Spyros Giannelos

Dr. Spyros Giannelos

orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 June 2024 in Electric Power Systems Research
Verified
Journal Article
Open access
Spyros GiannelosSpyros Giannelos
Spyros Giannelos
FBFederica Bellizio
Federica Bellizio
GSGoran Strbac
Goran Strbac
TZTai Zhang
Tai Zhang


30 June 2023 in Energies
Verified
Journal Article
Open access
PDF file
Spyros GiannelosSpyros Giannelos
Spyros Giannelos
SBStefan Borozan
Stefan Borozan
MAMarko Aunedi
Marko Aunedi
XZXi Zhang
Xi Zhang
HAHossein Ameli
Hossein Ameli
GSGoran Strbac
Goran Strbac
The decarbonisation of the electricity grid is expected to create new electricity flows. As a result, it may require that network planners make a significant amount of investments in the electricity grids over the coming decades so as to allow the accommodation of these new flows in a way that both the thermal and voltage network constraints are respected. These investments may include a portfolio of infrastructure assets consisting of traditional technologies and smart grid technologies. One associated key challenge is the presence of uncertainty around the location, the timing, and the amount of new demand or generation connections. This uncertainty unavoidably introduces risk into the investment decision-making process as it may lead to inefficient investments and inevitably give rise to excessive investment costs. Smart grid technologies have properties that enable them to be regarded as investment options, which can allow network planners to hedge against the aforementioned uncertainty. This paper focuses on key smart technologies by providing a critical literature review and presenting the latest mathematical modelling that describes their operation.

30 January 2018 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
Spyros GiannelosSpyros Giannelos
Spyros Giannelos
IKIoannis Konstantelos
Ioannis Konstantelos
GSGoran Strbac
Goran Strbac
Uncertainty in power system planning problems can be categorized into two types: exogenous and endogenous (or decision-dependent) uncertainty. In the latter case, uncertainty resolution depends on a choice (the value of some decision variables), as opposed to the former case in which the uncertainty resolves automatically with the passage of time. In this paper, a novel stochastic multistage planning model is proposed that considers endogenous uncertainty around consumer participation in demand-side response (DSR) schemes. This uncertainty can resolve following DSR deployment in two possible ways: locally (at a single bus) and globally (across the entire system). The original formulation is decomposed with the use of Benders decomposition to improve computational performance. Two versions of Benders decomposition are applied: the classic version involving sequential implementation of all operational subproblems and a novel version, specific to problems with endogenous uncertainty, which allows for the parallel execution of only those operational subproblems that are guaranteed to have a unique contribution to the solution. Case studies on 11-bus and 123-bus systems illustrate the process of endogenous uncertainty resolution and underline the strategic importance of deploying DSR ahead of time.

11 July 2016 in IEEE Transactions on Power Systems
Verified
Journal Article
Open access
IKIoannis Konstantelos
Ioannis Konstantelos
Spyros GiannelosSpyros Giannelos
Spyros Giannelos
GSGoran Strbac
Goran Strbac
The increasing penetration of renewable distributed generation (DG) sources in distribution networks can lead to violations of network constraints. Thus, significant network reinforcements may be required to ensure that DG output is not constrained. However, the uncertainty around the magnitude, location, and timing of future DG capacity renders planners unable to take fully informed decisions and integrate DG at a minimum cost. In this paper, we propose a novel stochastic planning model that considers investment in conventional assets as well as smart grid assets such as demand-side response, coordinated voltage control and soft open points. The model also considers the possibility of active power generation curtailment of the DG units. A node-variable formulation has been adopted to relieve the substantial computational burden of the resulting mixed integer nonlinear programming problem. A case study shows that smart technologies can possess significant strategic value due to their inherent flexibility in dealing with different system evolution trajectories. This latent benefit remains undetected under traditional deterministic planning approaches which may hinder the transition to the smart grid.

3 June 2025 in Electric Power Systems Research
Verified
Journal Article
Open access
Spyros GiannelosSpyros Giannelos
Spyros Giannelos
IKIoannis Konstantelos
Ioannis Konstantelos
XZXi Zhang
Xi Zhang
GSGoran Strbac
Goran Strbac