Al-Sifao A. Abdalla Al-Sifao

Mr. Al-Sifao A. Abdalla Al-Sifao


Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 February 2026 in Applied Sciences
Verified
Journal Article
Open access
PDF file
AAAl-Sifao A. Abdalla Al-Sifao
Al-Sifao A. Abdalla Al-Sifao
NPNikola Petrović
Nikola Petrović
RJRadiša Jovanović
Radiša Jovanović
UBUglješa Srbislav Bugarić
Uglješa Srbislav Bugarić
To address water shortages, Libya has undertaken one of the most significant global civil infrastructure projects, the Great Man-Made River Project, aimed at transporting groundwater from southern well-fields to densely populated northern cities. The second phase of the project consisted of installing the water supply system, which comprises 479 well pumps, united to deliver around 2 million cubic meters of water to the north. Historical performance data for the water supply system were analyzed, and a model for the system’s reliability calculation was developed: a finite-source, multi-server queuing system with spares (M/M/c//N/Y). The model enabled the analytical calculation of the system’s reliability in different configurations. Each configuration was assessed using a unique risk score, defined as the product of reliability-based parameters and the consequences associated with water-shortage events resulting from system failures. The analysis identified two alternative configurations that satisfy all predefined performance and risk criteria. Both configurations require fewer resources than the original system design, with up to seven fewer spare pumps, allowing for decision-makers to select the most appropriate option based on additional operational and contextual considerations.