Electrification of the transportation sector can play a vital role in reshaping smart cities. With an increasing number of electric vehicles (EVs) on the road, deployment of well-planned and efficient charging infrastructure is highly desirable. Unlike level 1 and level 2 charging stations, level 3 chargers are super-fast in charging EVs. However, their installation at every possible site is not techno-economically justifiable because level 3 chargers may cause violation of critical system parameters due to their high power consumption. In this paper, we demonstrate an optimized combination of all three types of EV chargers for efficiently managing the EV load while minimizing installation cost, losses, and distribution transformer loading. Effects of photovoltaic (PV) generation are also incorporated in the analysis. Due to the uncertain nature of vehicle users, EV load is modeled as a stochastic process. Particle swarm optimization (PSO) is used to solve the constrained nonlinear stochastic problem. MATLAB and OpenDSS are used to simulate the model. The proposed idea is validated on the real distribution system of the National University of Sciences and Technology (NUST) Pakistan. Results show that an optimized combination of chargers placed at judicious locations can greatly reduce cost from $3.55 million to $1.99 million, daily losses from 787kWh to 286kWh and distribution transformer congestion from 58% to 22% when compared to scenario of optimized placement of level 3 chargers for 20% penetration level in commercial feeders. In residential feeder, these statistics are improved from $2.52 to $0.81 million, from 2167kWh to 398kWh and from 106% to 14%, respectively. It is also realized that the integration of PV improves voltage profile and reduces the negative impact of EV load. Our optimization model can work for commercial areas such as offices, university campuses, and industries as well as residential colonies.
Flexible AC Transmission Systems (FACTS) play an important role in minimizing power losses and voltage deviations while increasing the real power transfer capacity of transmission lines. The extent to which these devices can provide benefits to the transmission network depend on their optimal location and sizing. However, finding appropriate locations and sizes of these devices in an electrical network is difficult since it is a nonlinear problem. This paper proposes a technique for the optimal placement and sizing of FACTS, namely the Thyristor-Controlled Series Compensators (TCSCs), Shunt VARs Compensators (SVCs), and Unified Power Flows Controllers (UPFCs). To find the optimal locations of these devices in a network, weak buses and lines are determined by constructing PV curves of load buses, and through the line stability index. Then, the whale optimization algorithm (WOA) is employed not only to find an ideal ratings for these devices but also the optimal coordination of SVC, TCSC, and UPFC with the reactive power sources already present in the network (tap settings of transformers and reactive power from generators). The objective here is the minimization of the operating cost of the system that consists of active power losses and FACTS devices cost. The proposed method is applied to the IEEE 14 and 30 bus systems. The presented technique is also compared with Genetic Algorithm (GA) and Particle Swarm Optimization (PSO). The findings showed that total system operating costs and transmission line losses were considerably reduced by WOA as compared to existing metaheuristic optimization techniques.
28 June 2022 in IEEE Transactions on Power Systems
This paper investigates the joint problems of dynamic state estimation of algebraic variables (voltage and phase angle) and generator states (rotor angle and frequency) of nonlinear differential algebraic equation (NDAE) power network models, under uncertainty. Traditionally, these two problems have been decoupled due to complexity of handling NDAE models. In particular, this paper offers the first attempt to solve the aforementioned problem in a coupled approach where the algebraic and generator states estimates are simultaneously computed. The proposed estimation algorithm herein is endowed with the following properties: (i) it is fairly simple to implement and based on well-understood Lyapunov theory; (ii) considers various sources of uncertainty from generator control inputs, loads, renewables, process and measurement noise; (iii) models phasor measurement unit installations at arbitrary buses; and (iv) is computationally less intensive than the decoupled approach in the literature.
Flexible AC Transmission Systems (FACTS) are essential devices used for the efficient performance of modern power systems and many developing countries lack these devices. Due to the non-existence of these advanced technologies, the national grid remains weak and vulnerable to power stability issues that can jeopardize system stability. This study proposes novel research to solve issues of an evolving national grid through the installation of FACTS devices. FACTS devices play a crucial role in minimizing active power losses while managing reactive power flows to keep the voltages within their respective limits. Due to the high costs of FACTS, optimization must be done to discover optimal locations as well as ratings of these devices. However, due to the nonlinearity, it is a challenging task to find the optimal locations and appropriate sizes of these devices. Shunt VARs Compensators (SVCs) and Thyristor-Controlled Series Compensators (TCSCs) are the two FACTS devices considered for the study. Optimal locations for SVCs and TCSCs are determined by Voltage Collapse Proximity Index (VCPI) and Line Stability Index (), respectively. Particle Swarm Optimization (PSO) is employed to find the ideal rating for FACTS devices to minimize the system operating cost (cost due to active power loss and capital cost of FACTS devices). This technique is applied to IEEE (14 and 30) bus systems. Moreover, reliable operation of the electricity grid through the placement of FACTS for developing countries has also been analysed; Pakistan being a developing country has been selected as a case study. The planning problem has been solved for the present as well as for the forecasted power system. Consequently, in the current national network, 6.21% and 6.71% reduction in active and reactive power losses have been observed, respectively. Moreover, voltage profiles have been improved significantly. A detailed financial analysis covering the calculation of Operation Cost (OC) of the national grid before and after the placement of FACTS devices is carried out.
Nowadays electrical power system usually operates close to its maximum load-ability point, because of increasing load demands and contingencies. Thus avoiding voltage collapse and maintaining power system stability are main concerns for power system operators and utilities. Flexible AC transmission system (FACTS) are modern technologies which can increase power system stability, improve voltage profile and can increase real power transfer, by controlling different parameter like impedance, voltage, and angle of power system, however there optimal allocation and sizing in power system network is important to gain maximum benefits and to control power flow in efficient manners. This paper presents a method for optimal allocation and sizing of FACTS devices. Two type of FACTS devices are selected, thyristor controlled series compensator (TCSC) and shunt VAR compensator (SVC). TCSCs can control impedance of the line while SVCs can control bus voltages. For optimal allocation of these devices weak lines and weak buses are determined using Fast voltage stability index (FVSI) and voltage collapse proximity index (VCPI). Lines with higher values of FVSI are considered as optimal locations for TCSC placements, similarly buses with VCPI value close to unity are considered as weak buses and optimal locations for SVC placement. Particle swarm optimization (PSO) with objective to reduce real power losses and voltage deviations is utilized to find optimal rating of these devices. The technique is applied on IEEE 14 bus test system. Results shows significant reduction in real power losses and improvement in voltage profile.
9 October 2023 in IEEE Transactions on Power Systems
Due to the rapid developments in synchronized measurement technologies, there exist enormous opportunities to attenuate disturbances in future power grids with high penetration of renewables and complex load demands. To that end, this article investigates the effectiveness of new robust feedback controllers for interconnected power systems with advanced power electronics-based models of photovoltaic (PV) power plants, composite load dynamics, and detailed higher-order synchronous generator models. Specifically, we design new, advanced control-theoretic wide-area controllers to improve the transient stability of nonlinear differential-algebraic models. Thorough simulation studies are carried out to assess the performance of the proposed controllers. Several fundamental questions on the proposed controllers' computational complexity and disturbance attenuation performance are raised and addressed. Simulation results demonstrate that with the proposed controllers as a secondary control layer, the overall transient stability and system robustness against load and renewables disturbances/uncertainties can be significantly improved compared to the state-of-the-art.