Yu Hu

Yu Hu


Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
10 January 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
TYTao Yin
Tao Yin
QLQingbin Li
Qingbin Li
YHYu Hu
Yu Hu
SYSanda Yu
Sanda Yu
GLGuohe Liang
Guohe Liang
General studies examining reservoir bank deformation during its impoundment primarily consider the coupling effect between the seepage field and the stress field, but thermal field variation in the bedrock and its effect are rarely considered. In this paper, a case study concerning a 285.5 m high arch dam project, where a valley narrowing deformation occurs after the initial impoundment, is implemented. An analysis of in situ measurement is given to interpret the causes of the unique hydro-thermal phenomenon of the project. Possible reasons for the valley narrowing deformation pattern are discussed. A numerical model based on the thermo-hydro-mechanical (THM) coupling theory of porous medium is used to calculate the evolution processes of the thermal, seepage, and stress fields of the area after impoundment of the reservoir. The simulated deformation trend and pattern of the river valley are consistent with the monitoring data. The results demonstrate that water infiltration after impounding cools the bedrock and the temperature decrease makes the bedrock contract, which induces the narrowing deformation of the valley. Factor analysis of the hydrothermal field shows that temperature variation is the main cause of long-term deformation. Thus, it shall be considered as a key factor in terms of structural safety assessment. Furthermore, sensitivity analysis of the hydraulic conductivities of rock strata suggests that future development of the deformation can be eased off if the anti-seepage method is adopted on the bedrock.

28 June 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
GAGuo An
Guo An
NYNing Yang
Ning Yang
QLQingbin Li
Qingbin Li
YHYu Hu
Yu Hu
HYHuiting Yang
Huiting Yang
According to the practice of temperature control in dam concrete, within a few days after a concrete block is poured, the temperature at the core of the concrete rises rapidly. The maximum temperature may still exceed the standard even under a relatively perfect post-cooling system, which is mostly caused by failure to quickly and correctly judge the development of the early-age temperature. This study investigates concrete temperature at an early age via in situ monitoring data collected from Baihetan arch dam and Wudongde arch dam. A simplified algorithm of temperature prediction is formed, which only considers the heat released by cement hydration and the cooling effect of cooling pipes. The influence of a cooling pipe on the measuring point of the thermometer is investigated, and a simple empirical formula to calculate the cooling effect is obtained. An equation for the rate of hydration temperature rise is achieved by combining measured data and the formula used to calculate the cooling effect. Furthermore, through the explorations of the related data, it is determined that the cement hydration ratio of the two dams is quite low during concreting. On the basis of the data collected from the field, the method to predict temperature proposed in this study is tested and proven.

9 July 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
ZMZhengxiang Mi
Zhengxiang Mi
QLQingbin Li
Qingbin Li
YHYu Hu
Yu Hu
CLChunfeng Liu
Chunfeng Liu
YQYu Qiao
Yu Qiao
This paper investigated the fracture properties of concrete in dry environments with different curing temperatures (5, 20, 40, and 60 °C). For each curing condition, the key fracture parameters of concrete were tested using wedge splitting specimens at five different ages (3, 7, 14, 28, and 60 d). The results show that in dry environments, the effective fracture toughness and fracture energy of concrete exposed to elevated temperatures increased at a relatively high growth rate at an early age. Nevertheless, the growth speed of effective fracture toughness and fracture energy decreased more quickly at elevated temperatures in the later stages. As a result, the concrete cured at higher temperature exhibited lower ultimate values of fracture parameters, and vice-versa. Namely, a temperature crossover effect was found in the effective fracture toughness and fracture energy of concrete under dry environments. Considering the early growth rate and ultimate values of fracture parameters, the optimum temperature suitable for concrete fracture properties development under dry condition was around 40 °C.

1 January 2014 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
ZZZheng Zuo
Zheng Zuo
YHYu Hu
Yu Hu
QLQingbin Li
Qingbin Li
LZLiyuan Zhang
Liyuan Zhang
Embedded cool‐pipes are very important for massive concrete because their cooling effect can effectively avoid thermal cracks. In this study, a data mining approach to analyzing the thermal performance of cool‐pipes via in situ monitoring is proposed. Delicate monitoring program is applied in a high arch dam project that provides a good and mass data source. The factors and relations related to the thermal performance of cool‐pipes are obtained in a built theory thermal model. The supporting vector machine (SVM) technology is applied to mine the data. The thermal performances of iron pipes and high‐density polyethylene (HDPE) pipes are compared. The data mining result shows that iron pipe has a better heat removal performance when flow rate is lower than 50 L/min. It has revealed that a turning flow rate exists for iron pipe which is 80 L/min. The prediction and classification results obtained from the data mining model agree well with the monitored data, which illustrates the validness of the approach.

27 April 2024 in Case Studies in Construction Materials
Verified
Journal Article
Open access
XGXiaofeng Gao
Xiaofeng Gao
MJMingli Ji
Mingli Ji
YHYu Hu
Yu Hu
WRWeidong Ruan
Weidong Ruan
MZMengxia Zhou
Mengxia Zhou
ZLZhihong Liu
Zhihong Liu

2 May 2022 in Lithosphere
Verified
Journal Article
Open access
PDF file
TYTao Yin
Tao Yin
QLQingbin Li
Qingbin Li
YHYu Hu
Yu Hu
LGLi gan
Li gan
SYSanda Yu
Sanda Yu
The monitoring and analysis of the temperature field in the reservoir area is gaining importance as it provides insights regarding structural safety and environmental impact. Most studies focus on earthen dams and the seasonal fluctuation of the thermal field induced by the ambient temperature. Few studies analyse the long-term trend of the bedrock temperature after high-arch dam impoundment as the involved geological elements are likely to be unexpected and unknown. In this paper, a unique geothermal evolution model in the downstream bedrock of a 285.5 m high-arch dam is reported based on continuous field observations during the past nine years, which cannot be explained by available hydrogeological data. To clarify the phenomenon, a research framework that comprises field measurements, machine learning interpretation, and hydrothermal coupling simulation is proposed. Borehole surveys and water chemistry analyses are performed to gather more data from critical areas. The proposed machine learning pipelines attempt to interpret the field test data. These are integrated with a double-loop grid-search process and can achieve hyperparameter searching and model evaluation simultaneously. It proves to be robust to local minima and more applicable to groundwater source discrimination when compared to other models. The contribution of the newly discovered features is further discussed through comparative and sensitivity analysis based on the hydrothermal coupling theory. With the proposed hybrid analysis framework, the shallow buried limestones and the confined hot groundwater have been identified as the causes of the unique phenomenon. These factors should be of concern to researchers facing similar situation in the future.