Jaroslaw Konior

Prof. Dr. Jaroslaw Konior

Department of Building Engineering, Faculty of Civil Engineering, Wroclaw University of Science and Technology, 50-370 Wrocław, Poland
orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 March 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Jaroslaw KoniorJaroslaw Konior
Jaroslaw Konior
Mariusz SzóstakMariusz Szóstak
Mariusz Szóstak
One of the key tasks of an investor and a contractor at the stage of planning and implementing construction works is to measure the progress of execution with regard to the planned deadlines and costs. During the execution of construction works, the actual progress of the works may differ significantly from the initial plan, and it is unlikely that the construction project will be implemented entirely according to the planned work and expenditure schedule. In order to monitor the process of deviations of the deadline and the budget of the investment task, several rudimentary methods of planning—as well as the cyclical control of the progress of construction projects—are used. An effective tool for measuring the utilization of the financial outlays of a construction project is the presentation of the planned financial flows on a timeline using a cumulative cost chart, the representation of which is the S-curve. The purpose of this paper is to analyze the course of an sample construction project comparing the planned costs of the scheduled works with the actual costs of the performed works, as well as identifying the reasons leading to the failure to meet the planned deadlines and budget of the project implementation. As part of the research conducted at a construction site of a hotel facility, the authors of this paper analyzed each of the 20-month effects of financial expenditures on construction works that were developed and processed by the Bank Investment Supervision (BIS) over a period of three years (between 2017 and 2019). Based on these results, charts and tables of the scheduled and actual cumulative costs of the completed construction project were prepared, the careful analysis of which enables interesting conclusions to be drawn.

17 March 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
Jaroslaw KoniorJaroslaw Konior
Jaroslaw Konior
Mariusz SzóstakMariusz Szóstak
Mariusz Szóstak
Appropriate planning and effective monitoring of the execution of construction projects is important with regard to their successful sustainment of implementation. Time and cost are key elements that determine the success or failure of construction projects. The obtaining of a rational S-curve course before the start of a construction project that reflects reality is important for all the participants involved in implementing an investment task. The article proposes an original methodology for planning the course of the cumulative cost curve in construction projects. It uses a method of shaping the S-curve, which is well-known in both literature and practical approaches. On the basis of the authors’ own research carried out in a homogeneous research group of hotel facilities, the areas of the curve for the correct planning of costs in construction projects were designated, which determine the boundaries of the predicted costs accumulated over time. The data for the development of the authors’ research methodology is the result of the authors’ own experience and professional work. The authors carried out Bank Investment Supervision in the years 2006–2019 on behalf of the banks that grant investment loans for non-public contracts. Knowing the total cost and duration of the planned construction project, which were determined on the basis of project documentation, cost estimates, and also their own database regarding planned and completed deadlines and budgets of similar investments, 6th degree polynomials of the real costs of the construction works were determined. This approach enabled the correct planning of costs over time and the determination of planned monthly amounts of construction works to be executed.

23 September 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Jaroslaw KoniorJaroslaw Konior
Jaroslaw Konior
Marek SawickiMarek Sawicki
Marek Sawicki
Mariusz SzóstakMariusz Szóstak
Mariusz Szóstak
Defining the basic determinants of the level of reliability with regards to the use of residential buildings and determining the function of the intensity of their characteristic defects are important issues concerning renovation strategy. The distribution of the exploitation time of residential buildings, the function of their reliability, and the distribution of the defect intensity of examined buildings are interdependent terms. Therefore, it can be assumed that the defect intensity of an object will be higher with an increase in its exploitation time. However, it is neither an increase reflecting the length of the building’s service life nor the value directly proportional to its age. The article presents a model and method of testing the defects and reliability of a representative group of traditional downtown residential buildings, which were erected in Wroclaw, Poland at the turn of the 19th and 20th centuries. A basic conclusion was drawn regarding the mechanism of damage of residential buildings: for the period of using the facility, in which the time of correct operation until failure has an exponential distribution, the average remaining time of failure-free operation is unchanged at any time. It was confirmed that the tested residential buildings, after a certain period of failure-free operation, fulfil their functions, just like new buildings. The optimal moment of renovation occurs after the end of the second period of operation, before the period of rapid wear. The study of the course of the damage intensity function over time reflects the wear process of a residential building in a representative sample of downtown residential buildings that were erected using traditional methods. Defining the average duration of the correct failure-free operation of an object by the reliability function, which determines the probability with which the correct operation time of an object will be longer than its age, has a practical application in the exploitation of a residential building and its components.

1 September 2015 in Archives of Civil Engineering
Verified
Journal Article
Open access
PDF file
Jaroslaw KoniorJaroslaw Konior
Jaroslaw Konior
The purpose of this article is to present the preparation of Project Risk Assessment Methodology and its mitigation in complex construction projects. The main text provides a summary of the approach, the method used and the findings. The conclusions have been drawn that the proper tools for quantifying risks have to be based on the criteria specific for mathematical statistic and probability or at least fuzziness. Function, which makes possible to categorize any risks into one of the five categories, is a combination of probability and the impact on one of the items: people and their safety or budget, cost, schedule and planning or quality and performance. An attempt was made to express numerically the relationship between risks impacts and their level of likelihood. Also, a method of associating the influence of projects risks impacts on the extent of the likelihood of project risk occurrence which makes possible to determine the direction and the strength of this relationship was presented.

9 August 2022 in Buildings
Verified
Journal Article
Open access
PDF file
Jaroslaw KoniorJaroslaw Konior
Jaroslaw Konior
The aim of the research results presented in the article was to develop a method that enables the analysis and evaluation of deviations at the stage of implementing a construction investment in various construction sectors. The new method was based on the well-known Earned Value Method (EVM). It was assumed that the monitoring of costs and the constant control of the implementation time of construction projects, with the simultaneous analysis of the level of deviations, allows for the consistent management of the investment task. Moreover, it ensures—in the required time—the adoption of appropriate improvement actions, and also enables the quantification of risk during the planning of an investment. The article attempts to prove the validity of the assumption about the necessity of the cyclical verification of the level of deviations in construction projects budget and schedule. Such an approach provides numerous perceptible benefits; such as the precise determination of the size of possible losses; an immediate reaction to risk; and the possibility of making changes at every stage of implementing an investment. On the basis of the analysis of the author’s own research carried out in three research groups of facilities (collective housing; hotels; and commercial and service facilities), an original attempt was made to determine the size of cost and time performance indexes of various investment tasks. The values of these performance indexes were determined, and are presented as quantile images in boxplots.

1 January 2019 in Civil Engineering and Architecture
Verified
Journal Article
Open access
PDF file
Jaroslaw KoniorJaroslaw Konior
Jaroslaw Konior
Technical, financial and organisational feasibility study methods in compliance with a Bank Investment Supervision requirements have been presented. Methodology of construction project appraisal for financing and execution professional preparation have been laid out – technical documentation, arrangements, realisation. Analysis and assessment of Bank Investment Supervision consisted of Project Execution Plan, geotechnical and environmental conditions, permit design, agreements and decision impacts of local authorities, engineering contract for construction works, project insurance and performance bonds, schedule of execution tasks and their costs, payment plan, investment budget and project economical effectiveness, scope of monthly construction works execution assessed by Earned Value Method approach, significant risks measurable assessment and handover procedure of construction project. Engineering, Project and Construction Management (EPCM) approach to investment process and solid, consequent, regular construction projects monitoring executed by professional Banking Supervision Inspector make possible to minimise any faults of inappropriate financing of construction projects.