Mechanical methods of tunnel excavation are widely used because of their high excavation output, and the selection of appropriate technology depends on ground composition and project-related features. Compared with tunnel boring machines (TBMs) and roadheaders, mechanical pre-cutting machines are used in tunnel widening and have proven to be reliable in tunnel capacity expansion. Compared to other machines, the excavation characteristics of pre-cutting machines are not systematically analyzed because of their rare use. In this study, the excavation characteristics of a pre-cutting machine are analyzed in a laboratory based on linear cutting tests performed on four rock specimens with different uniaxial compressive strengths. During testing, changes in tool forces, cutting volume, and specific energy are determined while maintaining different penetration depths, spacings, and rock strengths. The variations in these variables are selected accordingly. The results showed high similarity with the case of TBMs and roadheaders. However, in the excavation by the pre-cutting machine, the ratios of the peak-to-mean cutting forces and cutting-to-normal forces reached a maximum value at a specific s/p (spacing and penetration ratio), which is related to the optimal cutting conditions. This study can provide useful information for the operation and design of pre-cutting machines.
In the convergence–confinement method, the longitudinal deformation profile (LDP) serves as a graphical representation of the actual tunnel convergence (both ahead of and behind the face); therefore, it is considered important for determining the distance of support installation from the face or the timing after excavation in this method. The LDP is a function of the rock mass quality, excavation size, and state of in situ stresses; thus, obtaining the LDP according to the rock mass conditions is essential for analyzing the complete behavior of convergence during tunnel excavation. The famous LDP shows that the best fit for the measured values of tunnel internal displacement reported simply expresses the ratio of the preceding displacement as approximately 0.3. This can lead to an error when predicting the ratio of the preceding displacement while neglecting the rock conditions; consequently, a complete tunnel behavior analysis cannot be realized. To avoid such error, the finite difference method software FLAC 3D is used to develop an expanded longitudinal deformation profile (ELDP) according to the rock mass conditions. The ELDP is represented by graphs featuring different shapes according to the rock mass rating (RMR), and the empirical formula of the LDP best fitted for the tunnel convergence measurement values is expanded. This expanded LDP formula is proposed in a generalized form, including the parameters α and β from the empirical equation. These parameters α and β are expressed as functions of the RMR and initial stress. Statistical analysis results of the 3D numerical analysis of 35 cases were analyzed in the ranges of α = 0.898–2.416 and β = 1.361–2.851; this result is based on the empirical formula of Hoek (1999) (α = 1.1, β = 1.7), which was expanded in the current study according to the rock quality and initial stress conditions.