The most common approach to risk assessment for power systems is based on the principle. Nevertheless, the economic rationale suggests its relaxation in cases where the consequences are relatively minor and exacerbation when they are large. This study addresses this need by proposing an alternative operational risk assessment methodology that is based on both probabilities and costs of possible contingencies. The foundations are built on listing all possible contingencies that may be considered by the transmission system operator (TSO). As only a subset of these contingencies can be examined in reasonable time, the upper and lower risk boundaries are introduced to quantify the risk underestimation. The ratio of those limits is used as an accuracy indicator, which – according to the desired level – may help the TSO to identify the required number of contingencies that have to be analysed. Furthermore, several approaches to improve the reduction of the number of simulated contingencies are discussed and the results obtained basing on the dynamic IEEE39 model are presented.
The current European policy roadmap aims at forcing the TSOs to coordinate remedial actions used for relieving the congestions in the synchronous power system. In this paper, an optimization problem for coordinated congestion management is described and its results obtained for a real European use cases created in the H2020 EU-SysFlex project are presented. First of all, these results prove the feasibility of a central optimization problem for the coordination of the cross-border congestion management process. Next, the formulated optimization problem is used to tackle the issue of planning the investments in phase-shifting transformers (PSTs), for the purpose of increasing the efficiency/decreasing the cost of congestion management. Finally, this paper introduces two optimization-based indicators for pre-selecting the investment sites, which may be used to support the decision makers aiming at decreasing the costs of coordinated congestion management.
Risk-based redispatch optimization is proposed as a methodology to support the Transmission System Operator (TSO) with preventive remedial actions obtained by extending the security-constrained unit commitment/economic dispatch with constraints resulting from the risk assessed for the power system. Although being heuristic, the methodology is based on comprehensive dynamic security assessment as time-domain simulations are used, allowing to express the degree of all types of instabilities, e.g., caused by contingencies, in monetary terms. Therefore, the risk is assessed as the expected value of the cost incurred by the TSO. Such an approach forms a new pathway to including risk in planning procedures already used by TSOs. Results obtained for the IEEE39 dynamic power system, with costs assigned to load shedding and generator tripping due to single transmission lines short-circuits, are shown as a reference case.
The implementation of network codes within the framework of European Transmission System Operators (TSOs), involves redesigning the process of executing remedial actions aimed at maintaining the power system on a daily basis. One of the key elements of this redesign is the co-optimisation of all accessible measures, bringing a cost-optimal result and providing network security for the entire Capacity Calculation Region (CCR). This specifically means that the currently installed Phase Shifting Transformers (PSTs) are expected to be utilised for the benefit of the whole CCR, with no special priority to any issues incurred by the owner. Therefore, this paper addresses any questions regarding the rules of financing (investment shares per TSO) to be applied for future PST installations. The investment shares are calculated based on the exemplary implementation of a new European procedure – cost-sharing of remedial actions. Consequently, another long-term application of this process is postulated. In order to support the claims with numerical evidence, two scenarios with new PST investments are analysed. The conclusions drawn show that the largest investment burden can be imposed upon zones different from the area of which the new PST installation has taken place. As a result, joint TSOs’ investments may be a potential solution to financing new devices used for future coordination of remedial actions.
The process of dynamic risk assessment in power systems is commonly based on the analysis of both, probabilities and costs for a set of critical contingencies. Increasing the accuracy of this process requires processing many contingencies possibly with the help of time-domain simulations (TDS), which are highly time consuming and computationally expensive, but allow providing reliable results. This paper introduces probabilistic prioritization (PP) as a method to select critical N-k contingencies and provide an efficient identification of the critical ones by a reduction of the number of TDS. Although PP pays attention only to probabilities of contingencies, it utilizes the concept of risk accuracy, in order to provide a stopping criterion for TDS used to assess the costs resulting from particular contingencies. Moreover, the PP method is general and may be applied in other risk assessment processes. The extended IEEE39 system was used to investigate the PP method and the results show that the reduction of the TDS number is around 31 % for PP, when compared with a reference case, where contingency filtering was not applied.
Risk-based redispatch optimization is proposed as a methodology to support the Transmission System Operator (TSO) with preventive remedial actions obtained by extending the security constrained unit commitment/economic dispatch with constraints resulting from the risk assessed for the power system. Although being heuristic, the methodology is based on comprehensive dynamic security assessment as time-domain simulations are used, allowing to express the degree of all types of instabilities, e.g., caused by contingencies, in monetary terms. Therefore, the risk is assessed as the expected value of the cost incurred by the TSO. Such approach forms a new pathway to including risk in planning procedures already used by TSOs. Results obtained for the IEEE39 dynamic power system, with costs assigned to load shedding and generator tripping due to single transmission lines short-circuits, are shown as a reference case.