Chen Wang

Prof. Dr. Chen Wang

Huaqiao University
orcid

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2020 in Automation in Construction
Verified
Journal Article
Closed access
SSSara Shirowzhan
Sara Shirowzhan
Samad SepasgozarSamad Sepasgozar
Samad Sepasgozar
DEDavid J. Edwards
David J. Edwards
Heng LiHeng Li
Heng Li
Chen WangChen Wang
Chen Wang

1 October 2017 in Advanced Engineering Informatics
Verified
Journal Article
Closed access
XYXuzhong Yan
Xuzhong Yan
Heng LiHeng Li
Heng Li
Chen WangChen Wang
Chen Wang
JSJoonOh Seo
JoonOh Seo
HZHong Zhang
Hong Zhang
HWHongwei Wang
Hongwei Wang

1 October 2017 in International Journal of Project Management
Verified
Journal Article
Closed access
Jeffrey YapJeffrey Yap
Jeffrey Yap
HAHamzah Abdul-Rahman
Hamzah Abdul-Rahman
Chen WangChen Wang
Chen Wang

1 January 2016 in Journal of Cleaner Production
Verified
Journal Article
Closed access
LWLincoln C. Wood
Lincoln C. Wood
Chen WangChen Wang
Chen Wang
HAHamzah Abdul-Rahman
Hamzah Abdul-Rahman
NANoor Syakirin Jamal Abdul-Nasir
Noor Syakirin Jamal Abdul-Nasir

31 August 2021 in Computer Applications in Engineering Education
Verified
Journal Article
Closed access
PDF file
Chen WangChen Wang
Chen Wang
YTYutong Tang
Yutong Tang
Mukhtar A. KassemMukhtar A. Kassem
Mukhtar A. Kassem
HLHeng Li
Heng Li
BHBingqing Hua
Bingqing Hua

1 May 2018 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
Jeffrey YapJeffrey Yap
Jeffrey Yap
HAHamzah Abdul-Rahman
Hamzah Abdul-Rahman
Chen WangChen Wang
Chen Wang
Failure to communicate effectively and poor project knowledge continue to plague the construction industry, particularly concerning delay management and cost control. This paper aims to empirically examine the influence of project communication management and project learning as preventive measures to mitigate time-cost overruns. Based on a comprehensive literature review, a conceptual framework was developed. A two-stage data collection was used, namely semistructured interviews and a broad questionnaire survey. The qualitative data was analyzed by content analysis of critical incidents. Partial least-squared based structural equation modeling (PLS-SEM) analyses statistically tested the model hypotheses. The results suggest that project communications and project learning contribute positively to time-cost performance of construction projects. Effective communication tools, critical learning situations, and essential reusable project knowledge are identified. Collective sharing of experiences facilitates personal development and enables effective project learning. A triangulated approach was adopted to conceptualize the control loop-process emphasis on networking and communication, collaborative learning, experience accumulation, and expert judgment as critical elements of continuous learning. As such, this study advances the current knowledge of exploiting project communication management and project learning in mitigating time-cost overruns in construction.