Flexible pavements and climate are interactive. Pavements are climate sensitive infrastructure, where climate can impact their deterioration rate, subsequent maintenance, and life-cycle costs. Meanwhile, climate mitigation measures are urgently needed to reduce the environmental impacts of pavements and related transportation on the macroclimate and microclimate. Current pavement design and life cycle management practices may need to be modified to adapt to changing climates and to reduce environmental impacts. This paper reports an extensive literature search on qualitative and quantitative pavement research related to climate change in recent years. The topics cover climate stressors, sensitivity of pavement performance to climatic factors, impacts of climate change on pavement systems, and, most importantly, discussions of climate change adaptation, mitigation, and their interactions. This paper is useful for those who aim to understand or research the climate resilience of flexible pavements.
1 May 2021 in Journal of Management in Engineering
The rapid construction of emergency hospitals in areas with a severe COVID-19 outbreak was one of the effective ways to contain and fight the pandemic. However, such rapid construction megaprojects need more than a formal management system to drive the organizational citizenship behavior (OCB) of participants in order to compensate for the lack of formal rules and regulations. Two emergency hospitals especially built for COVID-19 are taken as case studies in this paper to establish a mechanism model and examine the impact of the perceived strength of the COVID-19 event on the emergency megaproject citizenship behavior (EMCB) based on affective events theory (AET). Data from 340 project participants in the two hospitals were collected and tested using structural equation modeling. The results demonstrate that first, the positive affect induced by the COVID-19 event is the direct antecedent that promotes EMCB. Participants’ cognition of event criticality and event novelty was seen to have a positive driving effect on the positive affect. However, their cognition of event urgency and event disruption only triggers negative affect. Second, the positive affect induced by the COVID-19 event was seen to have a strong positive and direct promoting effect on the six dimensions of EMCB. Contrary to expectations, the negative affect induced by the COVID-19 event does not significantly influence the six dimensions of EMCB. This study provides empirical suggestions for project managers on how to motivate EMCB through public emergency management to help achieve project objectives.
The outbreak of COVID-19 has introduced critical challenges in the architecture, engineering, and construction (AEC) industry; to address these challenges, building information modelling (BIM) can be applied as a project management tool to help enhance collaboration among stakeholders and improve business performance. Amidst the COVID-19 crisis, there is a greater need to explore and implement effective strategies to promote a wider adoption of BIM. However, increasing the willingness of project participants to adopt BIM through event management has not received much attention. Therefore, based on event system theory and innovation diffusion theory, we developed a model to explore the influence of the COVID-19 crisis on the willingness of AEC participants to adopt BIM. Structural equation modelling was performed to test the hypotheses. The results demonstrate that the intention of the AEC project participants to adopt BIM is directly driven by the COVID-19 event criticality and perceived usefulness of BIM. Moreover, the event criticality and BIM technical features (relative advantage, compatibility, and complexity) can indirectly affect this intention, through the perceived usefulness. However, the impact of event disruption and novelty on the BIM adoption intention is not significant. Several recommendations are provided to improve the BIM adoption intention of AEC participants during and after the pandemic.
As a sustainable and cleaner type of facility, prefabricated buildings face more design barriers than traditional non-prefabricated buildings. Identifying and managing these barriers is key to improving the success rate of prefabricated building design. However, direct studies on these design barriers are extremely rare. The present study solved this problem by combining multiple methods, including grounded theory (GT), structured self-intersection matrix (SSIM), analytic network process (ANP), and the linear weighted sum method (LWSM). GT was adopted to identify the barriers to prefabricated building design and then SSIM was used to analyze the interactions among them. The eight design barriers were finally identified and classified into three clusters: technical barriers, economic barriers, and management barriers. A further analysis found that there is dependence and feedback among these clusters. The technical barrier cluster and management barrier cluster experience self-feedback. A network model based on ANP was next established to calculate the weights of the barrier elements and then this model was combined with LWSM to evaluate the overall design barrier strength of a project case. The results showed that architectural individualization has the greatest impact on prefabricated building design, followed by the collaborative issues among multiple units and professional designer issues. The overall design barrier strength of the project case was larger. Therefore, the first suggestion provided to the facility management sector is to establish a library for standard house types to achieve architectural design through multihouse combinations.
Component factories are experiencing the problems associated with lean production, especially the accuracy of production time prediction and the unnecessary waste in terms of time and resource utilization. In order to solve these problems, a discrete event simulation‐ (DES‐) based lean planning and optimization method for precast component production is proposed by integrating the complexity assessment (CS), discrete event simulation (DES), and lean management (LM). The method includes three submodels: improved production planning, DES, and lean analysis and optimization. In the submodel of improved production planning, a complexity evaluation index system for precast components is established through investigating five component factories, consulting seven domain experts and analysing relevant literature. In the submodel of DES, the DES technique is adopted to simulate and analyse the production activities of precast components. The submodel of lean analysis and optimization provides multidimensional analysis, comparative analysis, and suggestions. Finally, a detailed production case is selected to simulate and test the proposed method. The important findings are as follows: (1) this method can minimize the difference between the processing time of each workstation to avoid bottleneck stations as much as possible; (2) this method can capture the uncertainty during precast component production, and the most likely production time calculated by the method is 12.05 hours instead of the 11.50 hours originally estimated by the component factory; (3) this method can identify some unnecessary waste in the production process of precast components, including less than 50% utilization of workstations and unnecessary equipment purchases; (4) this method also provides some suggestions regarding production optimization. Due to the particularity of precast component production, it further expands the boundary of lean production methodology from the perspective of the construction industry rather than the manufacturing industry. The proposed method assists component factories in planning and optimizing the precast component production when they make detailed production plans.
24 January 2025 in Frontiers of Engineering Management