Sina Fardmoradinia

Dr. Sina Fardmoradinia

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 March 2023 in Smart Cities
Verified
Journal Article
Open access
PDF file
Milad Baghalzadeh ShishehgarkhanehMilad Baghalzadeh Shishehgarkhaneh
Milad Baghalzadeh Shishehgarkhaneh
Robert MoehlerRobert Moehler
Robert Moehler
SFSina Fardmoradinia
Sina Fardmoradinia
In recent years, applications of Blockchain technology (BCT) have been progressing at a galloping rate in miscellaneous fields, such as finance, education, travel, healthcare, and insurance. However, BCT has gained much popularity in the construction industry, especially in developed nations worldwide, as it can solve real-world problems, including poor payments, inadequate cooperation and collaboration, inappropriate data sharing among stakeholders, and poor efficiency. The current research employs a bibliometric and systematic literature review (SLR) on utilizing BCT in the construction industry. Using co-occurrence and co-citation studies, network visualization and other methodologies concerning the Web of Science (WOS) database and the research contacts’ patterns were investigated in 482 academic papers. Notable publications, conferences, significant writers, nations, organizations, and funding organizations have been acknowledged. Our research reveals that the primary study topics are BCT in the construction industry, supply chain management, smart contracts, sustainability, building information modeling (BIM), the Internet of Things (IoT) and energy efficiency. Several possible fields for further research are mentioned, including the use of BCT in: (i) circular economy, (ii) risk management, (iii) smart villages, and (iv) infrastructure construction projects.

3 June 2022 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
RBReza Bakhshi
Reza Bakhshi
SFSina Fardmoradinia
Sina Fardmoradinia
RJRasool Jani
Rasool Jani
RPRamin Vafaei Poursorkhabi
Ramin Vafaei Poursorkhabi
A primary task to a project manager is to ensure that the project proceeds timely and on the budget. Earned value management (EVM) is the most common method to evaluate and further predict a project in terms of time and cost. Because of poor accuracy in forecasting different durations, the application of the EVM for schedule performance prediction has been limited. Therefore, in this paper, the Kalman filter was used to analyze the data and compare the results with those of a few hybrid machine learning (HML) techniques. The innovation of this study comes in the face of the prediction of the project time and cost by efficient machine learning algorithms based on some directly measurable variables. For this purpose, 398 data points from five different dam projects were used to predict two output variables by hybrid schemes of multilayer perceptron (MLP) algorithm combined with the genetic algorithm (GA) and particle swarm optimization (PSO), herein referred to as MLP-GA and MLP-PSO, respectively. Four input variables, namely earned schedule (month), earned value ($), actual progress (%), and actual cost (%), were considered for time prediction, and the time (month) was considered as an input variable for cost prediction. The results showed that early warnings for the risk of delay in project schedule and cost were generated in months 1 and 8 by the MLP-PSO, months 1 and 11 by the MLP-GA, and rather months 7 and NV (no value) for the Kalman filter, indicating the fast operation coupled with high accuracy of the HML algorithms, as compared to the Kalman filter. In addition, the two HML algorithms were compared based on statistical error indices to determine the best one. After reviewing the results, the MLP-PSO was found to outperform the MLP-GA in terms of convergence rate and accuracy. To the best of our knowledge, none of the previous studies have used the proposed hybrid algorithms (MELM-PSO and MELM-GA) for forecasting, simultaneously, the time and cost as two critical parameters in the project management, indicating the novelty of our research.

19 October 2022 in Smart Cities
Verified
Journal Article
Open access
PDF file
Milad Baghalzadeh ShishehgarkhanehMilad Baghalzadeh Shishehgarkhaneh
Milad Baghalzadeh Shishehgarkhaneh
SFSina Fardmoradinia
Sina Fardmoradinia
Afram KeivaniAfram Keivani
Afram Keivani
MAMahdi Azizi
Mahdi Azizi
In recent years, dam construction has become more complex, requiring an effective project management method. Building Information Modeling (BIM) affects how construction projects are planned, designed, executed, and operated. Therefore, reducing execution time, cost, and risk and increasing quality are the primary goals of organizations. In this paper, first, the time and cost of the project were obtained via the BIM process. Subsequently, optimization between the components of the survival pyramid (time, cost, quality, and risk) in construction projects was completed in a case study of the Ghocham storage dam in five different modes, including contractor’s offers, BIM, actual, and two other modes based on the expert’s opinions. For this aim, five different meta-heuristic optimization algorithms were utilized, including two classical algorithms (Genetic and Simulated Annealing) and three novel algorithms (Black Widow Optimization, Battle Royale Optimization, and Black Hole Mechanics Optimization). In four cases, once each element of the survival pyramid was optimized separately, all four cases were traded off simultaneously. Moreover, the results were obtained from all the mentioned algorithms in five scenarios based on the number of function evaluation (Nfe), Standard Deviation (SD), Computation Time (CT), and Best Cost (BC). MATLAB software completed the coding related to the objective functions and optimization algorithms. The results indicated the appropriate performance of GA and BHMO algorithms in some scenarios. However, only the GAs should be considered effective algorithms in a dam construction projects’ time–cost–quality–risk (TCQR) tradeoff.

6 June 2025 in Sustainable Futures
Verified
Journal Article
Open access
AHAlireza Hoveidafard
Alireza Hoveidafard
SFSina Fardmoradinia
Sina Fardmoradinia
BGBabak Golchin
Babak Golchin
AGAli Ghaffari
Ali Ghaffari

29 April 2024 in Hydrology Research
Verified
Journal Article
Open access
PDF file
NANegin Ahmadi
Negin Ahmadi
SFSina Fardmoradinia
Sina Fardmoradinia
HIGHLIGHTS. Integration of ANFIS methods with optimization algorithms was done.Effective flood estimation with limited data was done.Quantitative assessmen

25 November 2024 in Eng
Verified
Journal Article
Open access
PDF file
SFSina Fardmoradinia
Sina Fardmoradinia
Ahmed Rasul HusseinAhmed Rasul Hussein
Ahmed Rasul Hussein
MCMelissa Chan
Melissa Chan
NBNiloufar Bagherifam
Niloufar Bagherifam
Milad Baghalzadeh ShishehgarkhanehMilad Baghalzadeh Shishehgarkhaneh
Milad Baghalzadeh Shishehgarkhaneh
The potential for energy efficiency in office buildings is critical, especially in regions facing rapid climate change impacts. This study investigates the use of phase change materials (PCMs) and double-skin façades (DSFs) to optimize energy performance in office buildings in Iran, a country with significant energy demands for heating and cooling. Utilizing Building Information Modeling (BIM) and EnergyPlus 24.1.0 software, we evaluated energy consumption trends across climate scenarios from 1981 to 2030. The findings underscore the rising energy demand due to global temperature increases and demonstrate that integrating PCMs and DSFs can mitigate energy consumption. This research highlights the importance of region-specific building strategies to achieve energy-efficient designs and contributes practical insights for developing sustainable energy policies in Iran.