Yucheng Huang

Prof. Yucheng Huang

orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
3 March 2020 in Processes
Verified
Journal Article
Open access
PDF file
YWYumin Wang
Yumin Wang
YHYucheng Huang
Yucheng Huang
YHYuxin Hao
Yuxin Hao
From the perspective of resource recovery and environmental protection, coal gangue-fly ash cemented backfill coal mining has become an important direction for the green development of coal mines in recent years. Analysis of the rheological parameters of backfill slurry is the basic principle to design a backfill pipeline system. Coal gangue-fly ash backfill slurry has a mass concentration of 76% to 79% and a maximum particle size 20 mm. Therefore, it is difficult to use conventional rheometers for experimental analyses of the rheological parameters of such fluids. We developed a rheometer for high-concentration coal gangue backfill slurry (HCGS rheometer) based on the coal gangue-fly ash backfill practice of Gonggeying Mine, and analyzed the rheological properties of the backfill slurry. The experimental results showed that the Reynolds number of the coal gangue-fly ash backfill slurry was much smaller than the critical Reynolds number, indicating the flow state in the pipeline was laminar. Based on these results, it may be more appropriate to control the mass concentration to 77% to 78%, and the suggested fly ash content is 25%. This work provides a scientific basis to optimize the backfill parameters and pipeline system in coal mines.

8 March 2025 in Processes
Verified
Journal Article
Open access
PDF file
XDXiaobo Duan
Xiaobo Duan
YHYucheng Huang
Yucheng Huang
YHYuxin Hao
Yuxin Hao
LZLiao Zhang
Liao Zhang
Coal mine gangue cementation filling technology has increasingly become an effective and major means of dealing with “coal mining under buildings, railways, and bodies of water” and other complex hard-to-mine coal seams; but also, an important part of a large number of treatments of coal gangue stockpiled on the ground is to realize the green mining of coal mines. Coal mine cement filling often contains gangue particles with particle sizes larger than 15 mm; however, the viscometer and rheometer currently used at home and abroad are unable to accurately measure the rheological parameters of the slurry containing large-particle-sized gangue. In order to accurately measure the rheological parameters of slurry containing large-sized gangue particles combined with the site filling materials, the torque values obtained on the mixing blades at different speeds were generated by the combined action of the slurry between the blade side edge and the mixing drum wall, as well as the slurry between the blade lower edge and the mixing drum bottom. A new type of gangue slurry rheometer was developed. The new type of gangue slurry rheometer mainly included components such as the power system, sensing system, mechanical system, and other auxiliary units. Finally, using Fluent software ANSYS2023 to numerically simulate the fluidity of the slurry under the same conditions, the results obtained after the calculation and the test results showed that the error was within a reasonable range, indicating the correctness of the test principles of the new gangue slurry rheometer and the effectiveness of the instrument. This research offers new insights for accurately measuring the rheological parameters of particles with large sizes.

19 November 2025 in Scientific Reports
Verified
Journal Article
Open access
PDF file
CWChengshuai Wang
Chengshuai Wang
YHYucheng Huang
Yucheng Huang
ZZZhimin Zhang
Zhimin Zhang
LSLebin Su
Lebin Su
HLHongliang Lu
Hongliang Lu
YHYuxin Hao
Yuxin Hao
To address the challenge of instability control in the collaborative bearing structure of stope roof and barrier pillars in short-wall interval filling mining, a combined approach of theoretical analysis, numerical simulation, and field application was adopted. A mechanical model of the roof–pillars collaborative bearing structure was established, and the analytical solutions of roof bending stress were derived. The effects of mining mechanics and structural parameters on the stability of the roof–pillars structure were further analyzed, and the optimal branch roadway width, number of barrier pillars, and elastic modulus of the backfilling body were determined. The results were validated through numerical simulation and field testing. The results indicate that: ① The analytical solution of the roof deflection equation shows significant variation in the maximum bending stress distribution along the branch roadway roof, with the peak stress occurring at the branch roadway roof, which is identified as the most vulnerable area for roof instability. ② Orthogonal tests and variance analysis reveal that the elastic modulus of barrier pillars exerts the most significant influence on roof stability (variance 120.3), followed by branch roadway width (56.5) and the interval number of barrier pillars (19.8). The optimized parameter combination includes a branch roadway width of 5 m, two barrier pillars (10 m in width), and a backfilling body with an elastic modulus of 1.2 GPa. Under these conditions, the mean maximum roof bending stress is 14.8 MPa, with a range of 22.4 MPa, achieving both mechanical equilibrium and economic efficiency. ③ Numerical simulations show that during three mining cycles, the stress distribution of barrier pillars gradually transitions from a “double-peak” to a “single-peak” pattern. The maximum vertical stress increases from 15 MPa to 24.65 MPa; however, the barrier pillars remain stable, the development of the surrounding rock plastic zone is controllable, and the roof deformation (163.5 mm) is within the safety threshold. ④ In industrial applications, field measurements at the 2-106 filling working face show that the maximum deformation of the roof and floor is 54 mm, and roof separation is less than 24 mm, thereby validating the effectiveness of the optimized parameters. This study reveals the collaborative bearing mechanism of the roof–pillars system under the condition of two unfilled branch roadways, proposes optimization criteria for structural parameters, and provides theoretical support and engineering reference for the safe application of short-wall interval filling mining technology.