Han-eol Kim

Dr. Han-eol Kim

orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 November 2019 in Applied Sciences
Verified
Journal Article
Open access
PDF file
HKHan-eol Kim
Han-eol Kim
HRHafeezur Rehman
Hafeezur Rehman
WAWahid Ali
Wahid Ali
ANAbdul Muntaqim Naji
Abdul Muntaqim Naji
JKJung Joo Kim
Jung Joo Kim
HYHankyu Yoo
Hankyu Yoo
Empirical classification systems do not provide details of the factors that affect the performance of fully grouted rock bolts, as they are based on average values. Fully grouted rock-bolt patterns during tunnel-support design are a part of the composite support, and they are functions of rock-mass quality and tunnel span. Various fully grouted rock bolts are used in situ in different environments, along with other tunnel-support materials in static and dynamic environments during tunnel construction. The rock-bolt performances are evaluated through pull-out tests that follow ASTM standards. Several field pull-out tests were conducted on cement and resin grouted rock bolts. Under groundwater flow conditions, inflated steel tube rock bolts were tested and the results were compared with fully grouted rock bolts. Based on field experiments and previous studies, the factors that affect rock bolt performances are divided into five groups with respective sub-factors. Natural parameters cannot be controlled to ensure safety, economy, and stability in tunnels. The controllable factors, too, can be varied only within a practical range. In conclusion, the factors investigated here should be considered with the empirical support pattern of rock-mass classification systems for safe and economical design.

10 July 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
JYJiseok Yun
Jiseok Yun
HKHan-eol Kim
Han-eol Kim
HYHankyu Yoo
Hankyu Yoo
Ground settlement occurs because of the surrounding ground behavior during tunnel excavation. A high chance of its occurrence could cause the collapse of buildings; therefore, the accurate prediction and assessment of ground settlement are necessary when structures are concentrated in urban regions. This study leverages Geographic Information Systems (GIS) and 3D modeling to evaluate the effects of tunnel excavation on the ground settlement and damage of buildings along the Mandeok–Centum underground highway in Busan. It integrates the field topography with building data to simulate and visualize construction-induced interactions. Numerical analysis is used to assess the effects of the terrain elevation, building presence, excavation sequences, and lag distance between the twin tunnels on the settlement. The results indicate that high terrain elevation, dense building layouts, and shorter distances between tunnels increase settlement. Furthermore, this study deduces that bidirectional excavation causes a rapid increase in settlement compared with parallel excavation, which is evident from the variations in the inflection points during the excavation process. Finally, this study estimates the damage to buildings and ground settlements and visualizes risk maps using GIS, emphasizing the practicality of 3D modeling based on GIS.

15 April 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
HKHan-eol Kim
Han-eol Kim
MKMin-Seong Kim
Min-Seong Kim
WYWan-Kyu Yoo
Wan-Kyu Yoo
CKChang-Yong Kim
Chang-Yong Kim
In this study, a series of rock cutting tests was conducted using a conical pick to investigate the effect of joints on roadheader performance. Tests were performed on intact rock and jointed rock mass specimens with three different joint spacings. The results indicate that cuttability is enhanced in jointed rock mass compared to intact rock due to the influence of joints on fracture mechanics. When cutting perpendicular to the joint plane, joints shorten the fracture path for rock chip formation, reducing the cutting force (FC). In parallel cutting, the joint plane acts as a barrier to side-crack propagation, leading to a further reduction in FC. The FC and specific energy (SE) were generally lower in parallel cutting than in perpendicular cutting. However, when the cutting depth exceeded 0.2 times the joint spacing and the line spacing surpassed 0.4 times the joint spacing, this trend reversed. This occurred because joints hindered the interaction between adjacent cuts, causing a transition to an unrelieved cutting mode. Additionally, FC and SE increased with joint spacing. When joint spacing reached ten times the cutting depth, their values approached those of intact rock. This suggests that the joint effect becomes negligible. These findings provide a better understanding of the effect of joints on roadheader performance.

1 September 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
HKHan-eol Kim
Han-eol Kim
KNKyoung-Min Nam
Kyoung-Min Nam
HRHafeezur Rehman
Hafeezur Rehman
TKTae-Su Kyeon
Tae-Su Kyeon
HYHankyu Yoo
Hankyu Yoo
Rock fragments obtained by excavation can provide information for evaluating the excavation efficiency, for which the coarseness index (CI) and particle size parameters (d50, dMPS, and d′) are used. However, CI depends on the number and size of the sieves used, and the particle size parameters require mathematical calculations. In this study, the maximum diameter (dmax) of rock fragments was used as an indicator of the excavation efficiency. Linear cutting tests were performed and the rock fragments were sieved to obtain the CI and dmax. The relationship between dmax and CI was similar to that between other particle parameters and CI. dmax and CI increased with increasing penetration depth and spacing, but dmax followed a linear relationship, and CI demonstrated a power relationship. Both dmax and CI reached their maximum values at a specific ratio of spacing to penetration depth (s/p ratio) and were not affected by subsequent increases in s/p. The cutting force and volume had positive relationships with dmax and CI, linear with dmax and exponential with CI, whereas the specific energy (SE) had an inverse relationship, showing exponential and linear relationships with dmax and CI, respectively. When dmax was larger than a certain value, SE converged to a constant value. This study confirmed that dmax has an advantage over CI in determining excavation efficiency.

25 June 2025 in Buildings
Verified
Journal Article
Open access
PDF file
JYJiseok Yun
Jiseok Yun
HYHankyu Yoo
Hankyu Yoo
SHSungpil Hwang
Sungpil Hwang
WKWooseok Kim
Wooseok Kim
HKHan-eol Kim
Han-eol Kim
The Tunnel Boring Machine (TBM) method has gained attention as an eco-friendly tunneling technique, effectively reducing noise, vibration, and carbon emissions compared to conventional blasting methods. However, ground settlement and volume loss are inevitable during TBM excavation due to the deformation of the surrounding ground, which may even lead to ground collapse in severe cases. In this study, a Shield TBM model, validated using field data, was employed to perform numerical analyses on parameters such as tunnel diameter, ground elastic modulus, face pressure, and backfill pressure. Based on the simulation results, the influence of each parameter on settlement was evaluated, and a predictive model for estimating maximum settlement was developed. The proposed model was statistically validated using p-value assessment, variance inflation factor (VIF), coefficient of determination (R2), and residual analysis. Furthermore, the prediction model showed high agreement with the field data, yielding a prediction error of 8.25%. This study emphasizes the applicability of verified numerical modeling for accurately predicting ground settlement in Shield TBM tunneling and provides a reliable approach for settlement prediction under varying construction conditions.

16 January 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
HKHan-eol Kim
Han-eol Kim
SHSang-Gui Ha
Sang-Gui Ha
HRHafeezur Rehman
Hafeezur Rehman
HYHankyu Yoo
Hankyu Yoo
Mechanical methods of tunnel excavation are widely used because of their high excavation output, and the selection of appropriate technology depends on ground composition and project-related features. Compared with tunnel boring machines (TBMs) and roadheaders, mechanical pre-cutting machines are used in tunnel widening and have proven to be reliable in tunnel capacity expansion. Compared to other machines, the excavation characteristics of pre-cutting machines are not systematically analyzed because of their rare use. In this study, the excavation characteristics of a pre-cutting machine are analyzed in a laboratory based on linear cutting tests performed on four rock specimens with different uniaxial compressive strengths. During testing, changes in tool forces, cutting volume, and specific energy are determined while maintaining different penetration depths, spacings, and rock strengths. The variations in these variables are selected accordingly. The results showed high similarity with the case of TBMs and roadheaders. However, in the excavation by the pre-cutting machine, the ratios of the peak-to-mean cutting forces and cutting-to-normal forces reached a maximum value at a specific s/p (spacing and penetration ratio), which is related to the optimal cutting conditions. This study can provide useful information for the operation and design of pre-cutting machines.