Susanna Mocci

Prof. Susanna Mocci

Dipartimento di Ingegneria Elettrica ed Elettronica, Università degli Studi di Cagliari, Cagliari, Italy
orcid
Associate Professor of Power Systems at University of Caglia...

Research Focus & Metrics

Academic Career Length

24Years (2003-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 May 2005 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
GCGianni Celli
Gianni Celli
Emilio GhianiEmilio Ghiani
Emilio Ghiani
Susanna MocciSusanna Mocci
Susanna Mocci
FPFabrizio Pilo
Fabrizio Pilo
In the restructured electricity industry, the engineering aspects of planning need to be reformulated even though the goal to attain remains substantially the same, requiring various objectives to be simultaneously accomplished to achieve the optimality of the power system development and operation. In many cases, these objectives contradict each other and cannot be handled by conventional single optimization techniques. In this paper, a multiobjective formulation for the siting and sizing of DG resources into existing distribution networks is proposed. The methodology adopted permits the planner to decide the best compromise between cost of network upgrading, cost of power losses, cost of energy not supplied, and cost of energy required by the served customers. The implemented technique is based on a genetic algorithm and an /spl epsiv/-constrained method that allows obtaining a set of noninferior solutions. Application examples are presented to demonstrate the effectiveness of the proposed procedure.

7 March 2013 in IEEE Transactions on Smart Grid
Verified
Journal Article
Closed access
Guido CarpinelliGuido Carpinelli
Guido Carpinelli
GCGianni Celli
Gianni Celli
Susanna MocciSusanna Mocci
Susanna Mocci
Fabio MottolaFabio Mottola
Fabio Mottola
FPFabrizio Pilo
Fabrizio Pilo
Daniela ProtoDaniela Proto
Daniela Proto
Energy storage is traditionally well established in the form of large scale pumped-hydro systems, but nowadays is finding increased attraction in medium and smaller scale systems. Such expansion is entirely complementary to the forecasted wider integration of intermittent renewable resources in future electrical distribution systems (Smart Grids). This paper is intended to offer a useful tool for analyzing potential advantages of distributed energy storages in Smart Grids with reference to both different possible conceivable regulatory schemes and services to be provided. The Smart Grid Operator is assumed to have the ownership and operation of the energy storage systems, and a new cost-based optimization strategy for their optimal placement, sizing and control is proposed. The need to quantify benefits of both the Smart Grid where the energy storage devices are included and the external interconnected grid is explored. Numerical applications to a Medium Voltage test Smart Grid show the advantages of using storage systems related to different options in terms of incentives and services to be provided.

1 January 2005 in IEE Proceedings - Generation, Transmission and Distribution
Verified
Journal Article
Closed access
Guido CarpinelliGuido Carpinelli
Guido Carpinelli
GCGianni Celli
Gianni Celli
Susanna MocciSusanna Mocci
Susanna Mocci
FPFabrizio Pilo
Fabrizio Pilo
Angela RussoAngela Russo
Angela Russo
Distribution System Operators have the duty of managing the distribution system safely and efficiently. Distribution revenues are generally based on asset value but revenue systems based to some extent on network performance (e.g. on the level of losses or reliability) are becoming common in many countries. Thus the distribution planner has to maximise the profit of the investments for the system development and to improve the performance of the system as well. In many case the goals are conflicting and multiobjective planning criteria may be adopted to reduce network costs and investments and to maximise some specific performance (e.g. network reliability). Furthermore, with multiobjective programming the distribution planner has the possibility of choosing a trade-off solution in a set of acceptable solutions by applying criteria to minimise risks in uncertain scenarios. These features are particularly useful whether, according to the EU directive EU/2003/54, Embedded Generation (EG) and DSM are considered as possible planning alternatives to be compared with more traditional development actions in the search for the best solution to planning problems. In this context, a methodology is presented based on multiobjective programming and decision theory which helps the decision maker to find the best development plan for the system by using the EG as a development option and by explicitly managing risks and uncertainties. In particular, the proposed methodology solves the problem of maximising the network performance by optimising some power quality indicators, like voltage quality and harmonic distortion, and by minimising the network costs (e.g. energy losses or upgrade investments) with an optimised use of EG. For this reason, the problem of the optimal sizing and siting of EG has been reformulated as a constrained, multiobjective, and nondifferentiable optimisation problem. The main idea is to apply a double trade-off procedure: the first trade-off, by means of a multiobjective ɛ-constrained technique, allows a wide family of good EG siting and sizing solutions for all the scenarios considered (e.g. associated to a different set of wind speed at all the possible locations); the second one allows isolating the most robust solutions. In this way the planner is completely free to drive the optimisation in a certain direction without loosing objectivity and generality. Simulation results obtained by using the proposed procedure on a test system demonstrate that alternatives disregarded by the decision theory application can result the most interesting ones.

1 June 2009
Verified
Conference Paper
Closed access
GCGianni Celli
Gianni Celli
Susanna MocciSusanna Mocci
Susanna Mocci
FPFabrizio Pilo
Fabrizio Pilo
MLM. Loddo
M. Loddo
Energy storage, traditionally well established in the form of large scale pumped-hydro systems, is finding increased attraction in medium and smaller scale systems. Such expansion is entirely complementary to the wider uptake of intermittent renewable resources and to distributed generation in general, which are likely to present a whole range of new business opportunities for storage systems and their suppliers. In the paper, by assuming that distribution system operator has got the ownership and operation of storage, a new software planning tool for distribution networks able to define the optimal placement, rating and control strategies of distributed storage systems that minimize the overall network cost is proposed. This tool will assist the system operators in defining the better integration strategies of distributed storage systems in distribution networks and in assessing their potential as an option for a more efficient operation and development of future electricity distribution networks.

1 August 2015 in Electric Power Systems Research
Verified
Journal Article
Closed access
Susanna MocciSusanna Mocci
Susanna Mocci
NNNicola Natale
Nicola Natale
FPFabrizio Pilo
Fabrizio Pilo
SRSimona Ruggeri
Simona Ruggeri

1 November 2011 in Journal of Cleaner Production
Verified
Journal Article
Closed access
APArturs Purvins
Arturs Purvins
HWHeinz Wilkening
Heinz Wilkening
GFGianluca Fulli
Gianluca Fulli
ETEvangelos Tzimas
Evangelos Tzimas
GCGianni Celli
Gianni Celli
STSergio Tedde
Sergio Tedde