Abdullah M. Alsugair

Dr. Abdullah M. Alsugair

King Saud University, Riyadh, Ar Riyāḑ, Saudi Arabia
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 July 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
AAAbdullah M. Alsugair
Abdullah M. Alsugair
Khalid Saad A. Al-GahtaniKhalid Saad A. Al-Gahtani
Khalid Saad A. Al-Gahtani
NANaif M. Alsanabani
Naif M. Alsanabani
AAAbdulmajeed A. Alabduljabbar
Abdulmajeed A. Alabduljabbar
AAAbdulmohsen Almohsen
Abdulmohsen Almohsen
Forecasting the final construction contract duration at an early stage plays a vital role in the progress of a project. An inaccurate project duration prediction may lead to the project’s benefits being lost. It is essential to precisely predict the duration due to the presence of several different factors. This paper contributed to developing a model to predict final construction contract duration (FCCD) in the early stages based on parameters characterized as few and shared for any contract. (contract cost, contract duration, and sector). This paper developed an Artificial Neural Network (ANN) model based on 135 Saudi construction project data. The development model has three stages. The first stage was standardization and augmentation using Zavadskas and Turskis’ logarithmic and Pasini methods. The second and third stages were the first and second analyses of the ANN models, respectively. The first analysis aimed to promote the used data and integrate them into the second analysis to develop the ANN model. The ANN models were compared with three linear regression (LR) models (LR1, LR2, and LR3) and other models in the literature. The results revealed that the accuracy of the ANN model provides reasonable accuracy with an average mean absolute percentage error (MAPE) of 12.22%, which is lower than the LR3′s MAPE by 27.03%. The accuracy of the ANN model is similar to that of earned value management (EVM) in the previous study. This paper supports research to deal with relatively little data and integrate them into a neural network. The ANN model assists the stakeholder in making appropriate decisions for the project during the pre-tendering phase by predicting the actual contract duration based on the CC, CD, and project sector.

7 December 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
AAAbdullah M. Alsugair
Abdullah M. Alsugair
Miscalculations during cost estimation can have adverse effects on construction projects, including delaying or canceling planned projects, reducing project scope, and creating considerable financial risks for both owners and contractors. The objective of this research was to identify the major factors that cause cost deviation and study the effect of the interaction between these factors on cost deviation prior to the tender phase of construction projects in the Kingdom of Saudi Arabia. This was accomplished by carrying out a comprehensive literature review of the factors affecting cost deviation; implementing a survey questionnaire for project participants, including contractors, consultants, and clients, who are aware of the construction industry in Saudi Arabia; and developing a model for cost deviation based on the questionnaire data using the partial least square structural equation model (PLS-SEM). The cost deviation model was developed, and the PLS-SEM provided the critical factors affecting cost deviation and gave theoretical support for the study’s conceptual framework. The results revealed that the problem is shared by the owners and contractors, as the factors with the highest rankings were project characteristics, contractual procedures, and estimator performance. The study also showed that the issue of cost deviation is more important to owners than contractors, as the predictive relevance of project characteristics, contractual procedures, and estimator performance were 0.229, 0.335, and 0.197, respectively, for the client–consultant model, and 0.117, 0.118, and 0.292, respectively, for the contractor model. The results indicate the need to control the highest-ranked factors to enhance the efficiency of the cost estimation process. This study contributes to the body of knowledge by generating the PLS-SEM model that takes into account the indirect relationships among affecting cost deviation factors and considers these relationships while preparing the bid to reduce the deviation cost.

14 February 2024 in Heliyon
Verified
Journal Article
Open access
AAAbdullah M. Alsugair
Abdullah M. Alsugair
Khalid Saad A. Al-GahtaniKhalid Saad A. Al-Gahtani
Khalid Saad A. Al-Gahtani
NANaif M. Alsanabani
Naif M. Alsanabani
GHGhalib M. Hommadi
Ghalib M. Hommadi
MAMarwan I. Alawshan
Marwan I. Alawshan
Actual cost fluctuations in construction projects are common in the construction industry, including the Kingdom of Saudi Arabia (KSA). This study's objective is to establish a simulation forecasting model for Saudi projects' cost changes that will be used to anticipate the actual cost spent at the project's end. It also indicates if there are cost overruns or savings by considering ten identified cost-risk impact factors. The study involves a systematic, integrated approach to developing system dynamics (SD) to reflect the ten cost overrun impact factors (COICs) in the KSA construction industry. Thus, the Decision-Making Trial and Evaluation Laboratory (DEMATEL) technique aids in evolving a Causal Loop Diagram (CLD) in the SD modeling stages. After performing the consistency and extreme tests, the model is verified by being applied in two case studies (an academic building and an infrastructure project) in Riyadh City, KSA. The main findings reveal that the model provided cost savings for the first and second case studies of 4.8% and 3.76%, respectively. Different experts have evaluated the developed dynamic system. According to the experts who support the developed model, the model is applicable if the contractor has a reasonable profit margin. In contrast, opponents' experts noted that the system still generates a profit margin despite change orders and project delays. The main conclusion that the experts recognize is that the approach successfully considered the relationships between the influencing factors. The findings can be utilized to create an integrated conceptual framework for construction management, which could result in a rapid and profitable project launch.

16 March 2023 in Buildings
Verified
Journal Article
Open access
PDF file
AAAbdullah M. Alsugair
Abdullah M. Alsugair
NANaif M. Alsanabani
Naif M. Alsanabani
Khalid Saad A. Al-GahtaniKhalid Saad A. Al-Gahtani
Khalid Saad A. Al-Gahtani
Raising the final contract cost (FCC) is a significant risk for project owners. This study hypothesizes that the factors that cause owner’s cost estimation (OCE) accuracy and FCC changes share the same causes, and a case study confirmed that the two variables (OCE and FCC) could be correlated. Accordingly, this study aims to develop a forecast model to predict FCC on the basis of the initial OCE, which has not been studied previously. This study utilized data from 34 Saudi Arabian projects. Two linear regression models developed the data, and the square root function transformed the data. Moreover, the artificial neural network (ANN) model was developed after data standardization using Zavadskas and Turskis’ logarithmic method. The results showed that the ANN model had a MAPE smaller than the two linear regression models. Using Zavadskas and Turskis’ logarithmic standardization method and elimination of data that had an absolute percentage error (APE) of more than 35% led to an increase in ANN model accuracy and provided a MAPE value of less than 8.5%.

15 June 2022 in Cogent Engineering
Verified
Journal Article
Open access
ASAmmar M. Saud
Ammar M. Saud
Khalid Saad A. Al-GahtaniKhalid Saad A. Al-Gahtani
Khalid Saad A. Al-Gahtani
AAAbdullah M. Alsugair
Abdullah M. Alsugair
The building material selection among different options is a crucial issue affected by quality and cost. The implementation of the value engineering (VE) process is challenging. Thus, this paper proposes a framework for automating the VE process and integrating it with the decision-making process for building material selection. Moreover, this process becomes easily applicable by using Building Information Modelling (BIM). This study’s research methodology combines VE, Analytical Hierarchy Process (AHP), Pairwise, and Function Analysis System Technique (FAST) methods to select the best choice of eight assemblies of exterior walls based on nine identified criteria. Moreover, a questionnaire is used to validate the chosen criteria weights. Furthermore, a case study of a commercial building is conducted. Eight assemblies of exterior walls are modeled and evaluated using the proposed framework. Finally, the results are presented to three experts to receive their feedback, and it shows that the proposed framework gives a reliable evaluation of the value of each alternative. The programmed framework with BIM is a great aid to the decision-maker to select the most valuable materials during the design stage. This study gives guidance to future studies to standardize the external walls alternative to be evaluated more efficiently.

22 April 2022 in Infrastructures
Verified
Journal Article
Open access
PDF file
AAAbdulkareem H. Alanazi
Abdulkareem H. Alanazi
Khalid Saad A. Al-GahtaniKhalid Saad A. Al-Gahtani
Khalid Saad A. Al-Gahtani
AAAbdullah M. Alsugair
Abdullah M. Alsugair
Despite advancing Internet of Things (IoT) technologies, road projects often rely on inaccurate supplier data, making it difficult to determine the cost, quantity, quality, and transportation duration of the needed materials. The wrong choice of material suppliers can lead the supply chain to suffer losses, directly affecting the project’s performance. In this regard, many studies have devised material logistics optimization models for road projects. However, the majority based their decisions on inaccurate or outdated data. This paper studies this gap by introducing a framework that utilizes IoT technologies and smart construction to feed optimization models with accurate and dynamically updated material data. This IoT-powered framework considers only quantitative criteria as input data to the integrated linear programming optimization model, precisely selected suppliers, and optimally calculated costs using MS Excel Solver. The results reveal that the framework is sensitive to any dynamic data updates and can achieve up to 40% material cost savings in real runtime. The paper demonstrates the proposed outline framework with a case study of planning an alternative road between Riyadh and Madinah cities in Saudi Arabia.