Gabriele Pannocchia

Dr. Gabriele Pannocchia

Department of Civil and Industrial Engineering-Chemical Engineering Section, University of Pisa, Largo L. Lazzarino, 2, 56126 Pisa, Italy

Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2019 in Journal of Process Control
Verified
Journal Article
Closed access
Marco VaccariMarco Vaccari
Marco Vaccari
GMG.M. Mancuso
G.M. Mancuso
JRJ. Riccardi
J. Riccardi
MCM. Cantù
M. Cantù
Gabriele PannocchiaGabriele Pannocchia
Gabriele Pannocchia

13 May 2019 in Industrial & Engineering Chemistry Research
Verified
Journal Article
Closed access
TFTimm Faulwasser
Timm Faulwasser
Gabriele PannocchiaGabriele Pannocchia
Gabriele Pannocchia

29 December 2016 in Processes
Verified
Journal Article
Open access
PDF file
Marco VaccariMarco Vaccari
Marco Vaccari
Gabriele PannocchiaGabriele Pannocchia
Gabriele Pannocchia
We address in the paper the problem of designing an economic model predictive control (EMPC) algorithm that asymptotically achieves the optimal performance despite the presence of plant-model mismatch. To motivate the problem, we present an example of a continuous stirred tank reactor in which available EMPC and tracking model predictive control (MPC) algorithms do not reach the optimal steady state operation. We propose to use an offset-free disturbance model and to modify the target optimization problem with a correction term that is iteratively computed to enforce the necessary conditions of optimality in the presence of plant-model mismatch. Then, we show how the proposed formulation behaves on the motivating example, highlighting the role of the stage cost function used in the finite horizon MPC problem.

20 May 2021 in Industrial & Engineering Chemistry Research
Verified
Journal Article
Open access
Marco VaccariMarco Vaccari
Marco Vaccari
Riccardo Bacci di CapaciRiccardo Bacci di Capaci
Riccardo Bacci di Capaci
EBElisabetta Brunazzi
Elisabetta Brunazzi
LTLeonardo Tognotti
Leonardo Tognotti
PPPaolo Pierno
Paolo Pierno
Gabriele PannocchiaGabriele Pannocchia
Gabriele Pannocchia
Updating industrial facilities to increase the level of automation and digitalization to match Industry 4.0 paradigms has become essential for many companies. Following such a trend, this paper presents a real-time optimization algorithm that plays a central role in a larger project framework devoted to highly interconnecting different network components of an Italian chemical industrial site. The proposed methodology aims at best managing the production rates of various products to fulfill a sales plan organized to satisfy numerous client requests. The considered model takes into account both batch and continuous processes as well as salable and non-storable products. The algorithm structure relies on the use of a non-linear optimization scheme and on the concepts of batch scheduling. Different features of the proposed methodology have been tested on real plant data, showing how the predicted forecast always improved the initial operation plan by considering both aspects of feasibility and economic nature. The use of the proposed algorithm assures the basis for fully integrating the control systems and the selling department of the facility in a more interactive and responsive manner.

11 April 2019 in Optimal Control Applications and Methods
Verified
Journal Article
Closed access
PDF file
MRMatteo Razzanelli
Matteo Razzanelli
ECEmanuele Crisostomi
Emanuele Crisostomi
LPLUCIA PALLOTTINO
LUCIA PALLOTTINO
Gabriele PannocchiaGabriele Pannocchia
Gabriele Pannocchia

20 May 2021 in Processes
Verified
Journal Article
Open access
PDF file
Marco VaccariMarco Vaccari
Marco Vaccari
Dominique BonvinDominique Bonvin
Dominique Bonvin
FPFederico pelagagge
Federico pelagagge
Gabriele PannocchiaGabriele Pannocchia
Gabriele Pannocchia
Various offset-free economic model predictive control schemes that include a disturbance model and the modifier-adaptation principle have been proposed in recent years. These schemes are able to reach plant optimality asymptotically even in the presence of plant–model mismatch. All schemes are affected by a major issue that is common to all modifier-adaptation formulations, namely, plant optimality (note that convergence per se does not require perfect plant gradients) requires perfect knowledge of static plant gradients, which is a piece of information not known in most practical applications. To address this issue, we present two gradient-estimation techniques, one based on Broyden’s update and the other one on linear regression. We apply these techniques for the estimation of either the plant gradients or the modifiers directly. The resulting economic MPC schemes are tested in a simulation and compared on two benchmark examples of different complexity with respect to both convergence speed and robustness to measurement noise.