Samir Khan

Dr. Samir Khan


Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2018 in Mechanical Systems and Signal Processing
Verified
Journal Article
Closed access
SKSamir Khan
Samir Khan
TYTakehisa Yairi
Takehisa Yairi

1 January 2020 in Annual Reviews in Control
Verified
Journal Article
Closed access
SKSamir Khan
Samir Khan
MFMichael Farnsworth
Michael Farnsworth
RMRichard McWilliam
Richard McWilliam
JEJohn Erkoyuncu
John Erkoyuncu

1 October 2019 in Applied Soft Computing
Verified
Journal Article
Closed access
SKSamir Khan
Samir Khan
CLChun Fui Liew
Chun Fui Liew
TYTakehisa Yairi
Takehisa Yairi
RMRichard McWilliam
Richard McWilliam

1 March 2014 in Reliability Engineering & System Safety
Verified
Journal Article
Closed access
SKSamir Khan
Samir Khan
PPPaul Phillips
Paul Phillips
IJIan Jennions
Ian Jennions
CHChris Hockley
Chris Hockley

1 December 2017 in Reliability Engineering & System Safety
Verified
Journal Article
Open access
John ErkoyuncuJohn Erkoyuncu
John Erkoyuncu
SKSamir Khan
Samir Khan
AEAlexandre López Eiroa
Alexandre López Eiroa
NBNigel Butler
Nigel Butler
KRKeith Rushton
Keith Rushton
SBSimon Brocklebank
Simon Brocklebank
Characterising maintenance costs has always been challenging due to a lack of accurate prior cost data and the uncertainties around equipment usage and reliability. Since preventive maintenance does not completely prevent corrective repairs in demanding environments, any unscheduled maintenance can have a large impact on the overall maintenance costs. This introduces the requirement to set up support contracts with minimum baseline solutions that warrant the target demand within certain costs and risks. This article investigates a process that has been developed to estimate performance based support contract costs attributed to corrective maintenance. These can play a dominant role in the through-life support of high values assets. The case context for the paper is the UK Ministry of Defence. The developed approach allows benchmarking support contract solutions, and enabling efficient planning decisions. Emphasis is placed on learning from feedback, testing and validating current methodologies for estimating corrective maintenance costs and availability at the Equipment Type level. These are interacting sub-equipment's that have unique availability requirements and hence have a much larger impact on the capital maintenance expenditure. The presented case studies demonstrate the applicability of the approach towards adequate savings and improved availability estimates

1 March 2014 in Reliability Engineering & System Safety
Verified
Journal Article
Closed access
SKSamir Khan
Samir Khan
PPPaul Phillips
Paul Phillips
CHChris Hockley
Chris Hockley
IJIan Jennions
Ian Jennions