Connecting photovoltaic micro-installations to a low-voltage network changes the operating conditions of the network. As a result, in certain situations, the permissible operating limits may be periodically exceeded. The risk of exceeding the normal operating conditions of the network depends on multiple factors, including the installed capacity of the photovoltaic sources. In this article, we use a time-series method to determine the annual risks of exceeding the bus voltage limits, the rated current of the lines and transformer, and the acceptable limit of the negative sequence component of bus voltage, as well as the risk of a reverse flow occurring, and the risk of energy losses increasing. We calculate these risks for different levels of penetration of the photovoltaic sources, different divisions of the rated power of the photovoltaic sources between individual phases, and different consumer load profiles. We perform calculations on a CIGRE test network using OpenDSS and statistical meteorological data for the Katowice (Poland) weather station. The results obtained indicate that connecting photovoltaic micro-installations to a low-voltage network has the greatest impact on the risk of reverse flow occurring and the risk of energy losses increasing. In addition, the risk of overvoltage and branch overload increases substantially. The method we present allows one to determine the value of the hosting capacity of a given low-voltage network, ensuring that the assumed risk of exceeding the normal operating conditions of the network is retained.
1 March 2016 in Bulletin Of The Polish Academy Of Sciences-Technical Sciences
Photovoltaic (PV) systems are becoming increasingly popular, especially in residential buildings. However, the high penetration of prosumer PV micro-installations can have a negative impact on the operation of distribution networks due to the low self-consumption of the energy produced. One way to mitigate this problem is to use a residential energy storage system (RESS) and load shifting under a demand-side management (DSM) scheme. Energy management systems (EMSs) are used to control the operation of RESSs and to implement DSM. There are two main categories of EMSs: rule-based and optimization-based. Optimization-based EMSs provide better results than rule-based EMSs but can be computationally expensive. This article proposes an optimization-based EMS that is designed specifically for residential buildings. The proposed home energy management system (HEMS) uses a particle swarm optimization method to maximize the prosumer’s financial neutrality, which is calculated based on dynamic energy prices. Simulation-based evaluation using the measurements taken in a building equipped with a PV source, RESS, and shiftable loads shows the improved performance of the proposed HEMS compared to rule-based RESS control. The results show that the designed HEMS increases self-consumption, thus reducing the impact of the prosumer’s PV micro-installations on the distribution grid.
20 June 2018 in IET Generation, Transmission & Distribution
The most common approach to risk assessment for power systems is based on the principle. Nevertheless, the economic rationale suggests its relaxation in cases where the consequences are relatively minor and exacerbation when they are large. This study addresses this need by proposing an alternative operational risk assessment methodology that is based on both probabilities and costs of possible contingencies. The foundations are built on listing all possible contingencies that may be considered by the transmission system operator (TSO). As only a subset of these contingencies can be examined in reasonable time, the upper and lower risk boundaries are introduced to quantify the risk underestimation. The ratio of those limits is used as an accuracy indicator, which – according to the desired level – may help the TSO to identify the required number of contingencies that have to be analysed. Furthermore, several approaches to improve the reduction of the number of simulated contingencies are discussed and the results obtained basing on the dynamic IEEE39 model are presented.
Risk-based redispatch optimization is proposed as a methodology to support the Transmission System Operator (TSO) with preventive remedial actions obtained by extending the security-constrained unit commitment/economic dispatch with constraints resulting from the risk assessed for the power system. Although being heuristic, the methodology is based on comprehensive dynamic security assessment as time-domain simulations are used, allowing to express the degree of all types of instabilities, e.g., caused by contingencies, in monetary terms. Therefore, the risk is assessed as the expected value of the cost incurred by the TSO. Such an approach forms a new pathway to including risk in planning procedures already used by TSOs. Results obtained for the IEEE39 dynamic power system, with costs assigned to load shedding and generator tripping due to single transmission lines short-circuits, are shown as a reference case.