Xing Su

Dr. Xing Su


Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
Ahsan NawazAhsan Nawaz
Ahsan Nawaz
XSXing Su
Xing Su
Qaiser Mohi Ud DinQaiser Mohi Ud Din
Qaiser Mohi Ud Din
MKMuhammad Irslan Khalid
Muhammad Irslan Khalid
MQM Qammar
M Qammar
DSDr. SYYED ADNAN RAHEEL SHAH
Dr. SYYED ADNAN RAHEEL SHAH
Urbanization is playing a key role in big cities of developing countries, which, in effect, is increasing the population. This study takes care of the mega infrastructure project (Orange Line Metro Train (OLMT)) to explore and identify the H&S (Health and Safety) factors that affect the local residents and the main key stakeholders working on the project. A Sequential Mixed-Method approach of the OLMT-project includes qualitative and quantitative methods were adopted. The data have been collected from the targeted population working on the OLMT-project through a questionnaire. The main key finding of the study indicates that poor planning and a lack of communication between the public and government led to frustration. The most significant factors that identified in the study were unsafe to work practice, project scope constraints, lack in technical and material support, unsafe/bad condition, health/environment degradation, declination and loss of resources and time, no proper emergency system, and negligence in adopting safety rules and laws. The study also revealed that the consensus should also be noticed between the key stakeholders (e.g., contractors, clients, safety officials, academia) in the second round of the Delphi survey of the project. The study findings will help the key stakeholders to prioritize their energies towards attaining zero levels of inadequate health and safety practices in infrastructure projects. The study outcomes can also be generalized for the other developing countries having a similar work scenario.

1 October 2014 in Advanced Engineering Informatics
Verified
Journal Article
Closed access
HCHubo Cai
Hubo Cai
AAAbdul Rahman Andoh
Abdul Rahman Andoh
XSXing Su
Xing Su
SLShuai Li
Shuai Li

22 March 2024 in Computers in Industry
Verified
Journal Article
Closed access
SWSaika Wong
Saika Wong
CZChunmo Zheng
Chunmo Zheng
XSXing Su
Xing Su
YTYinqiu Tang
Yinqiu Tang

27 January 2021 in Complexity
Verified
Journal Article
Open access
PDF file
Ahsan NawazAhsan Nawaz
Ahsan Nawaz
XSXing Su
Xing Su
INIbrahim Muhammad Nasir
Ibrahim Muhammad Nasir
The construction projects in Pakistan have inherent problems of erroneous planning and schedule development. This dilemma has led to the failure of the majority of construction projects in Pakistan. Earlier researches have tried to curtail the increasing spectrum of inaccurate planning and schedule development. But not many research studies have shed light on the major factor of 2D CAD drawings interpretation problems, which are playing a key role in defective planning and scheduling. Moreover, the role of BIM, i.e., Building Information Modeling with respect to efficient planning, has not been also discussed in detail. This study has concluded a positive impact of BIM on effective planning and scheduling in the construction industry of Pakistan. About 210 responses were obtained from experienced construction professionals of Pakistan and tested via regression analysis in order to validate this argument. It has been analyzed that 2D CAD drawings are now getting primitive and 3D technology BIM is taking its place. BIM is an efficient tool for planning and scheduling. With the start of CPEC and Multi‐Billion Dollar investment on infrastructure, construction industry of Pakistan needs to uplift its existing standard in order to meet with international requirements. For this purpose, BIM has been recommended. It will not only assist in attaining flawless planning but will also increase the success rate of CPEC projects in Pakistan.

10 December 2020 in Frontiers in Public Health
Verified
Journal Article
Open access
PDF file
Ahsan NawazAhsan Nawaz
Ahsan Nawaz
XSXing Su
Xing Su
MBMuhammad Qasim Barkat
Muhammad Qasim Barkat
SASana Asghar
Sana Asghar
AAAli Asad
Ali Asad
SSSyyed Adnan Raheel Shah
Syyed Adnan Raheel Shah
The coronavirus disease (COVID-19) was first reported in China (Wuhan) at the end of 2019. It has rapidly spread over 216 countries, including the USA, UK, Europe, Russia, and many Asian countries. It has affected more than 4.5 million people, and around 0.3 million deaths have been reported globally. Many preventive measures have been adopted worldwide to mitigate its spread. The government of Pakistan has also taken many preventive measures to combat the COVID-19 outbreak, such as rapid response by governance, continuous monitoring of the pandemic spread in the affected areas, and integration of resources from multiple sectors, including health, education, defense, and media. According to global statistics, the number of COVID-19 cases in the country remained remarkably lower than the expected number for the first 169 days, as compared to other countries. A total of 286,674 confirmed cases, including 16,475 active, 6,139 deaths, and 264,060 (92%) recoveries were reported. The study finds that strict adherence to national policies, effective governance, and unity at the national level resulted in better outcomes. Hence, the preventive measures, rapid responses, and strategies adopted for combating the challenges could be adopted as a learning tool for other countries having similar work environments and financial constraints. This paper can help and guide governance/public actions in response to the possible rebound of coronavirus this fall/winter.

25 February 2022 in Frontiers in Environmental Science
Verified
Journal Article
Open access
ANAhsan Nawaz
Ahsan Nawaz
JCJian Chen
Jian Chen
XSXing Su
Xing Su
HHHafiz Muhammad Zahid Hassan
Hafiz Muhammad Zahid Hassan
The Construction and demolition (C and D) waste generation is a critical issue for the construction industry, which negatively affects the economy, environment, and society. This study estimates the penalty-cost based on the produced C&D wastes in steel and concrete skeleton projects. Field survey and the BOQ data were collected from five concrete and four steel skeleton projects. The difference of materials used and wastes generated between concrete and steel skeleton projects were evaluated statistically (ANOVA and Welch and Brown-Forsythe). A financial analysis was implemented for estimating the penalty cost. The study outcomes demonstrate that the amount of waste that construction managers estimated is significantly lower than the actual amount generated. Furthermore, 0.055% of the total project cost of a penalty was estimated based on the waste produced at construction sites. In the end, the estimated penalty was validated by comparing it with the six recent completed projects. The penalty calculated in this study could save the project cost and reduce the C&D waste. As a result, imposing the estimated cost as a penalty would force construction managers to think thoroughly about the generated C&D waste problems. This study also has a novelty and will add to the body of knowledge by using penalty-cost quantification model to save project-cost of construction material-based-waste, and it can be further explored by adopting more quality data and engaging different construction materials.