Honglin Zhao

Honglin Zhao


Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 May 2015 in Chinese Journal of Mechanical Engineering
Verified
Journal Article
Closed access
PDF file
HZHonglin Zhao
Honglin Zhao
RCRui Chen
Rui Chen
XLXiaolan Luo
Xiaolan Luo
MDMenglan Duan
Menglan Duan
YLYinghui Lu
Yinghui Lu
DYDaohui Ye
Daohui Ye
The metal sealing performance of subsea X-tree wellhead connectors is crucial for the safety and reliability of subsea X-trees. In order to establish the theoretical relation between metal sealing ring’s contact stress and its structural parameters and working pressure, a mechanical analysis method for double-cone sealing of high pressure vessels is applied in analyzing the metal sealing ring under the condition of preload and operation. As a result, the formula of the unit sealing load for the metal sealing ring under operation with residual preload is shown in this paper, which ensures that the metal sealing ring has an excellent sealing effect and can prevent the metal sealing ring from yielding. Besides, while analyzing the sealing process of the metal sealing ring, the change rule of contact stress and working pressure is concluded here, putting forward that the structural parameters of the metal sealing ring are the major factors affecting the change rule. Finally, the analytical solution through theoretical analysis is compared with the simulation result through finite element analysis in a force feedback experiment, and both are consistent with each other, which fully verifies for the design and calculation theory on metal sealing ring’s contact stress and its structural parameters and working pressure deduced in this paper. The proposed research will be treated as an applicable theory guiding the design of metal seal for subsea X-tree wellhead connectors.

10 March 2017 in Journal of Geophysics and Engineering
Verified
Journal Article
Open access
PDF file
JLJunqiang Lu
Junqiang Lu
XJXiaodong Ju
Xiaodong Ju
BMBaiyong Men
Baiyong Men
HZHonglin Zhao
Honglin Zhao
WQWenxiao Qiao
Wenxiao Qiao
WDWenxing Duan
Wenxing Duan
An acousto-electric effect logging detector in boreholes is introduced. The detector can measure the first and second type of acousto-electric effect

25 February 2020 in Energies
Verified
Journal Article
Open access
PDF file
YLYufang Li
Yufang Li
HZHonglin Zhao
Honglin Zhao
NXNing Xu
Ning Xu
XWXiaoyu Wang
Xiaoyu Wang
DWDeguo Wang
Deguo Wang
The subsea tree is one of the critical pieces of equipment in the subsea production system, and its installation is related to the safe production of offshore oil and gas. Due to the differences in the form of the structures, the speed of entering the water, the marine environment, and other factors, the process of the structure entering the water is exceedingly complicated. During the engineering installation, the most dangerous phase involves the structure passing through the splash zone. Based on the theory of the movement of the subsea tree passing through the splash zone, Lingshui 17-2 subsea tree installation was analyzed with the marine engineering software OrcaFlex, and a sensitivity analysis of the lowering of the subsea tree was performed. During the splash zone phase, the wave height had the highest impact on the subsea tree, affecting the horizontal offset and cable load, which may lead to the oil tree capsizing and cable breakage. Furthermore, the velocity only affected the horizontal offset, and the overall effect was not noticeable. The operational safety window for the subsea tree installation was established according to the operational safety standards. Therefore, the recommended lowering speed was 0.50 m/s, while the flow velocity should not exceed 1.50 m/s, and the wave height should not be higher than 4.5 m.

15 September 2009
Verified
Conference Paper
Closed access
SZShimin Zhang
Shimin Zhang
QDQingxin Ding
Qingxin Ding
HZHonglin Zhao
Honglin Zhao
The oil and gas pipeline transportation has been developed rapidly in China in recent years. As a result, more and more scheduled and emergent pipeline repair works are required. To carry out hot taps and line stops, hot tapping machines, Lo-profile stop valves, split tees, plugs, and plugging actuators are necessary tools for all of those maintenances. In this paper, the development of oil and gas pipeline hot taps and line stops is introduced. The technical problems and challenges are analyzed according to the development status of hot taps and line stops in China. Finally, the possible solutions are discussed in detail.

15 September 2009
Verified
Conference Paper
Closed access
HZHonglin Zhao
Honglin Zhao
BZBingjie Zhao
Bingjie Zhao
SZShuli Zhang
Shuli Zhang
XJXinbiao Ji
Xinbiao Ji
The characteristics for submarine oil and gas pipe tapping are analyzed, and a new type of submarine oil and gas pipeline tapping machine (SOGPTM) that can achieve fully automatic cycle is built. The SOGPTM is furnished with all functions of a land-based pipeline tapping machine. As a diver can not monitor the process for a long time when the SOGPTM runs on a submarine pipeline, a hydraulic control system comprising a hydraulic control valve block, a hydraulic cylinder, a synchronous clutch and a hydraulic power is designed. The hydraulic control valve block is fixed on the spindle of the tapping machine body and coordinated with a side benchmark of the tapping machine body; hence the tapping process can be controlled fully automatically through touching valves. Results of experiments indicate that the SOGPTM can fully automatically complete the cycle comprising rapid feeding, slow feeding, rapid retraction, and stopping according to the preset travel without any manual intervention. The SOGPTM solves the problem for fully automatic submarine pipeline tapping.

15 September 2009
Verified
Conference Paper
Closed access
HZHonglin Zhao
Honglin Zhao
ZYZhaofeng Yang
Zhaofeng Yang
PZPeng Zhang
Peng Zhang
TXTongchao Xing
Tongchao Xing
YWYingying Wang
Yingying Wang
A smart plug is sent into a pipeline from far end, and accomplishes isolation plugging after reaching specified location. The algorithm for its tracing and positioning is one of critical technologies. Based on the research in transmission rule of low-frequency electromagnetic wave (LFEW) and magnetic dipole, a transmitting/receiving model for LFEW is established; an algorithm for positioning based on bi-peak change rule of LFEW magnetic field amplitude signals is presented. The model analysis and experiments show that good accuracy can be achieved in tracing and positioning the in-pipeline location of a smart plug by taking use of LFEW outside the pipeline.