Junayed Pasha

Dr. Junayed Pasha

Department of Biomedical, Industrial and Systems Engineering, Gannon University, Erie, PA 16541, USA
orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 March 2022 in IEEE Transactions on Intelligent Transportation Systems
Verified
Journal Article
Closed access
Junayed PashaJunayed Pasha
Junayed Pasha
Zeinab elmiZeinab elmi
Zeinab elmi
SPSumit Purkayastha
Sumit Purkayastha
AFAmir M. Fathollahi-Fard
Amir M. Fathollahi-Fard
YGYing-En Ge
Ying-En Ge
Maxim DulebenetsMaxim Dulebenets
Maxim Dulebenets
Drones are receiving popularity with time due to their advanced mobility. Although they were initially deployed for military purposes, they now have a wide array of applications in various public and private sectors. Further deployment of drones can promote the global economic recovery from the COVID-19 pandemic. Even though drones offer a number of advantages, they have limited flying time and weight carrying capacity. Effective drone schedules may assist with overcoming such limitations. Drone scheduling is associated with optimization of drone flight paths and may include other features, such as determination of arrival time at each node, utilization of drones, battery capacity considerations, and battery recharging considerations. A number of studies on drone scheduling have been published over the past years. However, there is a lack of a systematic literature survey that provides a holistic overview of the drone scheduling problem, existing tendencies, main research limitations, and future research needs. Therefore, this study conducts an extensive survey of the scientific literature that assessed drone scheduling. The collected studies are grouped into different categories, including general drone scheduling, drone scheduling for delivery of goods, drone scheduling for monitoring, and drone scheduling with recharge considerations. A detailed review of the collected studies is presented for each of the categories. Representative mathematical models are provided for each category of studies, accompanied by a summary of findings, existing gaps in the state-of-the-art, and future research needs. The outcomes of this research are expected to assist the relevant stakeholders with an effective drone schedule design.

1 April 2021 in Advanced Engineering Informatics
Verified
Journal Article
Closed access
Junayed PashaJunayed Pasha
Junayed Pasha
Maxim DulebenetsMaxim Dulebenets
Maxim Dulebenets
AFAmir M. Fathollahi-Fard
Amir M. Fathollahi-Fard
GTGuangdong Tian
Guangdong Tian
YLYui-Yip Lau
Yui-Yip Lau
BLBenbu Liang
Benbu Liang

22 June 2021 in IEEE Access
Verified
Journal Article
Open access
PSPRASHANT SINGH
PRASHANT SINGH
Maxim DulebenetsMaxim Dulebenets
Maxim Dulebenets
Junayed PashaJunayed Pasha
Junayed Pasha
EGErnesto D. R. Santibanez Gonzalez
Ernesto D. R. Santibanez Gonzalez
Yui-yip LauYui-yip Lau
Yui-yip Lau
RKRaphael Kampmann
Raphael Kampmann
Automation is expected to effectively address the growing demand for passenger and freight transportation, safety issues, human errors, and increasing congestion. The growth of autonomous vehicles using the state-of-the-art connected vehicle technologies has paved the way for the development of passenger and freight autonomous trains (ATs), also known as driverless trains. ATs are fully automated trains that are centrally controlled using advanced communication and internet technologies, such as high-speed internet (5G) technology, Internet of Things, dedicated short range communications, digital video detection cameras, and artificial intelligence-based methods. The current study focuses on a detailed up-to-date review of the existing trends, technologies, advancements, and challenges in the deployment of ATs with a full automation level in rail transportation. The basic AT features along with the key technologies that are instrumental for the AT deployment and operations are discussed in detail. Furthermore, a comprehensive evaluation of the state-of-the-art research efforts is performed as well with a specific emphasis on the issues associated with the AT deployment, user perception and outlook for ATs, innovative concepts and models that could be used for the AT design, and the AT operations at highway-rail grade crossings. Based on the conducted review, this study determines the main advantages and challenges from the AT deployment. The identified challenges have to be collaboratively addressed by the relevant stakeholders, including railroad companies, researchers, and government representatives, to facilitate the AT development and deployment considering the perspectives of future users and without affecting the safety level.

20 July 2020 in IEEE Access
Verified
Journal Article
Open access
Junayed PashaJunayed Pasha
Junayed Pasha
Maxim DulebenetsMaxim Dulebenets
Maxim Dulebenets
MKMasoud Kavoosi
Masoud Kavoosi
OAOlumide Abioye
Olumide Abioye
HWHui Wang
Hui Wang
WGWeihong "Grace" Guo
Weihong "Grace" Guo
The “factory-in-a-box” concept involves assembling production modules (i.e., factories) in containers and transporting the containers to different customer locations. Such a concept could be highly effective during emergencies, when there is an urgent demand for products (e.g., the COVID-19 pandemic). The “factory-in-a-box” planning problem can be divided into two sub-problems. The first sub-problem deals with the assignment of raw materials to suppliers, sub-assembly decomposition, assignment of sub-assembly modules to manufacturers, and assignment of tasks to manufacturers. The second sub-problem focuses on the transport of sub-assembly modules between suppliers and manufacturers by assigning vehicles to locations, deciding the order of visits for suppliers, manufacturers, and customers, and selecting the appropriate routes within the transportation network. This study addresses the second sub-problem, which resembles the vehicle routing problem, by developing an optimization model and solution algorithms in order to optimize the “factory-in-a-box” supply chain. A mixed-integer linear programming model, which aims to minimize the total cost of the “factory-in-a-box” supply chain, is presented in this study. CPLEX is used to solve the model to the global optimality, while four metaheuristic algorithms, including the Evolutionary Algorithm, Variable Neighborhood Search, Tabu Search, and Simulated Annealing, are employed to solve the model for large-scale problem instances. A set of numerical experiments, conducted for a case study of “factory-in-a-box”, demonstrate that the Evolutionary Algorithm outperforms the other metaheuristic algorithms developed for the model. Some managerial insights are outlined in the numerical experiments as well.

1 October 2019 in International Journal of Disaster Risk Reduction
Verified
Journal Article
Closed access
MDMaxim A. Dulebenets
Maxim A. Dulebenets
Junayed PashaJunayed Pasha
Junayed Pasha
OAOlumide Abioye
Olumide Abioye
MKMasoud Kavoosi
Masoud Kavoosi
EOEren E. Ozguven
Eren E. Ozguven
TSThobias Sando
Thobias Sando

1 October 2019 in Advanced Engineering Informatics
Verified
Journal Article
Closed access
MKMasoud Kavoosi
Masoud Kavoosi
MDMaxim A. Dulebenets
Maxim A. Dulebenets
OAOlumide Abioye
Olumide Abioye
Junayed PashaJunayed Pasha
Junayed Pasha
HWHui Wang
Hui Wang
HCHongmei Chi
Hongmei Chi