policies as well as the post-earthquake rescue and evacuation strategies for urban building complexes.
Generally, only wind effect is considered in the collapse evaluation of transmission poles (TPs). However, during a typhoon landing, the rainfall is usually very heavy and the influence of the wind and rainfall should be considered simultaneously. To estimate the bearing capacity of TPs accurately during a typhoon, this paper proposes a method for predicting the water content distribution of soil based on the deep learning method. Then, the earth pressure distribution related to the rainfall is obtained. Furthermore, according to the static balance principle, the ultimate overturning moment of the TPs is obtained, and the corresponding critical wind speed is determined via a numerical simulation. Finally, a case study is tested and the collapse evaluation of TPs under the combined effects of wind and rainfall is obtained. The results show that the critical wind speed when considering rainfall is less than the value when ignoring the rainfall effect. The traditional method overestimates the structural safety of the TPs because the rainfall has a significant reduction on the bearing capacity of TPs.
Steel-lattice transmission towers require efficient and reliable connection designs to ensure structural safety and cost-effectiveness. While traditional gusset plate connections increase their complexity and structural weight, direct bolted connections offer a simpler and lighter alternative. However, the adoption of staggered bolt arrangements, necessitated by the geometric constraints of chord angle members, challenges the applicability of existing design standards—particularly regarding block shear and net section failure modes. This study explores the structural behavior of staggered two-bolt angle connections through a combination of experimental testing and numerical modeling. Twelve full-scale specimens were subjected to axial tension to investigate the effects of key geometric parameters, including end distance, edge distance, and bolt stagger. Finite element analyses, which incorporate material nonlinearity and fracture criteria, delve deeper into the stress distribution and failure mechanisms. The results demonstrate significant deviations in failure modes compared with conventional parallel bolt arrangements, underscoring the limitations of current design standards (DL/T 5486, ASCE 10-15, and EN 1993-1-8) in accurately predicting the capacity of staggered connections. Based on the identified failure modes of staggered two-bolt connections, this study proposes an enhanced design methodology for member fracture capacity, incorporating block shear calculation models from the three aforementioned standards. Comparative analysis demonstrates that the ASCE standard provides superior predictive accuracy, with experimental validation exceeding 95% agreement. The study culminates in specific design recommendations for staggered two-bolt connections, offering critical insights into stress redistribution mechanisms, material behavior, and deformation-induced failure patterns. These findings contribute to the development of more accurate and safer design guidelines for bolted connections in steel transmission towers.