Jinwen Xing

Jinwen Xing

Auto-generated profile, based on publicly available information

Jinwen Xing

Institute of Project Management, School of Mechanics and Civil Engineering, China University of Mining and Technology, Xuzhou, People’s Republic of China

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 May 2021 in Building Research & Information
Verified
Journal Article
Closed access
WWWenshun Wang
Wenshun Wang
SGShulei Gao
Shulei Gao
Lingyun MiLingyun Mi
Lingyun Mi
JXJinwen Xing
Jinwen Xing
KSKe Shang
Ke Shang
Na XuNa Xu
Na Xu
The outbreak of COVID-19 has introduced critical challenges in the architecture, engineering, and construction (AEC) industry; to address these challenges, building information modelling (BIM) can be applied as a project management tool to help enhance collaboration among stakeholders and improve business performance. Amidst the COVID-19 crisis, there is a greater need to explore and implement effective strategies to promote a wider adoption of BIM. However, increasing the willingness of project participants to adopt BIM through event management has not received much attention. Therefore, based on event system theory and innovation diffusion theory, we developed a model to explore the influence of the COVID-19 crisis on the willingness of AEC participants to adopt BIM. Structural equation modelling was performed to test the hypotheses. The results demonstrate that the intention of the AEC project participants to adopt BIM is directly driven by the COVID-19 event criticality and perceived usefulness of BIM. Moreover, the event criticality and BIM technical features (relative advantage, compatibility, and complexity) can indirectly affect this intention, through the perceived usefulness. However, the impact of event disruption and novelty on the BIM adoption intention is not significant. Several recommendations are provided to improve the BIM adoption intention of AEC participants during and after the pandemic.