Paweł Kostyła

Dr. Paweł Kostyła

Wroclaw University of Science and Technology
orcid

Research Focus & Metrics

Academic Career Length

30Years (1997-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 June 2020 in Energies
Verified
Journal Article
Open access
PDF file
Tomasz SikorskiTomasz Sikorski
Tomasz Sikorski
Michał JasińskiMichał Jasiński
Michał Jasiński
EREdyta Ropuszyńska-Surma
Edyta Ropuszyńska-Surma
MWMagdalena Węglarz
Magdalena Węglarz
DKDominika Kaczorowska
Dominika Kaczorowska
BSBeata Solak
Beata Solak
The article presents calculations and power flow of a real virtual power plant (VPP), containing a fragment of low and medium voltage distribution network. The VPP contains a hydropower plant (HPP), a photovoltaic system (PV) and energy storage system (ESS). The purpose of this article is to summarize the requirements for connection of generating units to the grid. Paper discusses the impact of the requirements on the maximum installed capacity of distributed energy resource (DER) systems and on the parameters of the energy storage unit. Firstly, a comprehensive review of VPP definitions, aims, as well as the characteristics of the investigated case study of the VPP project is presented. Then, requirements related to the regulation, protection and integration of DER and ESS with power systems are discussed. Finally, investigations related to influence of DER and ESS on power network condition are presented. One of the outcomes of the paper is the method of identifying the maximum power capacity of DER and ESS in accordance with technical network requirements. The applied method uses analytic calculations, as well as simulations using Matlab environment, combined with real measurement data. The obtained results allow the influence of the operating conditions of particular DER and ESS on power flow and voltage condition to be identified, the maximum power capacity of ESS intended for the planed VPP to be determined, as well as the influence of power control strategies implemented in a PV power plant on resources available for the planning and control of a VPP to be specified. Technical limitations of the DER and ESS are used as input conditions for the economic simulations presented in the accompanying paper, which is focused on investigations of economic efficiency.

22 November 2019 in Energies
Verified
Journal Article
Open access
PDF file
Tomasz SikorskiTomasz Sikorski
Tomasz Sikorski
Michał JasińskiMichał Jasiński
Michał Jasiński
EREdyta Ropuszyńska-Surma
Edyta Ropuszyńska-Surma
MWMagdalena Węglarz
Magdalena Węglarz
DKDominika Kaczorowska
Dominika Kaczorowska
PJPrzemyslaw Janik
Przemyslaw Janik
This paper analyzes the technical and economic possibilities of integrating distributed energy resources (DERs) and energy-storage systems (ESSs) into a virtual power plant (VPP) and operating them as a single power plant. The purpose of the study is to assess the economic efficiency of the VPP model, which is influenced by several factors such as energy price and energy production. Ten scenarios for the VPP were prepared on the basis of the installed capacities of a hydropower plant (HPP), rooftop solar photovoltaic (PV), and energy-storage system (ESS), as well as weather conditions, in Poland. On the basis of technical conditions, it was assumed that the maximum power capacity of the ESS equaled 1.5 MW. The economic efficiency analysis presented in this paper demonstrated that, in seven years, the VPP will achieve a positive value of the net present value (NPV) for a scenario with 0.5 MW battery storage and rainy summers. Furthermore, sensitivity analysis was conducted on price factors and DER production volume. The price variable had a major impact on the NPV value for all scenarios. The scenario with a 0.5 MW battery and typical summers was highly sensitive to all factors, and its sensitivity decreased as the ESS capacity grew from 0.5 to 1.5 MW.

13 May 2022 in IEEE Transactions on Power Delivery
Verified
Journal Article
Closed access
MWMarek Wasowski
Marek Wasowski
Marcin HabrychMarcin Habrych
Marcin Habrych
Tomasz SikorskiTomasz Sikorski
Tomasz Sikorski
PKPaweł Kostyła
Paweł Kostyła
MJMariusz Jurczyk
Mariusz Jurczyk
MGMarcin Golemo
Marcin Golemo
The article presents the cross-sectional results of analyzes of authentic conducted disturbances introduced into public power networks by various types of loads installed at end users. The foundation for the research was a set of 260 identified cases of Power Line Communication (PLC) transmission disturbances based on the Open Smart Grid Protocol (OSGP) technology, which were recorded in the urban network of the distribution system operator covering over 400,000 smart meters. The paper presents a quantitative assessment of the share of loads that most often cause problems with transmission efficiency. Moreover, a qualitative assessment of the detected disturbance cases was carried out in terms of conditions relating to the structure of the power grid and real transmission levels and disturbance levels. The authors made a pioneering analysis in the so-called “communication path” where the PLC communication disturbance was identified, i.e., from the installation point of the PLC concentrator to the metering point where the energy meter, with which the connection was lost, was installed.

17 September 2021 in Energies
Verified
Journal Article
Open access
PDF file
FAFachrizal Aksan
Fachrizal Aksan
Michał JasińskiMichał Jasiński
Michał Jasiński
Tomasz SikorskiTomasz Sikorski
Tomasz Sikorski
DKDominika Kaczorowska
Dominika Kaczorowska
JRJacek Rezmer
Jacek Rezmer
PJPrzemyslaw Janik
Przemyslaw Janik
In this article, a case study is presented on applying cluster analysis techniques to evaluate the level of power quality (PQ) parameters of a virtual power plant. The conducted research concerns the application of the K-means algorithm in comparison with the agglomerative algorithm for PQ data, which have different sizes of features. The object of the study deals with the standardized datasets containing classical PQ parameters from two sub-studies. Moreover, the optimal number of clusters for both algorithms is discussed using the elbow method and a dendrogram. The experimental results show that the dendrogram method requires a long processing time but gives a consistent result of the optimal number of clusters when there are additional parameters. In comparison, the elbow method is easy to compute but gives inconsistent results. According to the Calinski–Harabasz index and silhouette coefficient, the K-means algorithm performs better than the agglomerative algorithm in clustering the data points when there are no additional features of PQ data. Finally, based on the standard EN 50160, the result of the cluster analysis from both algorithms shows that all PQ parameters for each cluster in the two study objects are still below the limit level and work under normal operating conditions.

17 June 2021 in IEEE Access
Verified
Journal Article
Open access
Guido CarpinelliGuido Carpinelli
Guido Carpinelli
Antonio BracaleAntonio Bracale
Antonio Bracale
Pietro VarilonePietro Varilone
Pietro Varilone
Tomasz SikorskiTomasz Sikorski
Tomasz Sikorski
PKPaweł Kostyła
Paweł Kostyła
Zbigniew LeonowiczZbigniew Leonowicz
Zbigniew Leonowicz
Waveforms distortion is a pressing concern in Smart Grids where a massive presence of new technologies in distributed energy resources and in advanced smart metering systems is expected. In this context, the increasing diffusion of high switching frequencies static converters and the growing usage of Power Line Communication push for research dealing with the assessment of waveforms with spectral components up to 150 kHz. The analysis of such waveforms is a challenge for researchers due to the contemporaneous presence of a high number of spectral components in the range of low- (up to 2 kHz) and high- (up to 150 kHz) frequencies, with their opposite needs in term of time window length (and frequency resolution). The main idea of this paper is to improve the performances of existing methods by using a joint method of analysis based on a profitable strategy of divide and conquer; the method guarantees the best compromise between accuracy and computational efforts. A Discrete Wavelet Transform initially divides the original waveform to obtain two frequency bands: the wavelet suitability for conducting multi-resolution time-frequency analysis on waveforms in different frequency bands with different frequency resolution is effectively exploited. Then, the sliding-window modified ESPRIT method and the sliding-window Discrete Fourier Transform which uses a Nuttal window are used for the analysis of the low- and high-frequency bands, respectively; the positive characteristics of each method are exploited, minimizing the drawbacks and integrating their behavior so that the whole joint method allows an accurate estimation of each low- and high-frequency spectral component with the required acceptable computational efforts. The proposed method is tested on synthetic and measured waveforms in terms of accuracy and computational efforts. The analysis of the numerical application results clearly reveals that the proposed method improves the performances of existing methods of analysis in the examined cases.

17 December 2020 in Energies
Verified
Journal Article
Open access
PDF file
DKDominika Kaczorowska
Dominika Kaczorowska
JRJacek Rezmer
Jacek Rezmer
Michał JasińskiMichał Jasiński
Michał Jasiński
Tomasz SikorskiTomasz Sikorski
Tomasz Sikorski
Vishnu SureshVishnu Suresh
Vishnu Suresh
PJPrzemyslaw Janik
Przemyslaw Janik
A virtual power plant (VPP) can be defined as the integration of decentralized units into one centralized control system. A VPP consists of generation sources and energy storage units. In this article, based on real measurements, the charging and discharging characteristics of the battery energy storage system (BESS) were determined, which represents a key element of the experimental virtual power plant operating in the power system in Poland. The characteristics were determined using synchronous measurements of the power of charge and discharge of the storage and the state of charge (SoC). The analyzed private network also includes a hydroelectric power plant (HPP) and loads. The article also examines the impact of charging and discharging characteristics of the BESS on its operation, analyzing the behavior of the storage unit for the given operation plans. The last element of the analysis is to control the power flow in the private network. The operation of the VPP for the given scenario of power flow control was examined. The aim of the scenario is to adjust the load of the private network to the level set by the function. The tests of power flow are carried out on the day on which the maximum power demand occurred. The analysis was performed for four cases: a constant value limitation when the HPP is in operation and when it is not, and two limits set by function during normal operation of the HPP. Thus, the article deals not only with the issue of determining the actual characteristics of charging and discharging the storage unit, but also their impact on the operation of the entire VPP.