Paweł Łopata

Mr. Paweł Łopata

orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 July 2020 in Energies
Verified
Journal Article
Open access
PDF file
RWRafał Wiśniowski
Rafał Wiśniowski
PŁPaweł Łopata
Paweł Łopata
GOGrzegorz Orłowicz
Grzegorz Orłowicz
Advances in the field of material engineering, computerization, automation, and equipment miniaturization enable modernization of the existing technologies and development of new solutions for construction, inspection, and renovation of underground pipelines. Underground pipe installations are used in the energy sector, gas industry, telecommunications, water and sewage transport, heating, chemical industry, and environmental engineering. In order to build new pipeline networks, dig and no-dig techniques are used. Horizontal Directional Drilling (HDD) is one of the most popular trenchless technologies. The effectiveness of HDD technology application is mostly determined by its properly designed trajectory. Drilling failures and complications, which often accompany the application of the HDD technology, result from poor design of the well path in relation to the existing geological and drilling conditions. The article presented two concepts of Horizontal Directional Drilling well path trajectory design: Classic sectional, which is a combination of straight and curvilinear sections, and a single-section chain curve trajectory (catenary). Taking into account the advantages and disadvantages of the catenary trajectory relative to the sectional trajectory, the author’s solution was presented, which was the implementation of the sectional trajectory with a maximum shape similarity to the catenary trajectory. The new approach allowed us to take advantage of a chain curve trajectory and was easier to implement using the available technology. The least squares method, based on deviations from a catenary trajectory, was set as the matching criterion. The process of searching for a trajectory, being a combination of straight and curvilinear sections as similar as possible to a catenary-type trajectory, was carried out using two methodologies: State space search and a genetic algorithm. The article shows the pros and cons of both optimization methodologies. Taking into account the technical and technological limitations of HDD drilling devices, a new approach was proposed, combining the methodology of state space search with the genetic algorithm. A calculation example showed the application of the proposed methodology in an engineering design process.

19 June 2021 in Energies
Verified
Journal Article
Open access
PDF file
Marcin KremieniewskiMarcin Kremieniewski
Marcin Kremieniewski
RWRafał Wiśniowski
Rafał Wiśniowski
SSStanisław Antoni Stryczek
Stanisław Antoni Stryczek
PŁPaweł Łopata
Paweł Łopata
The tightness of the casing-rock formation interface is one of the most important elements of drilling and cementing jobs. In the absence of the required tightness, there is a risk of gas migration directly to the ground, groundwater or atmosphere. In order to eliminate this type of uncontrollable and unfavorable gas flows, the casing column is sealed with cement slurry in the annular space or beyond casing. Cement slurry displaces mud present in the annular space, although the mud cake cannot be completely removed, which is required for obtaining proper binding of cement slurry with the casing surface and the surface of the drilled formation. Therefore, it is important to prepare the well and remove the mud cake from the annular space with spacer fluid. An occasional lack of wellbore tightness requires continuous improvement of the cementing technology. Accordingly, analyses are conducted on mud cake removal with modified or new spacer fluids. Properly designed fluid should efficiently clean the surface of the casing and of the rock mass. One of the basic measurements is the analysis of the efficiency of mud cake removal from the surface of a rotational viscometer. The efficiency of traditional and newly designed fluids for mud cake removal from the casing surface with new and traditional agents has been compared further in this paper. The methodology of mud cake removal with the use of a rotational viscometer was also presented. Tests were performed for various concentrations of agents already used for spacer fluids and for a group of new agents. The efficiency of annular space cleaning was determined on the basis of a comparison with the results obtained for the reference sample, i.e., water which was used for mud cake removal from the rotor surface. The analysis of the results of experiments created bases for the comparison of the efficiency of the analyzed spacer fluids and finding the most suitable ones for mud cake removal from casing columns.

2 March 2020 in Energies
Verified
Journal Article
Open access
PDF file
RWRafał Wiśniowski
Rafał Wiśniowski
KSKrzysztof Skrzypaszek
Krzysztof Skrzypaszek
PŁPaweł Łopata
Paweł Łopata
GOGrzegorz Orłowicz
Grzegorz Orłowicz
An increase in demand for energy natural resources has stimulated the development of gas pipeline networks in Europe, as well as globally. Also, in Poland in recent years there has been a significant increase in natural gas consumption. Therefore, it is necessary to build new pipelines networks using dig and no–dig techniques. Horizontal Directional Drilling is one of the most popular trenchless technologies. The aim of this article is to present a new approach in the design of HDD trajectories in two–dimensional space (2D). A review of the trajectories used so far has been provided, offering calculation algorithms to determine their well path. Then, the original catenary method is proposed, taking into account natural deflection of casing pipes. Applicable formulas and computational algorithms have been given, together with a computational example which enables comparison of the classical design methodology with the new one. According to the authors, due to natural stress distribution, the catenary method allows the use of smaller pulling forces during installation and ensures longer pipeline life. Therefore, it should be used in industrial practice as an alternative to current designing methods.