Backfill mining is the most environmentally friendly mining method at present, which can effectively control the surface subsidence, improve the recovery rate, and has good social and economic benefits. The purpose of this study is to solve the environmental problems caused by solid waste, combined with the rich geographical advantages of aeolian sand in the Yushenfu mining area of China. The rheological properties of the aeolian sand-fly ash-based filling slurry with different fly ash content are studied by experiments, and the strength development law of the filling body under different age and fly ash content are studied from the macroscopic and microscopic points of view. The rheological experiments showed that the increase of the amount of fly ash has a significant effect on the thixotropy, plastic viscosity, and yield stress of the filling slurry. Additionally, rheological properties of aeolian sand-fly ash-based filling slurry conform to the Bingham model. With the increase of the amount of fly ash, the performance of the filling slurry has been significantly improved. Uniaxial test and scanning electron microscope observation showed that the influence of fly ash on the strength of the filling body was mainly reflected in the late stage of maintenance, but was not obvious in the middle stage. Fly ash particles mainly bear the role of “water reduction” and a physical filling effect, which makes the filling slurry thicker and the internal structure more closely spaced. The volcanic ash reaction of fly ash is lagging behind the hydration reaction of cement; the secondary product of the delayed reaction is filled in the pores of cement hydrates, which can greatly reduce the porosity of the backfill body and increase the later strength of the backfill body. It provides a guarantee for the safe replacement of coal pillars in the working face.
During strip backfilling mining in coal mines, the backfilling material is the main support structure. Therefore, studying the pressure law of the backfilling material is essential for the safe and efficient mining of coal resources. Based on research into strip backfilling mining at working face number 3216 of the Shanghe Coal Mine, and to smooth transition of overlying strata loads to the backfilling material, this study proposes a three-stage strip backfilling mining method. Based on thin-plate theory, an elastic thin-plate model, a reasonable spacing of strip mining is constructed, and the reasonable mining parameters of “mining 7 m to retain 8 m” at working face number 3216 of the Shanghe Coal Mine are determined. The law of backfilling pressure in three-stage strip backfilling mining is studied through numerical simulation and physical simulation experiments. The results show that field measurement results are basically consistent with the experimental results and numerical simulation results. When three-stage strip backfilling mining is adopted, the stage-one backfilling material is the main bearing body to which the overlying rock load transfers smoothly and gradually, and the structure of the “overburden-coal pillar (or backfilling strip)” in the stope remains stable. In three-stage strip backfilling mining, the overlying rock load is ultimately transferred to the stage-one backfilling material, the stage-two backfilling material is the auxiliary bearing body, and the stage-three backfilling material mainly provides long-term stable lateral support for the stage-one backfilling material.
Filling mining is an important direction in green coal mining. In the filling site, a layered filling body can be formed due to technological problems. In this paper, we take Shanghe Coal Mine (Shaanxi Province, China) as the background. In order to explore the mechanical properties and failure modes of layered backfill, specimens with different layered proportions (1:1, 1:3, 3:1) were made and studied concerning the aspects of wave velocity, porosity, strength and failure modes. The experimental result demonstrates that with the increase of curing time and fly ash (FA) content, the porosity of ASPLB decreases, the wave velocity and the strength increases. In addition, the layered structure has a significant effect on the strength and failure mode of the specimen. Uniaxial compression experiments showed that after 28 days of curing with Ratio III, the strength of layered backfill (LB) was reduced by 14% and the strength of 3:1 LB was increased by 16.7% and 40% compared with 1:1 LB and 1:3 LB, respectively. A digital speckle experiment showed that the failure mode of ASPLB is a vertical fracture without penetration, and the fracture propagation of layered ASPLB is hindered by the stratification. Based on the above research, the scheme that meets the requirements of the Shanghe Coal Mine is determined, and its reliability is verified, providing guidance for scientific stratification and the filling of gob.
Strip mining is the key technology to solve the problem of coal mining under water, so mastering the law of overburden load transfer in strip mining is the key to safe production in working face. We studied it in the context of the shallow seam No. 3 in the Shanghe Coal Mine (northern Shaanxi Province, China) through similarity simulation and field measurement analysis. A theoretical analysis, based on the concept of pressure arch, allowed the establishment of a continuous arch theoretical model for the strip coal pillars (or filling bodies) of the mine. A similar simulation study on strip filling and staged mining has previously shown that, in a first stage, the overlying strata load is mainly transferred to the remaining strip coal pillars; in a second stage, this load is mainly sustained by the odd-numbered strip coal pillars; finally, in a third stage, this load is mainly sustained by the first-stage strip filling body, while the third-stage filling body is not loaded. Our theoretical analysis showed that, during the first stage, the overlying rock load outside the arch was mainly sustained by the arch structure, while that inside of the arch was sustained by the filling body; in the second stage, the arch structure lost stability during the recovery of the even-numbered coal pillars and the arch axis developed upward, leading to the formation of a new arch with an odd number of coal pillars as the arch foot; in the third stage, after the recovery of the odd-numbered coal pillars, a new arch was formed. The arch foot of the new supporting structure was represented by the first-stage filling body; moreover, the load was mainly borne by the second-stage filling body, ensuring the stability of the overburden rock after mining. The theoretical analysis revealed that the pillar or filling body only bears part of the overburden load in strip filling mining. The pillar (filling body) load in correspondence of working face 3216 during each stage of filling was measured and analyzed, proving a continuous arch structure transformation between the pillar and the filling body. Finally, we verified the reliability of the proposed theoretical model.